{"id":4285,"date":"2023-02-01T19:29:05","date_gmt":"2023-02-01T19:29:05","guid":{"rendered":"https:\/\/deptest.nj.gov\/srp\/?page_id=4285"},"modified":"2026-03-30T18:55:50","modified_gmt":"2026-03-30T18:55:50","slug":"update-log","status":"publish","type":"page","link":"https:\/\/deptest.nj.gov\/srp\/forms\/update-log\/","title":{"rendered":"Update Log"},"content":{"rendered":"<p>[vc_row][vc_column][breadcrumb-shortcode][vc_column_text css=&#8221;&#8221;]<\/p>\n<h4 class=\"topic-header\">CSRR Forms Update Log<\/h4>\n<p class=\"text-right\"><strong>Quick Jumps to the Forms&#8217; Update Log<\/strong><\/p>\n<table class=\"table text-14 align-top\">\n<tbody>\n<tr>\n<td class=\"border-right\">\n<ul class=\"listToCforms\">\n<li><a href=\"#7_5_cost_rem_summary\">7.5 Percent Cost of Remediation Summary and Certification<\/a><\/li>\n<li><a href=\"#alt_rem_app_form\">Alternative Remedy Application Form<\/a><\/li>\n<li><a href=\"#alt_rem_standard\">Alternative or New Remediation Standard and\/or Screening Level Application form<\/a>\n<ul>\n<li><a href=\"#r_s_notification\">Remediation Standard Notification Spreadsheet<\/a><\/li>\n<\/ul>\n<\/li>\n<li><a href=\"#annual_remfee\">Annual Remediation Fee Reporting form<\/a>\n<ul>\n<li><a href=\"#annual_remfee_online\">Annual Remediation Fee Reporting form (Online)<\/a><\/li>\n<\/ul>\n<\/li>\n<li><a href=\"#cid\">Case Inventory Document Worksheet<\/a>\n<ul>\n<li><span class=\"cellFormName\"><a href=\"#cid_ins\">Case Inventory Document Instructions<\/a><\/span><\/li>\n<\/ul>\n<\/li>\n<li><a href=\"#cea_wra\">CEA\/Well Restriction Area (WRA) Fact Sheet form<\/a><\/li>\n<li><a href=\"#child_care_center_ef\">Child Care Center\/Educational Facility Remediation Form<\/a><\/li>\n<li><a href=\"#child_care_pa\">Child Care PA, Clean PASI, or Clean SI Standalone Report Submissions<\/a><\/li>\n<li><a href=\"#confidentiality\">Confidentiality Request Form<\/a><\/li>\n<li><a href=\"#confirmed_discharge\">Confirmed Discharge Notification form<\/a><\/li>\n<li><a href=\"#cdn_online\">Confirmed Discharge Notification (CDN) Service &#8211; Online<\/a><\/li>\n<li><a href=\"#cover_cert\">Cover\/Certification Form<\/a><\/li>\n<li><span class=\"cellFormName\"><a href=\"#devcert\">Developer Certification (Appendix)<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#discharge_gw_pbr\">Discharge to Ground Water Permit by Rule Authorization Request<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#exemption_spill_act\">Exemption from Spill Act Liability Certification<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#doc_submission\">Document Submission form<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#labdata\">Full Laboratory Data Deliverables form<\/a><\/span><\/li>\n<li><a href=\"#gin_online\">General Information Notice (GIN) Service &#8211; Online<\/a><\/li>\n<li><a href=\"#gw_rem_act_permit_plan\">Ground Water Monitoring Plan Spreadsheet for Ground Water Remedial Action Permit<\/a><\/li>\n<li><span class=\"cellFormName\"><a href=\"#hdsrf_application\">Hazardous Discharge Site Remediation Fund Application form<\/a><\/span>\n<ul>\n<li><span class=\"cellFormName\"><a href=\"#hdsrf_cost\">HDSRF Application &#8211; Cost Estimate Format Spreadsheet<\/a><\/span><\/li>\n<\/ul>\n<\/li>\n<li><a href=\"#childcare\">HDSRF Child Care Facility Grant Application<\/a><\/li>\n<li><a href=\"#hap_request\">Historically Applied Pesticides Deferral Request<\/a><\/li>\n<\/ul>\n<\/td>\n<td class=\"border-right\">\n<ul class=\"listToCforms\">\n<li><span class=\"cellFormName\"><a href=\"#iec_response\">IEC Response Action form<\/a><\/span>\n<ul>\n<li><span class=\"cellFormName\"><a href=\"#iec_direct_contact\">IEC &#8211; Direct Contact Spreadsheet<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#iec_potable_water\">IEC &#8211; Potable Water Spreadsheet<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#iec_vi\">IEC &#8211; Vapor Intrusion Spreadsheet<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#iec_mm_checklist\">IEC &#8211; Monitoring and Maintenance Checklist<\/a><\/span><\/li>\n<\/ul>\n<\/li>\n<li><a href=\"#ia_rap\">Indoor Air Monitoring Plan Spreadsheet for Indoor Air RAP<\/a><\/li>\n<li><a href=\"#iana_factsheet\">Indoor Air Notification Area (IANA) Fact Sheet Form<\/a><\/li>\n<li><span class=\"cellFormName\"><a href=\"#isra_alt_comp\">ISRA Alternate Compliance Option Application<\/a><\/span><\/li>\n<li><a href=\"#isra_limconv\">ISRA Certificate of Limited Conveyance Application<\/a><\/li>\n<li><a href=\"#de_minimis\">ISRA De Minimis Quantity Exemption Application form<\/a><\/li>\n<li><span class=\"cellFormName\"><a href=\"#gin\">ISRA General Information Notification<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#remcert\">ISRA Remediation Certification form<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#linear_construction\">Linear Construction Project<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#lnapl\">LNAPL Free Product Reporting Form<\/a><\/span><\/li>\n<li><a href=\"#lsrp_focused_permit\">LSRP Focused Permit IV Supplemental Certification for RAP Administratively Change Application<\/a><\/li>\n<li><span class=\"cellFormName\"><a href=\"#lsrp_notification01\">LSRP Notification of Retention or Dismissal<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#model_deed_notice\">Model Deed Notice (Appendix B)<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#tem_deednotice\">Model Termination of Deed Notice (Appendix)<\/a><\/span><\/li>\n<li><a href=\"#mon_well_a\">Monitoring Well Certification Form A<\/a><\/li>\n<li><a href=\"#mon_well_b\">Monitoring Well Certification Form B<\/a><\/li>\n<li><a href=\"#noi_air_rap\">NOI Initial Indoor Air RAP Application Checklist<\/a><\/li>\n<li><a href=\"#notification_form\">Notice of Failure to Comply with a Mandatory or Expedited Site-specific Remediation Timeframe<\/a><\/li>\n<li><span class=\"cellFormName\"><a href=\"#ust_closure\">Out of Service Extension Request for an Underground Storage Tank System<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#oversight_service\">Oversight Services<\/a><\/span>\n<ul>\n<li><span class=\"cellFormName\"><a href=\"#direct_oversight\">Direct Oversight<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#traditional_oversight\">Traditional Oversight<\/a><\/span><\/li>\n<\/ul>\n<\/li>\n<li><span class=\"cellFormName\"><a href=\"#pust_application_reg\">Petroleum UST Fund Application (Regulated)<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#pust_application_unreg\">Petroleum UST Fund Application (Unregulated) <\/a><\/span>\n<ul>\n<li><span class=\"cellFormName\"><a href=\"#pust_application_projsum\">Project Summary Sheet Spreadsheet<\/a><\/span><\/li>\n<\/ul>\n<\/li>\n<li><span class=\"cellFormName\"><a href=\"#par_online\">Preliminary Assessment Report Service &#8211; Online<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#pa_si\">Preliminary Assessment\/Site Investigation form<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#pa_si_online\">Preliminary Assessment\/Site Investigation Service &#8211; Online<\/a><\/span><\/li>\n<\/ul>\n<\/td>\n<td class=\"border-right\">\n<ul class=\"listToCforms\">\n<li><span class=\"cellFormName\"><a href=\"#pp_acoc\">Pre-Purchase Administrative Consent Order Certification<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#pub_notification_online\">Public Notification and Outreach Service<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#public_notification\">Public Notification and Outreach form<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#receptor_eval\">Receptor Evaluation form<\/a><\/span>\n<ul>\n<li><span class=\"cellFormName\"><a href=\"#receptor_eval_well_search\">Well<br \/>\nSearch Spreadsheet<\/a><\/span><\/li>\n<\/ul>\n<\/li>\n<li><a href=\"#rap_admin_changes\">RAP Administrative Changes Application<\/a><\/li>\n<li><span class=\"cellFormName\"><a href=\"#gw_ra_permit\">Remedial Action Permit Application Form for Ground Water<\/a> (Archived)<\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#soil_rem_permit_app\">Remedial Action Permit Application Form for Soils<\/a> (Archived)<\/span><\/li>\n<li><a href=\"#rap_combine\">RAP Application to Administratively Combine RAPs<\/a><\/li>\n<li><span class=\"cellFormName\"><a href=\"#rap_contact\">Remedial Action Permit Contact Information Change<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#rem_action_transfer\">Remedial Action Permit Transfer\/Change of Property Ownership Application<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#rap_initial_gw\">Remedial Action Permit Initial Application &#8211; Ground Water<\/a><\/span>\n<ul>\n<li><span class=\"cellFormName\"><a href=\"#lsrp_supp_cert_gw_rap\">LSRP Supplemental Certification For Initial Ground Water Remedial Action Permit (RAP) Application<\/a><\/span><\/li>\n<\/ul>\n<\/li>\n<li><span class=\"cellFormName\"><a href=\"#rap_initial_soil\">Remedial Action Permit Initial Application &#8211; Soil<\/a><\/span>\n<ul>\n<li><span class=\"cellFormName\"><a href=\"#lsrp_supp_cert_soil_rap\">LSRP Supplemental Certification For Initial Soil Remedial Action Permit (RAP) Application<\/a><\/span><\/li>\n<\/ul>\n<\/li>\n<li><a href=\"#rap_initial_media\">RAP Initial \/ New Media Component Application \u2013 Soil, Ground Water, and Indoor Air<\/a><\/li>\n<li><span class=\"cellFormName\"><a href=\"#rap_modification_gw\">Remedial Action Permit Modification Application &#8211; Ground Water<\/a><\/span><\/li>\n<li><a href=\"#rap_modification\">RAP Technical Modification Application \u2013 Soil, Ground Water, and Indoor Air<\/a><\/li>\n<li><span class=\"cellFormName\"><a href=\"#rap_termination_gw\">Remedial Action Permit Termination Application &#8211; Ground Water<\/a><\/span><\/li>\n<li><a href=\"#rap_termination\">RAP Termination\/Removal of a Media Component Application \u2013 Soil, Ground Water, and Indoor Air<\/a><\/li>\n<li><span class=\"cellFormName\"><a href=\"#rap_modification_soil\">Remedial Action Permit Modification Application &#8211; Soil<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#rap_termination_soil\">Remedial Action Permit Termination Application &#8211; Soil<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#ra_prot_bicert\">Remedial Action Protectiveness \/ Biennial Certification Form<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#ra_protcert_soils\">Remedial Action Protectiveness Certification Form &#8211; Soils<\/a><\/span> <span class=\"text-12\">(Discontinued)<\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#ra_protcert_gw\">Remedial Action Protectiveness Certification Form &#8211; Ground Water<\/a><\/span> <span class=\"text-12\">(Discontinued)<\/span><\/li>\n<\/ul>\n<\/td>\n<td valign=\"top\">\n<ul class=\"listToCforms\">\n<li><span class=\"cellFormName\"><a href=\"#rar\">Remedial Action Report form<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#rar_online\">Remedial Action Report Service &#8211; Online<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#raw\">Remedial Action Workplan form<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#raw_online\">Remedial Action Workplan Service &#8211; Online<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#rir\">Remedial Investigation Report form<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#rir_online\">Remedial Investigation Report Service &#8211; Online<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#timeframe_notification\">Remedial TimeFrame Notification<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#remcost_review\">Remediation Cost Review form<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#rfs\">Remediation Funding Source and RFS-FA form<\/a><\/span>\n<ul>\n<li><span class=\"cellFormName\"><a href=\"#rfs_self_guarantee\">Self Guarantee Application<\/a><\/span><\/li>\n<\/ul>\n<\/li>\n<li><span class=\"cellFormName\"><a href=\"#rem_timeframe_ext\">Remediation Timeframe Extension Request<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#rao\">Response