[vc_row][vc_column][vc_empty_space][vc_message css=””]On November 7, 2025, the NJDEP Division of Land Resource Protection approved permits for the Transco NESE project. Specifically the Division approved a Freshwater Wetlands Individual Permit, Coastal Wetlands Permit, Flood Hazard Area Individual Permit, Flood Hazard Area Verification, In-Water and Upland Waterfront Development Permits and a Water Quality Certificate. View the permit decision.
On January 12, 2026, the NJDEP Division of Air Quality and Radiation Protection approved an air pollution control preconstruction permit and certificate to operate for the Transco Compressor Station 206. View the final permit.[/vc_message][/vc_column][/vc_row][vc_row][vc_column][vc_column_text css=””]The NESE Project is a proposed expansion of Transco’s existing system from Pennsylvania through New Jersey to New York, to provide 400,000 dekatherms per day (Dth/d) of incremental capacity to Transco’s existing Rockaway Transfer Point located approximately three miles offshore of the Rockaway Peninsula in Queens Borough, New York. The regulated portions of the proposed NESE project would involve the construction and installation of three components in New Jersey: (1) construction of a new gas-fired compressor station (CS 206) with connecting discharge piping (2) the Madison Loop, and (3) the Raritan Loop (offshore). Please see below links for the permit plan cover sheets depicting the Project facilities. For awareness, in Pennsylvania, the Project includes 10.1 miles of 42” diameter pipeline as well as upgrades to Transco’s existing compressor station 200.
Below is pertinent information about the three Project components in New Jersey.
Compressor Station 206 [all facility components will be located on Block 5.02, lots 20 and 23 in Franklin Township, Somerset County]
Suction & Discharge Piping:
-
- Construction of suction and discharge piping will connect proposed Compressor Station 206 with Transco’s existing Mainlines A and C
- The proposed suction/discharge piping will result in the permanent disturbance of 0.852 acres of freshwater wetlands and 0.487 acres of transition areas and will temporarily disturb 0.149 acres of freshwater wetlands and 0.449 acres of transition areas
Compressor Station 206:
-
- Preconstruction Permit to Construct and Operate Emergency Generator
- Preconstruction Permit to Construct and Operate Two Mars 100 (or equivalent) 16,000 hp turbines
- General Permit for condensate storage tank
Higgins Access Road
-
- Located on Block 5.02, Lot 26.01
- Transco proposes to extend the existing access road on the Higgins property to the Compressor Station 206 site
Madison Loop
- The Madison Loop would be co-located within existing Transco right of way in Sayreville and Old Bridge Townships, Middlesex County
- Consists of approximately 3.43 miles of new 26-inch-diameter gas pipeline
- The Madison Loop will result in temporary impacts to 1.968 acres of mapped coastal wetlands, 1.32 acres of riparian zone vegetation, of which 0.67 acres is previously disturbed, 0.157 acres of State open waters and 1.987 acres of freshwater wetlands; and the permanent disturbance to 0.327 acres of freshwater wetlands, 1.143 acres of transition areas and 0.415 acres of riparian zone vegetation
Raritan Loop
- The Raritan Loop would begin within the upland waterfront development area in Middlesex County and extend into and under Raritan Bay
- The Raritan Loop, as proposed, would consist of approximately 5.95 miles of new 26-new diameter pipeline in New Jersey waters and 0.16 miles onshore
- Terminus will be at mile marker 35+49 at the Rockaway Delivery Lateral in New York State waters
The Department issued all of the necessary air permits for CS 206 in or around 2017 which are expired. However, the Division of Land Resource Protection ultimately denied Transco’s permit applications in May 2020.
The 2025 application materials can be viewed using the drop-down menus which contain information separated into the following sub-sections: Application Summary Sheet, GIS Site Plans, Environmental Reports, and Prior Public Comment.
