[vc_row][vc_column offset=”vc_col-lg-9 vc_col-md-9″ el_class=”order-2″][breadcrumb-shortcode][vc_column_text css=””]

CSRR GIS Deliverables

CSRR Regulations, specifically Administrative Requirements for the Remediation of Contaminated Sites [pdf] (ARRCS Rule) (N.J.A.C 7:26C-1.6) and the Technical Requirements for Site Remediation [pdf] (N.J.A.C. 7:26E), require the submittal of GIS compatible maps for several key elements of the remedial investigation / remediation. The Regulations require the submission of GIS deliverables throughout the investigation and remediation of contaminated sites.

Prior to submitting any GIS deliverables to CSRR, please review the following:

CSRR receives these GIS deliverables via email at specifically designated email addresses or through the online service as specified in the guidance document links below. The GIS deliverables are:

General Site Information
Submission Type: Areas of Concern / Site Boundaries [pdf]
Deliverable: Polygon
Key Document: PA / SI / RI
Submission Type: Site Location [pdf]
Deliverable: Single Point (Email)
Key Document: n/a
Institutional Control
Submission Type: Classification Exception Area (CEA) [pdf]
Deliverable: Polygon
Key Document: RIR or GW RA Permit Application
Submission Type: Deed Notice / Engineering Controls [pdf]
Deliverable: Polygon
Key Document: Soil RA Permit Application
Immediate Environmental Concern (IEC)
Submission Type: Currently Known Extent (CKE) [pdf] – Potable Well IEC Only
Deliverable: Polygon
Key Document: Engineered Response Action Report,
IEC Source Control (SC) Report, or
IEC Response Action Report
Receptor Evaluation (ground water)
Submission Type: Well Search [pdf]
Deliverable: Multiple Points (Spreadsheet)
Key Document: Initial – 120 days after GW contamination detected
Additional – IEC SC Report, RI, RA
Remedial Action Outcome (RAO) Notice Inserts
Submission Type: Indeterminate Vapor Intrusion Pathway (IVIP) [pdf]
Deliverable: Polygon
Key Document: RAO
Submission Type: Long-Term Vapor Intrusion Monitoring (LTM) [pdf]
Deliverable: Polygon
Key Document: RAO
Linear Construction
Submission Type: Linear Construction [pdf]
Deliverable: Polygons
Key Document: Linear Construction Report

Note: Polygons must be submitted as an Esri polygon shapefile or CAD dwg file.[/vc_column_text][/vc_column][vc_column offset=”vc_col-lg-3 vc_col-md-3″ el_class=”order-1 swap-on-mobile”][vc_column_text]

[/vc_column_text][/vc_column][/vc_row]