Action Outcome form<\/a><\/span>\n<ul>\n<li><span class=\"cellFormName\"><a href=\"#model_action_response\">Model Response Action Outcome (Appendix D)<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#response_notice\">Response Action Outcome Notices<\/a><\/span><\/li>\n<\/ul>\n<\/li>\n<li><span class=\"cellFormName\"><a href=\"#rao_online\">Response Action Outcome Service &#8211; Online<\/a><\/span>\n<ul>\n<li><a href=\"#authorize_online\">Authorization To Submit a Report \/ Form through NJDEP Online<\/a><\/li>\n<\/ul>\n<\/li>\n<li><a href=\"#sc_info_update\">Site and Contact Information Update Form<\/a><\/li>\n<li><a href=\"#sir_online\">Site Investigation Report Service &#8211; Online<\/a><\/li>\n<li><span class=\"cellFormName\"><a href=\"#tag\">Technical Assistance Grant form<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#termination_notice\">Termination of Deed Notice Form<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#ust_noi_online\">Underground Storage Tank Notice of Intent to Close<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#unoc_bldg_cert\">Unoccupied Building to be Demolished Certification Form<\/a><\/span><\/li>\n<li><span class=\"cellFormName\"><a href=\"#vc_response_action\">Vapor Concern (VC) Response Action Form<\/a><\/span><\/li>\n<li><a href=\"#iec_mm_checklist\">Vapor Intrusion Mitigation Monitoring and Maintenance Checklist<\/a><\/li>\n<li><span class=\"cellFormName\"><a href=\"#variance_identification\">Variance Identification Form<\/a><\/span><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>[\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text css=&#8221;&#8221;]<\/p>\n<table class=\"table text-14 align-top\">\n<tbody>\n<tr class=\"bg-success text-white\">\n<th class=\"text-bold\">Form (linked back to the Forms page)<\/th>\n<th class=\"text-bold\">Version &amp; Date<\/th>\n<th class=\"text-bold\">Changes Since the Previous Version<\/th>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"2\" valign=\"top\"><a id=\"7_5_cost_rem_summary\" name=\"7_5_cost_rem_summary\"><\/a><a href=\"..\/#7_5_cost_rem_summary\">7.5 Percent Cost of Remediation Summary and Certification<\/a><\/td>\n<td valign=\"top\">1.1 \u2013 9\/17\/2018<\/td>\n<td class=\"override cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.0 \u2013 5\/7\/2012<\/td>\n<td class=\"override cellChangesInfo\" valign=\"top\">\n<ul>\n<li style=\"color: green\">New Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"5\" valign=\"top\"><a id=\"alt_rem_app_form\" name=\"alt_rem_app_form\"><\/a><a href=\"..\/#alt_rem_app_form\"><br \/>\nAlternative Remedy Application Form<\/a><\/td>\n<td valign=\"top\">1.5 \u2013 9\/17\/2018<\/td>\n<td class=\"override cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.4 \u2013 8\/8\/2013<\/td>\n<td class=\"override cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Name of Form revised.<\/li>\n<li>Re-worded\/added to the Note at top of form.<\/li>\n<li>Section B: The word \u201cRequired\u201d dropped from title, both questions re-written.<\/li>\n<li>Section C: Questions 1, 4, and 5 removed, questions 2 and 3 combined into new question 1, new question 2 added.<\/li>\n<li>Instructions re-written.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.3 \u2013 9\/13\/2012<\/td>\n<td class=\"override cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Bolded note at top of form and added \u201cby the person responsible<br \/>\nfor conducting the remediation\u201d<\/li>\n<li>Section B: Added note to stop if you answer \u201cno\u201d to question<br \/>\n1. Do not submit form.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.2 \u2013 5\/31\/2012<\/td>\n<td class=\"override cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added \u201cand Remedial Action Workplan Approval\u201d to name of form<\/li>\n<li>Added new Section B \u201cRemedial Action Workplan Required\u201d<\/li>\n<li>Renamed Section C from \u201cGeneral\u201d to \u201cAlternative Remedy\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.1 \u2013 5\/7\/2012<\/td>\n<td class=\"override cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated instructions<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"8\" valign=\"top\"><a id=\"alt_rem_standard\" name=\"alt_rem_standard\"><\/a><a href=\"..\/#alt_rem_standard\">Alternative or New Remediation Standard and\/or Screening Level Application<\/a><\/p>\n<p class=\"name_change\">(Was \u201cAlternative Soil Remediation Standard and\/or Screening Level Application form\u201d)<\/p>\n<\/td>\n<td valign=\"top\">2.4 \u2013 5\/3\/2021<\/td>\n<td class=\"override cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Changed title of form \u201cAlternative or Interim Remediation Standard and\/or Screening Level Application Form\u201d<\/li>\n<li>Expanded Note at top of form<\/li>\n<li>Section C:<br \/>\n\u2013 Pre-Approval Required: expanded choices from 5 to 17.<br \/>\n\u2013 No Pre-Approval Required: expanded choices from 4 to 17<\/li>\n<li>Updated instructions for section C<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.3 \u2013 9\/17\/2018<\/td>\n<td class=\"override cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.2 \u2013 8\/27\/2013<\/td>\n<td class=\"override cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Form entirely redesigned<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.1 \u2013 5\/7\/2012<\/td>\n<td class=\"override cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed Non-LSRP and Subsurface Evaluator certification pages<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.0 \u2013 1\/10\/2012<\/td>\n<td class=\"override cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Form entirely redesigned.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.4 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.3 \u2013 3\/4\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.2 \u2013 1\/12\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section C: Developer Certification removed.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormNameIndented\" rowspan=\"2\" valign=\"top\"><a id=\"r_s_notification\" name=\"r_s_notification\"><\/a><a href=\"..\/#r_s_notification\">Remediation Standard Notification Spreadsheet<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 5\/3\/2021<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated logo image<\/li>\n<li>Added \u201cFor Interim\u2026\u201d under title<\/li>\n<li>Updated instructions in the \u201cInstructions\u201d button.<\/li>\n<li>Column E:<br \/>\n\u2013 changed from \u201cARS \/ Screening Level\u201d to \u201cExposure Pathway and Option\u201d<br \/>\n\u2013 changed options in dropdown list.<\/li>\n<li>Column F: removed \u201cNS\u201d from dropdown list<\/li>\n<li>Column G:<br \/>\n\u2013 Changed Name from \u201cType of Standard\u201d to \u201cType of Remediation Standard\/ Screening Level\/ Ecological Goal\/Ecological Criterion\u201d<br \/>\nchanged options in dropdown list.<\/li>\n<li>Column H: Added \u201cEcological Criteria\u201d to name of column<\/li>\n<li>Column I: Added \u201cEcological Goal\/Ecological Criterion\u201d to name of column<\/li>\n<li>Adjusted width of columns to accommodate answers from dropdown lists.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 8\/27\/2013<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New Spreadsheet<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"3\" valign=\"top\"><a id=\"annual_remfee\" name=\"annual_remfee\"><\/a><a href=\"..\/#annual_remfee\">Annual Remediation Fee Reporting form<\/a><\/td>\n<td valign=\"top\">1.6 \u2013 6\/4\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed version 1.6 \u201cAnnual Remediation Reporting Fee\u201d form on 2\/6\/2013<\/li>\n<li>Added new Section E \u201cProrated Fees\u201d and updated instructions<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" nowrap=\"nowrap\">1.5 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" nowrap=\"nowrap\">1.4 \u2013 1\/12\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New version number for splitting the instructions from the form.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormNameIndented\" rowspan=\"5\" valign=\"top\"><a id=\"annual_remfee_online\" name=\"annual_remfee_online\"><\/a><a href=\"..\/#annual_remfee_online\">Annual Remediation Fee Reporting form (Online)<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.4 \u2013 6\/15\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed fee amounts and added link to Fee Guidance Document<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 9\/8\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fee amounts.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 5\/8\/2013<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed reference to temporary LSRPs<\/li>\n<li>Removed paragraph 6.H. Proration of Payment<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 12\/11\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added option for permanent LSRP to paragraph 1 of MyWorkspace Setup.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 5\/29\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New Document<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"6\" valign=\"top\"><a id=\"cid\" name=\"cid\"><\/a><a href=\"..\/#cid\">Case Inventory Document Worksheet<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.6 \u2013 1\/26\/2023<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated Program name and logo in header<\/li>\n<li>H Incident Communication Center #s Managed in Case: changed number of incidents #s that can be listed per AOC from 5 to 10<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.5.1 \u2013 2\/4\/2021<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Only version 1.5.1 may be used, email existing filled out CID versions 1.3,1.4 and 1.5 to <a href=\"mailto:srpcidconversion@deptest.nj.gov\">srpcidconversion@deptest.nj.gov<\/a> to get the<br \/>\nold CID converted to new and emailed back.<\/li>\n<li>Fixed internal Status Code<\/li>\n<li>In Applicable Remediation Standard, updated \u2018Soil Cleanup Criteria (RAW approved for AOC prior to 12\/2\/2008)\u2019 to \u2018Soil Cleanup Criteria (see instructions for appropriate<br \/>\nuse)\u2019<\/li>\n<li>Updated RA type values to fit size length constraints:<\/li>\n<li>\u2018Three- and six- phase electrical resistance heating\u2019 to \u2018Three and six-phase electrical resistance heating\u2019<\/li>\n<li>\u2018Physical or hydraulic containment (barrier wall, French drain, slurry wall, wells, trenches)\u2019 to \u2018Physical or hydraulic containment\u2019<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.5 \u2013 1\/25\/2021<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li><a href=\"https:\/\/deptest.nj.gov\/srp\/wp-content\/uploads\/sites\/39\/changelog_cid_1_5.pdf\" target=\"_blank\" rel=\"noopener\">Change Log<\/a> <span class=\"text-12\">[pdf]<\/span><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.4 \u2013 2\/23\/2017<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Changed Column heading: AOC Details to AOC Description.<\/li>\n<li>Added conditional formatting to the columns listed below that turns the text red if the character limit is exceeded:<br \/>\n\u2013 AOC ID (50-character limit)<br \/>\n\u2013 AOC Description (500-character limit)<br \/>\n\u2013 Activity (4,000-character limit)<\/li>\n<li>Restricted \u2018DEP AOC Number\u2019 to positive whole numbers.<\/li>\n<li>Added \u2018Other areas of concern \u2013 Non contact cooling water discharge\u2019 to AOC Type list.<\/li>\n<li>Removed \u201cState Regulated UST\u201d from dropdown list and changed \u201cFederal Regulated\u2026\u201d to \u201cState and Federal Regulated\u2026\u201d<\/li>\n<li>Added to the \u201cImportant\u201d instruction at top of page:<br \/>\n\u201c2) If pasting from a Word document, use the Paste option: Match Destination Formatting\u201d<br \/>\n\u201c3) If the text turns red you have exceeded the character limit for that column\u201d<\/li>\n<li>Changed examples in Sample AOC Tracking sheet<\/li>\n<li>Colored the spreadsheet tabs at bottom of screen to make them more visible.