If you wish to download all forty-nine (49) files show below, please utilize the “Download Complete Information.Zip”
Please note: Information below is for public reference and files been redacted to protect the privacy of land owners. For a complete review of all available information please submit a request to our Record Access Program located at https://www.nj.gov/dep/opra/opraform.html.[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_column_text css=””]The public comment period for Transcontinental Gas Pipeline Northeast Supply Enhancement Project (NESE) DLRP File No. 0000-25-0012.1 LUP2500001 has concluded.[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_row_inner disable_element=”yes”][vc_column_inner][vc_column_text css=””]VIRTUAL PUBLIC HEARING
The NJ Department of Environmental Protection (NJDEP) is announcing a virtual fact-finding public hearing for an application for the Transco – NESE Project. Members of the public who wish to participate in the hearing may participate via Microsoft Tams and those planning to offer oral comments at the hearing may pre-register to do so. NOTE: It is not required to pre-register to speak at the hearing, however, those who do complete the pr-registration form will be called first to speak.
The virtual Microsoft Teams public hearing will be held on September 10, 2025, from 6:00 to 9:00 PM. NJDEP will be accepting written comments throughout the application review process; however, all comments must be submitted within fifteen (15) days of the close of the public hearing (by September 25, 2025).[/vc_column_text][/vc_column_inner][/vc_row_inner][vc_row_inner disable_element=”yes”][vc_column_inner width=”1/3″][vc_btn title=”Public Comment Page” color=”info” size=”lg” align=”center” i_type=”openiconic” i_icon_openiconic=”vc-oi vc-oi-pin” css=”” button_block=”true” add_icon=”true” link=”url:https%3A%2F%2Fdeptest.nj.gov%2Fnese%2Fcontact-us%2F”][/vc_column_inner][vc_column_inner width=”1/3″][vc_btn title=”Public Hearing Pre-Registration Form” color=”info” size=”lg” align=”center” i_type=”openiconic” i_icon_openiconic=”vc-oi vc-oi-pin” css=”” button_block=”true” add_icon=”true” link=”url:https%3A%2F%2Fforms.office.com%2Fg%2FeGBVFedV8N|target:_blank”][vc_column_text css=””]
NOTE: It is not required to pre-register to speak at the virtual public hearing however, those who do complete the pre-registration form will be called first to testify.
[/vc_column_text][/vc_column_inner][vc_column_inner width=”1/3″][vc_btn title=”Public Hearing (Teams)” color=”info” size=”lg” align=”center” i_icon_fontawesome=”fa fa-solid fa-tv” css=”” button_block=”true” add_icon=”true” link=”url:https%3A%2F%2Fteams.microsoft.com%2Fl%2Fmeetup-join%2F19%253ameeting_N2NkMzI2YjYtNDU1OC00ZWJiLTgwNDktNjAzMGM0MjExZjUz%2540thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%25225076c3d1-3802-4b9f-b36a-e0a41bd642a7%2522%252c%2522Oid%2522%253a%2522fcaa61f0-db31-4ce4-9509-7ba584425017%2522%257d|target:_blank”][vc_column_text css=””]
Join the virtual public hearing on September 10, 2025, at 6:00 pm
Meeting ID: 242 845 649 760 0
[/vc_column_text][/vc_column_inner][/vc_row_inner][/vc_column][/vc_row][vc_row][vc_column][vc_tta_accordion color=”white” spacing=”1″ gap=”2″ c_icon=”chevron” c_position=”right” active_section=”-1″ title=”Documents”][vc_tta_section title=”Permit Application Summary Sheet (1 file)” tab_id=”permit-application-summary”][vc_column_text css=””]
