MS4 Permits
[vc_row][vc_column][vc_column_text css=””]Below, please find the available documents for your specific MS4 Permit. There are three Municipal Separate Storm Sewer System (MS4): the Tier A, Highway Agency, and Public Complex. All three permits authorize the discharge from publicly owned MS4 systems. The Tier A Permit applies to a majority of NJ municipalities. The Highway Agency Permit authorizes the discharge of stormwater from highways or other thoroughfares operated by counties or by entities such as the NJ Department of Transportation, NJ Turnpike Authority, and the South Jersey Transportation Authority. The Public Complex Permit authorizes the discharge of stormwater from large publicly owned complexes such as colleges, universities, prisons, and hospital complexes.
- If the contact information for your Stormwater Program Coordinator (SPC) has changed, please fill out the SPC Information Update Sheet here.
- To see the County Case Manager List, click here.
[/vc_column_text][/vc_column][/vc_row][vc_row equal_height=”yes”][vc_column width=”1/3″][info-box-shortcode icon=”fa fa-solid fa-house” title=”Tier A”]
- Final Minor Modification Tier A Permit (effective 11/1/2023)
- Final Renewal Tier A Master General Permit (effective 1/1/2023 without comments) – Revised 12/9/2022
- Final Renewal Tier A – Response to Comments (1/1/2023)
- Deliverables Timeline
- Draft 2023 Renewal Tier A Master Permit
[/info-box-shortcode][/vc_column][vc_column width=”1/3″][info-box-shortcode icon=”fa fa-solid fa-school” title=”Public Complex”]
- Final Renewal Public Complex Permit (effective 01/01/2024)
- Deliverables Timeline
- Draft Renewal Public Complex Master Stormwater GP (issued 9/7/2023)
[/info-box-shortcode][/vc_column][vc_column width=”1/3″][info-box-shortcode icon=”fa fa-solid fa-road” title=”Highway Agency”]
- Final Renewal Highway Agency Master Stormwater GP (effective 01/01/2025)
- 2025 Highway Agency Deliverables Timeline
- Draft Renewal Highway Agency Master Stormwater GP (issued 8/23/2024)
- Final Renewal Highway Agency Master Stormwater GP (effective 01/01/2020)
- Draft Renewal Highway Agency Master Stormwater GP (issued 8/21/2019)
[/info-box-shortcode][/vc_column][/vc_row][vc_row][vc_column][vc_empty_space][/vc_column][/vc_row][vc_row equal_height=”yes”][vc_column][info-box-shortcode]
[/info-box-shortcode][/vc_column][/vc_row][vc_row][vc_column][vc_empty_space][/vc_column][/vc_row][vc_row][vc_column][vc_empty_space][/vc_column][/vc_row]
OFFICIAL SITE OF THE STATE OF NEW JERSEY