<\/li>\n<li>Froze first three columns<\/li>\n<li>Added list of CID Validations on Tab 4<\/li>\n<li>Locked worksheet structure so worksheets cannot be added, removed, etc.<\/li>\n<\/ul>\n<p>Instruction changes<\/p>\n<ul>\n<li>Added to instructions for AOC ID \u201cEach row must have a unique AOC ID. Duplicate or blank entries will not work.\u201d<\/li>\n<li>Updated instructions for AOC Type, AOC Description, DEP AOC Number, and Activity.<\/li>\n<\/ul>\n<p>*Note: Cannot allow formatting text within cell (bold, italics, etc.) as it interferes with the system\u2019s ability to automatically read the data.<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.3 \u2013 6\/25\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Made drop down lists compatible with Excel 2007<\/li>\n<li>Allow users to change the height and width of rows and columns.<\/li>\n<li>Note: Could not allow formatting text within cell (bold, italics, etc.) as it interferes with the system\u2019s ability to automatically read the data.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.0 \u2013 11\/4\/2009<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormNameIndented\" rowspan=\"2\" valign=\"top\"><a id=\"cid_ins\" name=\"cid_ins\"><\/a><a href=\"..\/#cid_ins\">Case Inventory Document Instructions<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.6 \u2013 1\/26\/2023<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated Program name and logo in header<\/li>\n<li>H Incident Communication Center #s Managed in Case: changed number of incidents #s that can be listed per AOC from 5 to 10<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.5 \u2013 1\/25\/2021<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Instructions removed from the CID Worksheet and combined with the CID FAQs<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"9\" valign=\"top\"><a id=\"cea_wra\" name=\"cea_wra\"><\/a><a href=\"..\/#cea_wra\">CEA\/Well Restriction Area (WRA) Fact Sheet form<\/a><\/td>\n<td valign=\"top\">1.9 \u2013 9\/18\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">Form<\/p>\n<ul>\n<li>Section A: Question 1 added a checkbox for CEA for Historically Applied Pesticides<\/li>\n<\/ul>\n<p>Instructions<\/p>\n<ul>\n<li>Added \u201cHistorically applied pesticides\u201d as appropriate throughout instructions.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.8 \u2013 3\/22\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">Form<\/p>\n<ul>\n<li>Section A: spelled out RIR<\/li>\n<li>Section B:<br \/>\n\u2013 Added \u201cName of Document \u2026\u201d and \u201cDate of Document\u201d;<br \/>\n\u2013 B.1. Ground Water Classification: new B.1. added<br \/>\n\u2013 B.2. Contaminant Data: changed heading from \u201cContaminants\u201d to \u2018Contaminant Data\u201d; reworded first paragraph; added \u201c-1.7 and 1.9(c)\u201d to end of Note (2);<br \/>\n\u2013 B.3. CEA Boundaries and VI Pathway: changed heading from \u201cCEA Boundaries\u201d to \u201cCEA Boundaries and VI Pathway\u201d; added two questions: \u201cAre there VOs in CEA\u201d and<br \/>\n\u201cIs there LNAPL in CEA\u201d; added 2 columns to table: \u201cCheck if VI pathway was evaluated\u201d and \u201cCheck if VI pathway status is indeterminate\u201d; rearranged order of<br \/>\nremaining questions in 3.<br \/>\n\u2013 B.4. Added \u201cfor the CEA duration\u201d to end of 4.<br \/>\n\u2013 B.5. removed first question under Exhibit C: \u201cFor revisions, does the attached map differ\u2026\u201d; added a N\/A check box for \u201cIdentify format of CEA Boundary<br \/>\nExtent Map\u201d; added \u201cIf there is a CEA map already on NJ-GeoWeb, does it need to be revised\u201d<\/li>\n<li>Section C: Added \u201cIf \u201cYes\u201d list\/attach list of the type and status of any pumping well(s) within CEA \u201c<\/li>\n<li>Section E:<br \/>\n\u2013 1. Added \u201cDate Mailed\u201d to all entities<br \/>\n\u2013 2. Added a \u201cCheck Here\u201d box to instructions; removed \u201c\u2026and indicating if vapor intrusion was evaluated for properties over the CEA.\u201d at end of<br \/>\ninstructions; removed \u201cDate Notification Sent\u201d column from table and added new Block and Lot columns, changed instructions for address column<\/li>\n<li>Appendix:<br \/>\n\u2013 1. Contaminant Data: changed heading from \u201cContaminants\u201d to \u2018Contaminant Data\u201d; reworded first paragraph; added \u201c-1.7 and 1.9(c)\u201d to end of Note (2)<br \/>\n\u2013 2. changed to match B.3. CEA Boundaries and VI Pathway in Section B.<\/li>\n<\/ul>\n<p>Instructions<\/p>\n<ul>\n<li>Extensive rewrite of instructions<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.7 \u2013 7\/16\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>General Instructions:<br \/>\n\u2013 Removed first set of bullets (not content) from \u201cNew or Existing CEA\u201d and added subheading of Reestablishing an Existing CEA under \u201cNew or Existing CEA\u201d<br \/>\n\u2013 Added \u201c(aka CEA form)\u201d (last paragraph first page) and corrected the name of the CEA\/WRA Fact Sheet<br \/>\n\u2013 Changed \u201celectronic portal\u201d to \u201cNJDEP Online Services\u201d<\/li>\n<li>Section B:<br \/>\n\u2013 Page 6 \u2013 Replaced incorrect language and broken link due to EPA reorganization &amp; website changes<\/li>\n<li>Section E:<br \/>\n\u2013 Added instruction to include Cover\/Certification Form when completing public notification requirements.<br \/>\n\u2013 Reworded second paragraph<br \/>\n\u2013 Added \u201cSRP bureaus in the Division of Remediation Management may require submittal of the proposed CEA prior to doing the public notifications\u201d to end of paragraph 3.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.6 \u2013 4\/1\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section A:<br \/>\n\u2013 Question 1 added \u201cReestablish CEA\u201d and \u201cCEA for historic fill\u201d<br \/>\n\u2013 Question 3 changed question from \u201chas RAP been submitted?\u201d to \u201cIs RAP being submitted with this form\u201d<\/li>\n<li>Section B:<br \/>\n\u2013 Question 1 reworded<br \/>\n\u2013 Question 3 added \u201c(Review instructions before selecting \u201cIndeterminate\u201d)\u201d<br \/>\n\u2013 Question 4<br \/>\n\u2013 Removed Exhibit A \u2013 RIR<br \/>\n\u2013 Exhibit C changed \u201cSite map\u201d to \u201cCEA map\u201d<br \/>\n\u2013 Exhibit D (GIS) removed references to CEA spreadsheet<br \/>\n\u2013 Removed Exhibit E \u2013 Fate and Transport Description<\/li>\n<li>Section C: Added question 3 \u201cAre pumping wells within the footprint of the CEA?\u201d<\/li>\n<li>Section E: Question 2 explanation expanded<\/li>\n<li>Certifications moved to Cover\/Certification Form<\/li>\n<li>Instructions extensively updated<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.5 \u2013 8\/19\/2013<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section C: Fixed error of a missing field for question 1<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.4 \u2013 6\/20\/2013<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>General: Removed \u201cPermit\u201d from name of form, added checkboxes for LSRP and Subsurface evaluator at top of form, moved \u201cExhibits\u201d throughout form to the end of section B.<\/li>\n<li>Section A: Expanded to 3 questions<\/li>\n<li>Section B: Question 2 \u2013 changed instructions on form for direction of gw flow, added box for vertical depth in msl, added check boxes for units for horizontal extent of CEA; Question 3 \u2013 Added \u201cexpected expiration duration\u201d and checkbox for indeterminate. New Question 4 \u2013 all exhibits.<\/li>\n<li>Section C: \u201cProjected\u201d removed from section name, Future use question removed, two new questions added.<\/li>\n<li>Section D: Question replaced.<\/li>\n<li>Section F: Certification page for Person Responsible for conducting Remediation added.<\/li>\n<li>Section H: Certification page for Subsurface Evaluator added.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.3 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed Non-LSRP and Subsurface Evaluator certification pages.<\/li>\n<li>Form Name: Deleted \u201cPermit\u201d &amp; added \u201cForm\u201d to the title.<\/li>\n<li>General Instructions: Added references\/links. Clarified general<br \/>\nsubmittal procedures.<\/li>\n<li>Section A: Changed to use Program Interest ID. Added five<br \/>\ncheck boxes &amp; updated instructions accordingly.<\/li>\n<li>Section B: Now starts at CEA Component Information. All later<br \/>\nSection IDs changed. Added to instructions.<\/li>\n<li>Section B.1. (Contaminant(s)): Note (4) was updated.<\/li>\n<li>Section B. 2. (CEA Boundaries): Added check box to indicate<br \/>\nif Block &amp; Lot changed.<\/li>\n<li>Exhibit C: Clarified form &amp; instructions, added \u201cNotes for<br \/>\nGIS maps:\u201d (Geologic Formation\/Unit): Changed form &amp; added information<br \/>\nsources to instructions. Now allows for multiple ground water<br \/>\nflow directions &amp; multiple water bearing zones. (Ground Water<br \/>\nClassification): Added information regarding Class III areas.<\/li>\n<li>Exhibit D: This is now the CEA spreadsheet. Send to new GIS<br \/>\nemail &amp; put it on the CD.<\/li>\n<li>Section C. Exhibit F( Well Search Results): Added guidance<br \/>\nto instructions.<\/li>\n<li>Section E: An exemption was added for form submittal, \u201cExhibit<br \/>\nG\u201d was deleted; VI information was added.<\/li>\n<li>Addendum: Modified to match changes to Section B.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.2 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 1\/12\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Instructions included, Citation edits, Mailing address for<br \/>\ncompleted form changed,<\/li>\n<li>Section A: #1 \u2013 reference to CEA changed to Exhibit A,<\/li>\n<li>Section C: Direction of GW flow requested, Exhibit E checkbox<br \/>\nfor Historic Fill and one for all other information,<\/li>\n<li>Section D: Exhibit G table for requested information,<\/li>\n<li>Section E: SE signature page changed<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"3\" valign=\"top\"><a id=\"child_care_center_ef\" name=\"child_care_center_ef\"><\/a><a href=\"..\/#child_care_center_ef\">Child Care Center\/Educational Facility Remediation Form<\/a><\/td>\n<td valign=\"top\">1.2 \u2013 5\/26\/2020<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Changed instructions to indicate that child care remediations must pay annual remediation fees.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.1 \u2013 9\/17\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.0 \u2013 1\/27\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li style=\"color: green\">New form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"2\" valign=\"top\"><a id=\"child_care_pa\" name=\"child_care_pa\"><\/a><a href=\"..\/#child_care_pa\">Child Care PA, Clean PASI, or Clean SI Standalone Report Submissions<\/a><\/td>\n<td valign=\"top\">1.1 \u2013 8\/17\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Applicability: Added \u201cor the Facility is a Madden subject educational facility\u201d to the end of the last sentence.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 1\/18\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"3\" valign=\"top\"><a id=\"confidentiality\" name=\"confidentiality\"><\/a><a href=\"..\/#confidentiality\">Confidentiality Request Form<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 4\/1\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B: Added question \u201cIs the Person Responsible for Conducting the Remediation subject to an annual remediation fee\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B: Changed individual ISRA and UST fees options to<br \/>\na single fee.