[/vc_column_text][/vc_tta_section][vc_tta_section title=”GIS/Site Plans (10 files)” tab_id=”gis-site-plans”][vc_column_text css=””]
- GIS-Raritan Bay
- GIS-OBC compressor area
- GIS-Madison Bay Loop
- Crossing of Railroad
- Post Construction Stormwater Management
- Land Use Permit Plans
- GIS Zip Files
- Originally Submitted Site Plans (ZIP – 6 files)
- Revised 06/13/2025 Site Plans (ZIP – 6 files)
- Revised 08/21/2025 Post Construction Stormwater Management
[/vc_column_text][/vc_tta_section][vc_tta_section title=”Environmental Reports (31 files)” tab_id=”environmental-reports”][vc_column_text css=””]
- Williams NESE NJDEP_Compliance Statement_5.22.2025
- Williams NESE Transmittal letter to NJDEP (5.30.25)Final
- Williams NESE NJDEP Environmental Rpt_5.22.2025
- Williams NESE NJDEP_Environmental Rpt APPENDIX A_Agency Correspondence
- Williams NESE NJDEP_Environmental Rpt APPENDIX A_NJDEP NHP Letters
- Williams NESE NJDEP_Environmental Rpt APPENDIX B_Tax Maps
- Williams NESE NJDEP_Environmental Rpt APPENDIX Alternative Analysis
- Williams NESE NJDEP_Compliance Statement APPENDIX C_Swamp Pink
- Williams NESE NJDEP_Compliance Statement APPENDIX D_Bog Turtle
- Williams NESE NJDEP_Environmental Rpt APPENDIX D_Site Photos
- NESE NJDEP_Compliance Statement APPENDIX E_Stormwater Management Report
- Williams NESE NJDEP_Environmental Rpt APPENDIX E_Wetland Delineation Report
- Willliams NESE NJDEP_Environmental Rpt APPENDIX F_Onshore Feasibility Memos
- Williams NESE NJDEP_Compliance Statement APPENDIX F_Noise Modeling
- Williams NESE NJDEP_Environmental Rpt APPENDIX G_HDD Contingency Plan
- Willams NESE NJDEP_Compliance Statement APPENDIX G_Material Management Plan
- Compliance Statement APPENDIX H_NJDEP FHA Stream Crossing Engineers Report
- Attachment D_Williams NESE NJDEP_Environmental Rpt APPENDIX H_Offshore SSAP
- DEP_Compliance Statement APPENDIX I_NESE CS206 Engineers Report 5-21-25
- Williams NESE NJDEP_Environmental Rpt APPENDIX I_Sediment Sampling Data
- Williams NESE NJDEP_Compliance Statement APPENDIX J_FEMA Maps
- Williams NESE NJDEP_Environmental Rpt APPENDIX J_Offshore Env. Sampling Rpt
- Williams NESE NJDEP_Compliance Statement APPENDIX K_NJDEP Floodway Maps
- Williams NESE NJDEP_Environmental Rpt APPENDIX K_Upland Agreement 2020
- Williams NESE NJDEP_Environmental Rpt APPENDIX L_Hydro. & Sediment Modeling
- NESE NJDEP_Compliance Statement APPENDIX L_Risk to Ecological Receptors
- Williams NESE NJDEP_Environmental Rpt APPENDIX M_WQ Monitoring Plan
- Williams NESE NJDEP_Environmental Rpt APPENDIX N_Barred Owl Surveys
- Revised 8/21/2025 – Williams NESE Stormwater Management Report
- Revised 8/21/2025 – Williams NESE Response To Technical Deficiency Letter
- Revised 8/21/2025 – Williams NESE Appendix I Sediment Sampling Data Tables 4-7
[/vc_column_text][/vc_tta_section][vc_tta_section title=”Prior Public Comment (3 files)” tab_id=”prior-public-participation”][vc_column_text css=””]
- Response-to-Public-Comments_Consolidated_2018-2020
- Public_Hearing_Transcript and Comments_2018-2019
- Extensive Public Comment Supplement_6.10.2025
[/vc_column_text][/vc_tta_section][vc_tta_section title=”Notice of Public Hearing (2 files)” tab_id=”public_hearing_notice”][vc_column_text css=””]
[/vc_column_text][/vc_tta_section][/vc_tta_accordion][/vc_column][/vc_row][vc_row][vc_column offset=”vc_hidden-lg vc_hidden-md vc_hidden-sm vc_hidden-xs”][gravityform id=”1″ title=”true” description=”false” ajax=”false”][/vc_column][/vc_row]