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 9\/7\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li style=\"color: green\">New Document<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"5\" valign=\"top\"><a id=\"confirmed_discharge\" name=\"confirmed_discharge\"><\/a><a href=\"..\/#confirmed_discharge\">Confirmed Discharge Notification form<\/a><\/td>\n<td valign=\"top\">1.7 \u2013 5\/23\/2013<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section E: Added box for Historic Fill only; Changed \u201cDate Discharge<br \/>\nNotification to the Department\u201d to \u201cDate NJDEP Hotline called\u201d<\/li>\n<li>Section G: (Case type) arranged choices alphabetically; expanded<br \/>\nchoices for Federal case types; added \u201cHistoric Pesticides\u201d, \u201cDue Diligence with RAO\u201d,<br \/>\nand \u201cother\u201d; removed \u201cSite is located within an economic development priority area\u201d<br \/>\nand \u201cNot applicable\u201d; changed \u201cGovernment Entity\u201d to \u201cSpill Act Defense \u2013 Government<br \/>\nEntity\u201d<\/li>\n<li>Instructions: Updated instructions to provide more information about combining<br \/>\ncases and how to complete the form if historic fill is the only contaminated AOC<br \/>\nat the site.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.6 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B: Changed from \u201cPerson Responsible For Conducting<br \/>\nthe Remediation\u201d to \u201cDischarge Being Reported With This Submission\u201d.<\/li>\n<li>Section D: removed \u201cSubstance Released\u201d table.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.5 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.4 \u2013 3\/4\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 1\/12\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section D: Clarification for Substance Release table,<\/li>\n<li>Section G: Developer Certification removed.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"7\" valign=\"top\"><a id=\"cdn_online\" name=\"cdn_online\"><\/a><a href=\"..\/#cdn_online\">Confirmed Discharge Notification Service \u2013 Online<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.6 \u2013 10\/15\/2024<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Outdated links, where a new link is applicable, have been updated.<\/li>\n<li>Instructions regarding the title of webpages has been updated<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.5 \u2013 10\/12\/2023<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Header: Updated logo and Program name<\/li>\n<li>Updated instructions for Historic Fill Only Sites.<\/li>\n<li>Updated link for Dataminer in two locations<\/li>\n<li>Section III: Added new question about filing a claim against an Underground Storage Tank Financial Responsibility Insurance Policy<\/li>\n<li>Changed comments email from PortalComments@deptest.nj.gov to njdeponlinesupport@deptest.nj.gov<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.4 \u2013 10\/1\/2019<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Under Confirmed Discharge Notification Details:<br \/>\n\u2013 Removed: Provide the start date in the grid located beneath Case Type(s) information.<br \/>\n\u2013 Added: Existing Case Types already associated with your selected case are displayed in a grid.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 6\/4\/2019<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Moved \u201cIncident Selection \/ Incident Details\u201d to the beginning of Confirmed Discharge Notification (CDN) Service section, and added Incident Search Dataminer link<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 12\/4\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added \u201cHistoric Fill Only Sites\u201d paragraph under Applicability<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 10\/30\/2017<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Changed all instances of \u201cNotice\u201d to \u201cNotification\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.0 \u2013 10\/11\/2017<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"2\" valign=\"top\"><a id=\"cover_cert\" name=\"cover_cert\"><\/a><a href=\"..\/#cover_cert\">Cover\/Certification Form<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 9\/17\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 4\/1\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" valign=\"top\"><a id=\"devcert\" name=\"devcert\"><\/a><a href=\"..\/#devcert\">Developer Certification (Appendix A for the ARRCS Rule)<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\"><\/td>\n<td class=\"cellChangesInfo\" valign=\"top\"><\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"3\" valign=\"top\"><a id=\"discharge_gw_pbr\" name=\"discharge_gw_pbr\"><\/a><a href=\"..\/#discharge_gw_pbr\">Discharge to Ground Water Permit by Rule Authorization Request<\/a><\/td>\n<td valign=\"top\">1.2 \u2013 9\/17\/2018<\/td>\n<td class=\"override cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 11\/16\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section A: reduced the number of Block and lot spaces available<\/li>\n<li>Section B:<br \/>\n\u2013 Old Section B removed, information now with certification;<br \/>\n\u2013 New section B (old section C) Name changed from \u201cPermit Type and Fees\u201d to \u201cFee and Discharge information\u201d;<br \/>\n\u2013 Added a check box for dewatering only;<br \/>\n\u2013 Added third discharge type \u201cDischarges other than those above\u201d.<\/li>\n<li>Section C: Changed \u201ca copy of previously published Public Notice\u201d to \u201ca copy of the public notice written as you intend it to be published\u201d<\/li>\n<li>Section D: Added ground water classification question<\/li>\n<li>Section E:<br \/>\n\u2013 Question 1 \u2013 added \u201con the site or\u201d to question. Removed \u201cpotable wells\u201d and \u201cTier 1 Well-head protection areas\u201d and added \u201cother occupied buildings\u201d;<br \/>\n\u2013 Added new question 2;<br \/>\n\u2013 Under \u201cUHOT Cases\u201d removed \u201cof the down gradient extent\u201d from question 2;<\/li>\n<li>Old Section G: Section \u201cOther Remediation Permits\u201d removed<\/li>\n<li>Section F: PRCR Certification standardized to include info from old section B<\/li>\n<li>Instructions significantly updated<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 9\/17\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li style=\"color: green\">New Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"2\" valign=\"top\"><a id=\"exemption_spill_act\" name=\"exemption_spill_act\"><\/a> <a href=\"..\/#exemption_spill_act\">Exemption from Spill Act Liability Certification<\/a><\/td>\n<td valign=\"top\">1.1 \u2013 4\/2\/2013<\/td>\n<td class=\"override cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Changed \u201cmunicipality\u201d to \u201cgovernmental entity\u201d throughout form.<\/li>\n<li>Sec B: New Section B added \u201cProperty Owner\u201d<\/li>\n<li>Sec C: Added 2 questions asking if work has been or will be conducted.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 10\/4\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li style=\"color: green\">New Form posted date<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"8\" valign=\"top\"><a id=\"labdata\" name=\"labdata\"><\/a><a href=\"..\/#labdata\">Full Laboratory Data Deliverables form<\/a><\/td>\n<td valign=\"top\">1.8 \u2013 8\/26\/2021<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section C: Added Remedial Action Permit to the choices.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.7 \u2013 2\/4\/2019<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section D: Changed \u201cIndoor Air\u201d to \u201cVI (i.e., indoor air, soil gas, and ambient air samples)\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.6 \u2013 9\/17\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.5 \u2013 9\/13\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated Tech Reg citations in the instructions under Applicability.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.4 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed Non-LSRP certification page.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.3 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 3\/4\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 1\/12\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section D: Sampling Dates added;<\/li>\n<li>Section G: Developer Certification removed.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"2\" valign=\"top\"><a id=\"gin_online\" name=\"gin_online\"><\/a><a href=\"..\/#gin_online\">General Information Notice Service \u2013 Online<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 12\/4\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added second paragraph under applicability in GIN about confidential submissions.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 10\/11\/2017<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"3\" valign=\"top\"><a id=\"gw_rem_act_permit_plan\" name=\"gw_rem_act_permit_plan\"><\/a><a href=\"..\/#gw_rem_act_permit_plan\">Ground Water Monitoring Plan Spreadsheet for Ground Water Remedial Action Permit<\/a><\/td>\n<td valign=\"top\">1.1 \u2013 12\/4\/2023<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li><a href=\"https:\/\/deptest.nj.gov\/srp\/wp-content\/uploads\/sites\/39\/rem_action_permit_gw_plan_changelog.pdf\" target=\"_blank\" rel=\"noopener\">Change log<\/a> <span class=\"text-12\">[pdf]<\/span><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 5\/22\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">0.0 \u2013 2\/24\/2010<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"6\" valign=\"top\"><a id=\"hdsrf_application\" name=\"hdsrf_application\"><\/a><a href=\"..\/#hdsrf_application\">Hazardous Discharge Site Remediation Fund Application form<\/a><\/td>\n<td valign=\"top\">1.5 \u2013 9\/17\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.4 \u2013 4\/9\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Changed \u201cSite Remediation Program\u201d to \u201cSite Remediation and Waste Management Program\u201d throughout document.<\/li>\n<li>Added spaces for \u201cProgram Interest Name\u201d and \u201cPI #\u201d at top of form.<\/li>\n<li>Section A:<br \/>\n\u2013 Changed \u201cPlease check here if initial application has been submitted\u201d to \u201cPlease check here if this is a supplemental request\u201d.<br \/>\n\u2013 Under Public Entity changed \u201c(LR\/UR)\u201d to \u201cUnrestricted Use\u201d in first 25% checkbox, deleted second 25% checkbox<br \/>\n\u2013 Under Private Entity deleted 50% checkbox and changed \u201c25% Match Innovative Technology\u201d to \u201cUnrestricted Use\u201d<\/li>\n<li>Section F: Deleted old Section F. Existing Case<\/li>\n<li>Section H. Work Proposal: Change \u201cName of Company\u2026\u201d to \u201cName of firm\u2026\u201d<\/li>\n<li>(old) Section K. Demonstration of Need for Loan Applicants: Section Deleted<\/li>\n<li>Section J. Financial Information: Deleted \u201c, Except for Innocent Party Applicants\u201d<\/li>\n<li>Section K. LSRP Cert: Changed the citation<\/li>\n<li>General Certification Parts II and III: changed \u201cadministrator\u201d to \u201cbusiness administrator\u201d, deleted \u201ctownship\u201d from \u201ctownship manager\u201d, added mayor.<\/li>\n<li>Deleted old Part IV: Changed \u201cINNOCENT PARTY GRANT CERTIFICATION\u201d<\/li>\n<li>New Part V: Added more space for answers to questions 5 and 6.<\/li>\n<li>Part VI Application Checklist:<br \/>\n\u2013 Changed \u201crealistic opportunity\u201d to \u201ccommitment\u201d throughout checklist<br \/>\n\u2013 Changed heading under Public Entities from \u201c25% RA Matching Grants Remedial Action (Limited Restricted Use\/ Unrestricted)\u201d to \u201c25% RA Matching Grants<br \/>\n\u2013 Remedial Action Unrestricted Use\u201d, delete \u201cProof of Ownership\u201d checkbox; Added checkbox for \u201c25% Matching Grant RA Certification (Part IV)\u201d<br \/>\n\u2013 Deleted \u201c25% Matching RA Grants Innovative Technology\u201d section under Public Entities<br \/>\n\u2013 Deleted Private Entities \u201cInnocent Party Grants\u201d section<br \/>\n\u2013 Changed heading under Private Entities from \u201c25% RA Matching Grants Remedial Action (Limited Restricted Use\/ Unrestricted)\u201d to \u201c25% RA Matching Grants<br \/>\n\u2013 Remedial Action Unrestricted Use\u201d, delete \u201cProof of Ownership\u201d checkbox<br \/>\n\u2013 Deleted \u201c25% Matching Grants Innovative Technology\u201d section under Private Entities<br \/>\n\u2013 Deleted Denial of Letter check box under Loans, Private Entities<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 12\/11\/2013<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed check box for \u201cNon-LSRP (Existing Cases)\u201d from top of form.<\/li>\n<li>Section A: Reworded some of the choices.<\/li>\n<li>Section F: Section changed from \u201cNJDEP Oversight Document\u201d to \u201cExisting Case\u201d. Questions changed.<\/li>\n<li>Section G: Section deleted (Consultant Information).<\/li>\n<li>Section H: (Other Funding Sources) added a box for \u201cEntity(s) responsible for conducting the remediation\u201d.<\/li>\n<li>Section I: Changed Name from \u201cScope of Work\u201d to \u201cWork Proposal\u201d.<\/li>\n<li>Section J: (Cost Estimate) Removed \u201cprepared in the format outlined in Part VI\u201d<\/li>\n<li>Section K: (Demonstration of Need For Loan Applicants) Small change in wording.<\/li>\n<li>Section M: Non LSRP Certification deleted, Subsurface Evaluator certification updated.<\/li>\n<li>Part II: (General Certification) Added \u201cfor a public entity, the contact person (administrator, township manager, etc.)\u201d.<\/li>\n<li>Part III: New Part III added \u201cSubrogation of Rights\u201d<\/li>\n<li>Part IV: Old Part IV \u201c25% Matching RA Grant Certification\u201d moved to Part V.<br \/>\nNew Part IV (Innocent Party Grant Certification) modified the certification language.<\/li>\n<li>Part VI: Old Part VI \u201cCost Estimate Format\u201d deleted.<br \/>\nNew Part VI \u201cMunicipal Questionnaire\u201d formerly Part V.<br \/>\nDeleted \u201cnote that projects may not start until after recie3ving NJDEP approval\u201d from question 2.<\/li>\n<li>Part VII: (HDSRF Application Checklist)<br \/>\nAdded \u201cHDSRF Subrogation of Rights (Part III)\u201d, and changed \u201cScope of Work\u201d to \u201cWork Proposal\u201d for many of the sub-categories.<br \/>\nRemoved \u201cCopy of DEP approval letter \u2026\u201d from all sub-categories.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 3\/4\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<li>New version number for splitting the instructions from the<br \/>\nform<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 5\/21\/2010<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">Form<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormNameIndented\" valign=\"top\"><a id=\"hdsrf_cost\" name=\"hdsrf_cost\"><\/a><a href=\"..\/#hdsrf_cost\">HDSRF Application \u2013 Cost Estimate Format Spreadsheet<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 5\/21\/2010<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">Form<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"3\" valign=\"top\"><a id=\"childcare\" name=\"childcare\"><\/a><a href=\"..\/#childcare\">HDSRF Child Care Facility Grant Application<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 10\/24\/2016<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section A: Added following warning to Question 2: A vendor number is required in order to process the grant application.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 1\/28\/2016<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section A: Question 2 changed from requiring user to attach a W-9 to asking for vendor ID #.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 4\/25\/2013<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"3\" valign=\"top\"><a id=\"hap_request\" name=\"hap_request\"><\/a><a href=\"..\/#hap_request\">Historically Applied Pesticides Deferral Request<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 11\/21\/2019<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section A: Added checkbox at bottom that says \u201cCheck here if you are submitting this form to terminate a previously filed HAP Deferral\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 9\/17\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 8\/11\/2016<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li style=\"color: green\">New Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"8\" valign=\"top\"><a id=\"iec_response\" name=\"iec_response\"><\/a><a href=\"..\/#iec_response\">IEC Response Action form<\/a><\/td>\n<td valign=\"top\">1.8 \u2013 1\/6\/2023<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Header: Updated logo and program name<\/li>\n<li>Section C: bolded \u201cmust\u201d<\/li>\n<li>Section D: Removed \u201cand VC\u201d from note<\/li>\n<li>Section E:<br \/>\n\u2013 Added second question to question 5 under 14-Day Notification<br \/>\n\u2013 updated language under question 5 to<br \/>\n\u2013 Added note requiring submission of data and maps<br \/>\n\u2013 Added under 120-Day Reporting \u201cHave all potential contaminant source areas contributing to the IEC been identified?\u201d, If \u201cno\u201d, explain.<br \/>\n\u2013 Added under1-Year Reporting \u201cHas source control been initiated at all sources identified as contributing to the IEC?\u201d, If \u201cno\u201d, explain.<br \/>\n\u2013 Added statement under Annual Monitoring and Maintenance Report requiring the submission of the Vapor Intrusion Mitigation Monitoring and Maintenance checklist<\/li>\n<li>Section G: Updated program name in address<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.7 \u2013 9\/17\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.6 \u2013 3\/26\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section A: Changed Incident Numbers to Case tracking Numbers<\/li>\n<li>Section B: Removed question \u201cDo you have an assigned case manager?\u201d<\/li>\n<li>Section C:<br \/>\n\u2013 Name of section shortened<br \/>\n\u2013 Questions 2 and 3 removed.<br \/>\n\u2013 New question added \u201cAre you claiming the source of the discharge is located off-site\u2026\u201d<\/li>\n<li>Section D: Added space for phone number and email address, and a note.<\/li>\n<li>Section E:<br \/>\n\u2013 Changed \u201cIEC Information Submittal\u201d to \u201c14 Day Reporting \u2013 IEC Information Submission\u201d<br \/>\n\u2013 Removed question 5,6, and 7 under IEC Information Submittal<br \/>\n\u2013 Added new question 5 \u201cIs VI pathway complete?\u201d<br \/>\n\u2013 Removed questions under 120 Day Reporting and 1Year Reporting<br \/>\n\u2013 Added Annual monitoring and Maintenance Report<\/li>\n<li>Section F: removed<\/li>\n<li>Section G: removed<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.5 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed Non-LSRP certification page.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.4 \u2013 1\/19\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section A: Removed \u201cMailing Address if different than street<br \/>\naddress\u201d<\/li>\n<li>Section C: Removed \u201cEssential Utility Disruption\u201d, Added questions<br \/>\n2 and 3<\/li>\n<li>Section E: Renamed first section from \u201cImmediate Notification\u201d<br \/>\nto \u201cInformation Submittal\u201d. Removed 14-day notification check,<br \/>\nadded first 2 questions to \u201cInformation Submittal\u201d Removed \u201cDate<br \/>\nof spreadsheet submittal date\u201d.<br \/>\nReworded questions in \u201c1 \u2013 year IEC source control report\u201d.<\/li>\n<li>Section F: Added a question about fed regulated USTs, changed<br \/>\nall questions from check boxes to yes\/no questions.<\/li>\n<li>Section G: Changed \u201cwithin 100\u2019 of free product (any<br \/>\ntype)\u201d to \u201cwithin 100\u2019 of free product (excluding diesel)\u201d<br \/>\nIncorporated \u201cfree product type\u201d question into other questionsChanged \u201cground water \u2013to-indoor air pathway\u201d to \u201cvapor<br \/>\nintrusion pathway\u201d.<\/li>\n<li>Updated instructions<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.3 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 2\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 1\/12\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Grammar &amp; punctuation,<\/li>\n<li>Section B: Case Manager section added,<\/li>\n<li>Section D: Fee Billing section added,<\/li>\n<li>Section E: Timeframe changes,<\/li>\n<li>Section G: \u201cRapid Action\u201d wording changes,<\/li>\n<li>Section H: Developer Certification removed,<\/li>\n<li>Sec I: Non-LSRP and SE signature pages added<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormNameIndented\" rowspan=\"2\" valign=\"top\"><a id=\"iec_direct_contact\" name=\"iec_direct_contact\"><\/a><a href=\"..\/#iec_direct_contact\">IEC \u2013 Direct Contact Spreadsheet<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 3\/26\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Split Site Name and PI# into separate boxes<\/li>\n<li>Split LSRP Name &amp; License # into separate boxes<\/li>\n<li>Removed State Plane Coordinates and SPC method<\/li>\n<li>Improved directions for adding rows and locations<\/li>\n<li>Removed unused reference lists<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.0 \u2013 8\/30\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormNameIndented\" rowspan=\"3\" valign=\"top\"><a id=\"iec_potable_water\" name=\"iec_potable_water\"><\/a><a href=\"..\/#iec_potable_water\">IEC \u2013 Potable Water Spreadsheet<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 3\/26\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Split Site Name and PI# into separate boxes<\/li>\n<li>Split LSRP Name &amp; License # into separate boxes<\/li>\n<li>Removed State Plane Coordinates and SPC method<\/li>\n<li>Improved directions for adding rows and locations<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.2 \u2013 8\/30\/2010<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.1 \u2013 8\/2\/2010<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormNameIndented\" rowspan=\"3\" valign=\"top\"><a id=\"iec_vi\" name=\"iec_vi\"><\/a><a href=\"..\/#iec_vi\">IEC\/VC \u2013 Vapor Intrusion Spreadsheet<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 3\/26\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Split Site Name and PI# into separate boxes<\/li>\n<li>Split LSRP Name &amp; License # into separate boxes<\/li>\n<li>Removed State Plane Coordinates and SPC method<\/li>\n<li>Improved directions for adding rows and locations<\/li>\n<li>Removed unused reference lists<\/li>\n<li>Added a sample spreadsheet<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.2 \u2013 8\/30\/2010<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.1 \u2013 8\/2\/2010<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormNameIndented\" rowspan=\"3\" valign=\"top\"><a id=\"iec_mm_checklist\" name=\"iec_mm_checklist\"><\/a><a href=\"..\/#iec_mm_checklist\">IEC \u2013 Monitoring and Maintenance Checklist<br \/>Vapor Intrusion Mitigation Monitoring and Maintenance Checklist<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 2\/17\/2026<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.1 \u2013 3\/16\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Changed format to be consistent with Vapor Intrusion Technical Guidance.<\/li>\n<li>Added question for crawl space ventilation systems.<\/li>\n<li>Removed \u201cweather\u201d and \u201coutside temperature\u201d from top of form, added \u201cInspector(s)\u201d.<\/li>\n<li>Moved all written explanations to section 4<\/li>\n<li>Added multiple sub questions to the first 3 questions.<\/li>\n<li>Convert document from word doc to fillable pdf<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.0 \u2013 3\/26\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New Document<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"1\" valign=\"top\"><a id=\"ia_rap\" name=\"ia_rap\"><\/a><a href=\"..\/#ia_rap\">Indoor Air Monitoring Plan Spreadsheet for Indoor Air RAP<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 2\/17\/2026<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"1\" valign=\"top\"><a id=\"iana_factsheet\" name=\"iana_factsheet\"><\/a><a href=\"..\/#iana_factsheet\">Indoor Air Notification Area (IANA) Fact Sheet Form<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 2\/17\/2026<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"8\" valign=\"top\"><a id=\"isra_alt_comp\" name=\"isra_alt_comp\"><\/a><a href=\"..\/#isra_alt_comp\">ISRA Alternate Compliance Option Application<\/a><\/td>\n<td valign=\"top\">2.0 \u2013 11\/10\/2020<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B.<br \/>\n\u2013 Added \u201cThe Current Case\u201d to statement 2<br \/>\n\u2013 Edits to text in statement 4<br \/>\n\u2013 Added new statement 5<br \/>\n\u2013 Edits to text in statement 6 (formerly statement 5).<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.9 \u2013 4\/25\/2019<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B.<br \/>\n\u2013 Question 1: added space for ISRA case number<br \/>\n\u2013 Question 2: edited text to make clear report must be submitted via Online Portal, delete requirement to mail a copy<\/li>\n<li>Section C. Question 1: edited text to make clear report must be submitted via Online Portal, delete requirement to mail a copy<\/li>\n<li>Instructions. Added sentence to Section A 1. clarifying which ISRA number to enter.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.8 \u2013 9\/17\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\"><\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.7 \u2013 7\/2\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">Form<\/p>\n<ul>\n<li>Section B. Item 2., added \u201cArea of Concern\u201d to description: \u201cby the attached no Further Action Letter, or Area of Concern Response Action Outcome.\u201d<\/li>\n<\/ul>\n<p>Instructions<\/p>\n<ul>\n<li>Section B. Expanded instructions for item 2.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.6 \u2013 4\/1\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed \u201cDate\u201d at top of form<\/li>\n<li>Updated definition of \u201cIndustrial Establishment\u201d<\/li>\n<li>Section A.<br \/>\n\u2013 1. Expanded space available for Block and Lots<br \/>\n\u2013 4. Changed title from \u201cPurchaser, Mortgagee or Other Party\u201d to \u201cPurchaser of Business or Property\u201d<\/li>\n<li>Section B. Section has been rewritten<\/li>\n<li>Section C. Section has been rewritten (minor changes)<\/li>\n<li>Section D. Section replaced with standardized PRCR certification<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.5 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed Non-LSRP certification page.<\/li>\n<li>Removed Section B. ISRA Alternate Compliance Fees and Section<br \/>\nC. Expedited Review \/ Limited Site Review<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.4 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<li>A new Section B was added with check boxes and list of fees<br \/>\nfor ISRA Alternate Compliance Fee Types.<\/li>\n<li><em>Section E. Minimal Environmental Concern Waiver<\/em> was<br \/>\ndeleted.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 1\/11\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Grammar &amp; punctuation<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"2\" valign=\"top\"><a id=\"isra_limconv\" name=\"isra_limconv\"><\/a><a href=\"..\/#isra_limconv\">ISRA Certificate of Limited Conveyance Application<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 7\/24\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section A. Remove Date and Sic Code<\/li>\n<li>Section D. Added place for check number<\/li>\n<li>Section E. Removed question \u201chave you enclosed check\u201d at end<br \/>\nof RP certification.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<li>Formatted to be the same format as the LSRP forms. It was<br \/>\npreviously posted on the ISRA Forms Web Page.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"6\" valign=\"top\"><a id=\"de_minimis\" name=\"de_minimis\"><\/a><a href=\"..\/#de_minimis\">ISRA De Minimis Quantity Exemption Affidavit Application form<\/a><\/p>\n<p class=\"name_change\">(Was \u201cDe Minimus Quantity Exemption Application form\u201d)<\/p>\n<\/td>\n<td valign=\"top\">1.6 \u2013 8\/7\/2019<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added paragraph to Note at top of form<\/li>\n<li>Section A: removed Date triggered compliance<\/li>\n<li>Section B: expanded space for previous ISRA submissions from 1 to 4<\/li>\n<li>Section C: Added new questions 2 and 3<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.5 \u2013 4\/1\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Changed name to ISRA De Minimis Quantity Exemption Affidavit<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.4 \u2013 8\/01\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added definitions for \u201cindustrial establishment, owner, and<br \/>\noperator\u201d to instructions<\/li>\n<li>Section E: Removed \u201cAbsence of Contamination Acknowledgement\u201d<br \/>\ncertification<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<li>For the instructions: Under General Instructions, No. 4, the<br \/>\nstatement that states this form should be submitted along with<br \/>\nthe Individual Document Submittal was deleted.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 3\/4\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 1\/12\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Typo fixed on pg. 5 of 5 of form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"7\" valign=\"top\"><a id=\"gin\" name=\"gin\"><\/a><a href=\"..\/#gin\">ISRA General Information Notice<\/a><\/p>\n<p class=\"name_change\">(Was \u201cGeneral Information Notice\u201d form)<\/p>\n<\/td>\n<td valign=\"top\">2.0 \u2013 12\/3\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added \u201cFor Confidential Submissions Only\u201d to title<\/li>\n<li>Added additional note to top of form that non-confidential GINs must be submitted online<\/li>\n<li>Instructions: Added documents to submit under General Instructions. Updated Applicability to indicate the form is for confidential submissions only.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.9 \u2013 4\/1\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Changed name of form from GIN to ISRA GIN<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.8 \u2013 9\/13\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section A: Removed Date<\/li>\n<li>Added federal case question and instructions<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.7 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added instructions to top of form about submitting a revision\/update.<\/li>\n<li>Section D: Renumbered questions.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.6 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<li>Check boxes were added to the title block to specify if this<br \/>\nwas a new GIN or Revised\/Updated GIN. If this was a revision\/update,<br \/>\nthen the ISRA Case Number and Program Interest Number is required<br \/>\nin Section A.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.5 \u2013 3\/4\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.4 \u2013 1\/12\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Grammar &amp; punctuation,<\/li>\n<li>Section J: Developer Certification removed.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"9\" valign=\"top\"><a id=\"remcert\" name=\"remcert\"><\/a><a href=\"..\/#remcert\">ISRA Remediation Certification form<\/a><\/p>\n<p class=\"name_change\">(Was \u201cRemediation Certification form\u201d)<\/p>\n<\/td>\n<td valign=\"top\">2.0 \u2013 11\/21\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Header: Updated logo and Program name<\/li>\n<li>Section H: Removed \u201c(IF COST ESTIMATE BEING PROVIDED)\u201d<\/li>\n<\/ul>\n<p>Instructions:<\/p>\n<ul>\n<li>Section D: removed \u201cWhen the surrogate amount is used, certification by a LSRP is not necessary.\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.9 \u2013 9\/17\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.8 \u2013 4\/1\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Changed named from \u201cRemediation Certification Form\u201d to \u201cISRA Remediation Certification Form\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.7 \u2013 9\/23\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Changed instructions in Section D from \u201cbut excluding the estimated cost\u2026\u201d to \u201cincluding the estimated cost\u2026\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.6 \u2013 11\/27\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed Pubic Notary Requirements from Sections E, F, and<br \/>\nG.<\/li>\n<li>Updated instructions for Applicability.<\/li>\n<li>Added instruction to submit the Remediation Cost Review and<br \/>\nRFS\/FA form in Section D.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.5 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed Non-LSRP certification page.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.4 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 3\/4\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 1\/12\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Grammar &amp; punctuation<\/li>\n<li>Section D: surcharge added<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"2\" valign=\"top\"><a id=\"linear_construction\" name=\"linear_construction\"><\/a><a href=\"..\/#linear_construction\">Linear Construction Project<\/a><\/td>\n<td valign=\"top\">1.1 \u2013 9\/17\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.0 \u2013 8\/30\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Draft Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"6\" valign=\"top\"><a id=\"lnapl\" name=\"lnapl\"><\/a><a href=\"..\/#lnapl\">LNAPL Free Product Reporting Form<\/a><\/td>\n<td valign=\"top\">1.7 \u2013 9\/17\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.6 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed Non-LSRP and Subsurface Evaluator certification pages<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.5 \u2013 1\/31\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>General: Removed the words \u201cproduct\u201d and \u201cfree product\u201d from<br \/>\nform. Removed format restrictions for zip codes<\/li>\n<li>Section A: Changed title from \u201cSite Location\u201d to \u201cSite Name<br \/>\nand Location\u201d. Changed Date triggered compliance with\u201d to \u201cDate<br \/>\nRemediation Initiated Pursuant to N.J.A.C. 26C-2\u201d<\/li>\n<li>Section C: Replaced the word \u201cproduct\u201d with \u201cNAPL\u201d through<br \/>\nout section. Added several questions to item 2.<\/li>\n<li>Section C: Replaced the word \u201cproduct\u201d with \u201cNAPL\u201d through<br \/>\nout section. Added several questions to item 2.<\/li>\n<li>Section D: Replaced the word \u201cDeviation\u201d with \u201cVariance\u201d through<br \/>\nout the section.<\/li>\n<li>Section F: Removed the facility and responsible party sections<br \/>\nfrom subsurface evaluator certification.<\/li>\n<li>Changed submission instructions to \u201cCompleted forms should<br \/>\nbe sent to:\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.4 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 2\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 1\/12\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Grammar &amp; punctuation,<\/li>\n<li>Section E: Developer Certification removed<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"1\" valign=\"top\"><a id=\"lsrp_focused_permit\" name=\"lsrp_focused_permit\"><\/a><a href=\"..\/#lsrp_focused_permit\">LSRP Focused Permit IV Supplemental Certification for RAP Administratively Change Application<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 2\/17\/2026<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"10\" valign=\"top\"><a id=\"lsrp_notification01\" name=\"lsrp_notification01\"><\/a><a href=\"..\/#lsrp_notification01\">LSRP Notification of Retention or Dismissal<\/a><\/p>\n<p class=\"name_change\">(Now a \u201cNJDEP Online Services\u201d only form)<\/p>\n<\/td>\n<td valign=\"top\">1.3 \u2013 11\/22\/2021<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>5. Submission Type Selection; c) Retention \u2013 Child Care Licensing:<\/li>\n<li>Added \u201cDo not use the Childcare Retention service to retain to a Madden Subject Educational Facility. Use \u2018Retention\u2019 instead.\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.2 \u2013 02\/14\/2019<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added \u201cRetention \u2013 Publicly Funded\u201d and \u201cRelease \u2013 Publicly Funded\u201d to the list of available services<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.1 \u2013 5\/8\/2013<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li style=\"color: green\">Form only available online<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">3.0 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed version 3.0 \u201cLSRP Notification of Retention or Dismissal\u201d form on 2\/6\/2013<\/li>\n<li>Removed Section F. \u201cOPT IN\u201d Request.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.9 \u2013 2\/16\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section E. Item 7. Added \u201cregulated tank closure\u201d as a reason<br \/>\nto hire an LSRP<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.8 \u2013 1\/10\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section E. Deleted question 5, added to question 8 (now 7)<br \/>\nasking the total number of AOCs for the site.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.7 \u2013 11\/23\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B. Deleted \u201cI have been hired to address an area of concern or a full site\u201d<\/li>\n<li>Section D. Changed citations for N.J.S.A. 58:10C<\/li>\n<li>Deleted question asking to \u201cindicate relationship to the site\u201d<br \/>\nInserted 7 new questions<\/li>\n<li>Deleted \u201ccurrent oversight mechanism\u201d question<br \/>\nDeleted \u201cDoes the site involve or potentially impact a childcare<br \/>\ncenter,<br \/>\nschool, or residence\u201d question<\/li>\n<li>Instructions Updated instructions for Sections A, E and F.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.6 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<li>Section B was revised to clarify: Provide name of <strong>replaced\/released<\/strong><br \/>\nLSRP.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.5 \u2013 3\/4\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.4 \u2013 1\/12\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>General Instructions #1.b. and #4. Clarification of who is to sign form,<\/li>\n<li>Section E: Child Care Center added as relationship to site,<\/li>\n<li>Section F: form must be submitted before LSRP can request disbursement<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" valign=\"top\"><a id=\"model_deed_notice\" name=\"model_deed_notice\"><\/a><a href=\"..\/#model_deed_notice\">Model Deed Notice (Appendix B for the ARRCS Rule)<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\"><\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added a return address label to top of document 5\/7\/2018.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" valign=\"top\"><a id=\"tem_deednotice\" name=\"tem_deednotice\"><\/a><a href=\"..\/#tem_deednotice\">Model Termination of Deed Notice (Appendix C for the ARRCS Rule)<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\"><\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added a return address label to top of document 5\/7\/2018.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" valign=\"top\"><a id=\"mon_well_a\" name=\"mon_well_a\"><\/a><a href=\"..\/#mon_well_a\">Monitoring Well Certification Form A \u2013 As-Built Certification<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 9\/7\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li style=\"color: green\">New document.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"3\" valign=\"top\"><a id=\"mon_well_b\" name=\"mon_well_b\"><\/a><a href=\"..\/#mon_well_b\">Monitoring Well Certification Form B \u2013 Location Certification<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 2\/26\/2013<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section C: Question 5: changed NVGD TO NGVD (2\/11\/2019)Question 3, increased reporting accuracy of Lat\/Long to 1\/100 of a secondQuestion 4, increased reporting accuracy of State Plane Coord to nearest footQuestion 5, added Elev Top of Outer Casing, Elev of Ground, and Vertical Datum reference.<\/li>\n<li>Section D: Added Firm Name and Certificate of Authorization #<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.2 \u2013 9\/12\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Compressed form to 1 page<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.1 \u2013 11\/28\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>General: Removed format restriction for zip codes<\/li>\n<li>Section C: Question 2 fixed entry box that didn\u2019t work<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"1\" valign=\"top\"><a id=\"noi_air_rap\" name=\"noi_air_rap\"><\/a><a href=\"..\/#noi_air_rap\">NOI Initial Indoor Air RAP Application Checklist<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 2\/17\/2026<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"1\" valign=\"top\"><a id=\"notification_form\" name=\"notification_form\"><\/a><a href=\"..\/#notification_form\">Notice of Failure to Comply with a Mandatory or Expedited Site-specific Remediation Timeframe<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 4\/27\/2016<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"5\" valign=\"top\"><a id=\"ust_closure\" name=\"ust_closure\"><\/a><a href=\"..\/#ust_closure\">Out of Service Extension Request for an Underground Storage Tank System<\/a><\/p>\n<p class=\"name_change\">(Was \u201cUnderground Storage Tank System Closure Notification \/ Extension Request form\u201d)<\/p>\n<\/td>\n<td valign=\"top\">1.5 \u2013 9\/17\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.4 \u2013 6\/9\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Changed Name of form from \u201cClosure Notification \u2013 Extension Request of an Underground Storage Tank System\u201d to \u201cOut of Service Extension Request for Underground Storage Tank System\u201d<\/li>\n<li>Removed all mention of closure notification<\/li>\n<li>Section D: Replaced \u201cPiping Only\u201d column with \u201cDocumentation Submitted (Site Investigation or Leak Detection Documentation)\u201d<\/li>\n<li>Added Certification for owner or operator<\/li>\n<li>Updated instructions<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 3\/4\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 1\/12\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Grammar &amp; punctuation, LSRP signature page made consistent<br \/>\nwith other forms<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"4\" valign=\"top\"><a id=\"pust_application_reg\" name=\"pust_application_reg\"><\/a><a href=\"..\/#pust_application_reg\">Petroleum UST Fund Application (Regulated)<\/a><\/p>\n<p class=\"name_change\">(Name change. Was PUST Remediation, Upgrade and Closure Fund Application form \u2013 Regulated Tanks) (Closes 6\/30\/2010)<\/p>\n<\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 2\/1\/2026<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated document headers<\/li>\n<li>Updated mailing addresses<\/li>\n<li>Updated Phone Numbers<\/li>\n<li>Updated Email Addresses<\/li>\n<li>Added 2\/1\/2026 version of the UST Fund Cost Guide<\/li>\n<li>Removed Language related to Project Summary sheet<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 9\/17\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 3\/4\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<li>New version number for splitting the instructions from the<br \/>\nform<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 6\/8\/2010<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" valign=\"top\"><a id=\"oversight_service\" name=\"oversight_service\"><\/a><a href=\"..\/#oversight_service\">Oversight Service<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\"><\/td>\n<td class=\"cellChangesInfo\" valign=\"top\"><\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormNameIndented\" valign=\"top\"><a id=\"direct_oversight\" name=\"direct_oversight\"><\/a><a href=\"..\/#direct_oversight\">Direct Oversight<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 7\/26\/2023<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormNameIndented\" valign=\"top\"><a id=\"traditional_oversight\" name=\"traditional_oversight\"><\/a><a href=\"..\/#traditional_oversight\">Traditional Oversight<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 7\/26\/2023<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"4\" valign=\"top\"><a id=\"pust_application_unreg\" name=\"pust_application_unreg\"><\/a><a href=\"..\/#pust_application_unreg\">Petroleum UST Fund Application (Unregulated)<\/a><\/p>\n<p class=\"name_change\">(Name change. Was PUST Remediation, Upgrade and Closure Fund Application form \u2013 Unregulated Tanks) (Including Residential Heating Oil Tanks)<\/p>\n<\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 2\/1\/2026<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated document headers<\/li>\n<li>Updated mailing addresses<\/li>\n<li>Updated Phone Numbers<\/li>\n<li>Updated Email Addresses<\/li>\n<li>Added 2\/1\/2026 version of the UST Fund Cost Guide<\/li>\n<li>Removed Language related to Project Summary sheet<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 9\/17\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 3\/4\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<li>New version number for splitting the instructions from the form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 6\/8\/2010<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormNameIndented\" valign=\"top\"><a id=\"pust_application_projsum\" name=\"pust_application_projsum\"><\/a><a href=\"..\/#pust_application_projsum\">Project Summary Sheet Spreadsheet<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Spreadsheet<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"4\" valign=\"top\"><a id=\"par_online\" name=\"par_online\"><\/a><a href=\"..\/#par_online\">Preliminary Assessment Report Service \u2013 Online<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 6\/7\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update logo image and replaced \u201cand\u201d with ampersand<\/li>\n<li>Updated compatibility information for Internet browsers and the CID<\/li>\n<li>Updated the instructions for certification: removed \u201ccheck off one or both: \u2018I directly oversaw\u2026\u2019, \u2018I personally reviewed\u2026\u2019\u201d<\/li>\n<li>Removed the word \u201cpotential\u201d from item 9. Case Inventory Document Upload<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 1\/15\/2020<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added 4 questions about emerging contaminants after PA Submission Scope<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 8\/21\/2017<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated Instructions<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0- 3\/15\/2017<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"10\" valign=\"top\"><a id=\"pa_si\" name=\"pa_si\"><\/a><a href=\"..\/#pa_si\">Preliminary Assessment\/Site Investigation form<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.2 \u2013 5\/27\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed references to NJDEP-iMap in instructions<\/li>\n<li>Section D: Question 15 changed to remove reference to NFA\/RAO<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.1 \u2013 4\/1\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added PA, SI, and UST Unkno0wn Source Investigation checkboxes to top of form<\/li>\n<li>Split into 2 forms. Common sections and certifications in the key document forms were moved into<br \/>\na new cover form called the Cover\/Certification Form.<br \/>\nThe following sections were moved: A \u2013 Site<br \/>\nInformation; B \u2013 Submission Status; C \u2013 Site Use; D \u2013 Case Type; E \u2013 Public Funds; and certifications for the<br \/>\nPerson Responsible and LSRP.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.0 \u2013 6\/9\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added PA, SI, and UST Unkno0wn Source Investigation checkboxes to top of form<\/li>\n<li>Section B: Submission Status:<br \/>\nChanged title from \u201cSubmittal\u201d to \u201cSubmission\u201d<br \/>\nAdded \u201cPA only \u2013 No EDD\u201d checkbox to question 1.<br \/>\nQuestion 2: sorted list alphabetically, split RI\/RAW into two lines, and added new column \u201cDate of Previous NJDEP Approval\u201d<\/li>\n<li>Section C Site Use: Added \u201cOther\u201d to Intended Future Site Use<\/li>\n<li>Section D Case type:<br \/>\nRemoved \u201cTSCA\u201d and \u201cOther\u201d from Federal Case types<br \/>\nAdded Question 1 \u201cIs the party conducting remediation a government entity?\u201d<\/li>\n<li>Section E Public Funds: Added \u201cEnvironmental Infrastructure Trust\u201d<\/li>\n<li>Section F General: Sections F, G, and I were completely reorganized into new Sections F) General, G) PA, and H) SI.<\/li>\n<li>Section J Lab Data Question 6: changed \u201cComments\u201d to \u201cProvide the page number for the \u201cReliability of Data\u201d section of the report\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.7 \u2013 3\/25\/2013<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>(old) Sec B NJDEP Case Manager: Removed this section<\/li>\n<li>Section B Submittal Status:<br \/>\nAdded question for method of EDD submittal.<br \/>\nAdded Technical Impracticability Determination to list.<\/li>\n<li>Section D Case type: Alphabetized list. Expanded choices for types of federal cases,<br \/>\nadded \u201cSpill Act Defense\u201d, removed \u201cnot applicable\u201d and \u201cSite is located within an<br \/>\neconomic development priority Area\u201d.<\/li>\n<li>Section F General: Updated instructions for order of magnitude evaluation;<br \/>\nQuestion 9 \u2013 added questions B and C: \u201cDoes the site contain any land use features..\u201d,<br \/>\nand \u201cHave the necessary land use permits been issued..\u201d<\/li>\n<li>Section G Site Info: Section G5 inserted new question b.7) \u201cAre any soil analytical<br \/>\nresults greater than \u2026 Criteria in an ESNR\u201d<\/li>\n<li>Section H Lab Data Added new Section H. Laboratory Data<\/li>\n<li>Section I Alt STD: Added \u201cecological site specific goal\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.6 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed Non-LSRP and Subsurface Evaluator certification pages.<\/li>\n<li>Section B: added radionuclide reports list.<\/li>\n<li>Section G: changed question 10 to specify if RI complete<br \/>\nfor AOCs or entire site Added question 11 to ask if the AOCs<br \/>\nwere addressed within the regulatory timeframe.<\/li>\n<li>Section H: Added question H4.e. about Unknown Source Investigation.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.5 \u2013 1\/10\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>General: Removed format restrictions for zip codes.<\/li>\n<li>Section C: Added updated list of submittals, Added column<br \/>\nfor Document Withdrawal.<\/li>\n<li>Section G: Added question 9 about ESNRs.<\/li>\n<li>Section I: Changed word \u201cdeviation\u201d to \u201cvariance\u201d.<\/li>\n<li>Instructions updated.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.4 \u2013 9\/7\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">Form<\/p>\n<ul>\n<li>Section K: Updated address on the 3 Section K pages Removed<br \/>\nthe Block and lot, Owners Name, and Assigned Case Manager sections<br \/>\non Subsurface Evaluator Certification page.<\/li>\n<\/ul>\n<p>Instructions<\/p>\n<ul>\n<li>Instructions: Updated address.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 2\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\"><\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 1\/12\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 2\/26\/2010<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Grammar &amp; punctuation,<\/li>\n<li>Section J: Developer Certification removed, Edits for fill-in codes in Adobe Acrobat<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"3\" valign=\"top\"><a id=\"pa_si_online\" name=\"pa_si_online\"><\/a><a href=\"..\/#pa_si_online\">Preliminary Assessment\/Site Investigation Service \u2013 Online<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 1\/15\/2020<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added 4 questions about emerging contaminants after PA\/SI Submission Scope.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 8\/21\/2017<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated Instructions<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 3\/15\/2017<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"1\" valign=\"top\"><a id=\"pp_acoc\" name=\"pp_acoc\"><\/a><a href=\"..\/#pp_acoc\">Pre-Purchase Administrative Consent Order Certification<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 9\/2\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"3\" valign=\"top\"><a id=\"pub_notification_online\" name=\"pub_notification_online\"><\/a><a href=\"..\/#pub_notification_online\">Public Notification and Outreach Service<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 1\/18\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated instruction for submission name (3) and Questions (13).<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 8\/26\/2020<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed reference to version number for Public Notice form.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 4\/21\/2020<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"12\" valign=\"top\"><a id=\"public_notification\" name=\"public_notification\"><\/a><a href=\"..\/#public_notification\">Public Notification and Outreach form<\/a><\/td>\n<td valign=\"top\">2.3 \u2013 9\/1\/2020<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B: Changed wording of question from \u201cinvestigation commenced\u201d to investigation will or have commenced\u201d.<\/li>\n<li>Instructions: Added to instruction for Section B \u201cthe date in question #4 should be within 14 days prior to the date in question #2\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.2 \u2013 7\/30\/2020<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added to instructions to indicate which fields are required.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.1 \u2013 7\/22\/2020<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added a field for comments<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.0 \u2013 6\/22\/2020<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section A: removed everything except Site Name, PI Number, and Case Tracking Numbers<\/li>\n<li>Section C: Removed section<\/li>\n<li>Section D: Removed section<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.9 \u2013 6\/22\/2020<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B:<br \/>\n\u2013 Added new question 2 \u2013 Provide date of initial field activities<br \/>\n\u2013 Added new question 3 about offsite migration<br \/>\n\u2013 Removed question 5 \u2013 did you provide electronic copies?<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.8 \u2013 9\/17\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.7 \u2013 4\/16\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section A: moved case tracking numbers to separate line and added \u201cfor this submission\u201d<\/li>\n<li>Section B:<br \/>\n\u2013 Question 2 \u2013 removed Alternate plan<br \/>\n\u2013 Question 6 \u2013 changed from a question about excess fill to a question about public notice using an alternate plan.<\/li>\n<li>Section C: Removed \u201cNo changes since last submittal\u201d<\/li>\n<li>Section D: Removed \u201cNo changes since last submittal\u201d<\/li>\n<li>Instructions: updated citations from Tech Rules to ARRCS<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.6 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed Non-LSRP and Subsurface Evaluator certification pages.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.5 \u2013 11\/30\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>General: Removed formatting for zip codes<\/li>\n<li>Section A: Changed \u201cDate trigger compliance with Section 30\u2026\u201d<br \/>\nto \u201cDate Remediation Initiated Pursuant to N.J.A.C. 7:26C-2:\u201d<\/li>\n<li>Section B: Added new question 1, question 4 was incorporated<br \/>\ninto question 2, \u201clocal health agency\u201d was added to question<br \/>\n6. Question 7 explanation expanded. Question order was changed.<\/li>\n<li>Section D: Removed facility information, block and lot, and<br \/>\nowner information sections in the subsurface certification.<\/li>\n<li>Instructions: all sections updated.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.4 \u2013 5\/25\/11<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 3\/4\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 1\/12\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section C: Developer Certification removed<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"15\" valign=\"top\"><a id=\"receptor_eval\" name=\"receptor_eval\"><\/a><a href=\"..\/#receptor_eval\">Receptor Evaluation form<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.7 \u2013 8\/6\/2025<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Changes made to back-end to fix submission errors<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.6 \u2013 7\/11\/2025<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li><a href=\"https:\/\/deptest.nj.gov\/srp\/wp-content\/uploads\/sites\/39\/receptor_evaluation_report_changelog.pdf\" target=\"_blank\" rel=\"noopener\">Change Log<\/a> <span class=\"text-12\">[pdf]<\/span><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.5 \u2013 6\/28\/2021<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>updated logo<\/li>\n<li>Applicability:<br \/>\n\u2013 Added following text: The receptor evaluation is an iterative process; therefore, the form should be completed for all contamination at the site. The form<br \/>\nshould be completed in full with each submission.<\/li>\n<li>Timeframe:<br \/>\n\u2013 Fixed typo: added \u201cUse\u201d to Unrestricted Use Remedial Action Outcome<\/li>\n<li>Signatures:<br \/>\n\u2013 Updated name of form: Authorization to Submit A Report \/ Form Through NJDEP Online.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.4 \u2013 12\/3\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Changed \u201cCommunication Center Number(s) and\/or ISRA number(s) for this submission\u201d to \u201cCase Tracking Number(s) for this submission\u201d<\/li>\n<li>Section B Question 3 added checkboxes for On-site\/Off-site<\/li>\n<li>Section C Question 1 changed the checkboxes from single boxes to Yes\/No boxes; added more information to DNAPL note<\/li>\n<li>Question 2 added citation<\/li>\n<li>Section D Added new Question 1 to match rule language: \u201cHas all potential CAOCs been evaluated?\u201d<\/li>\n<li>Question 2 (old question 1) reworded, removed \u201cUnknown\u201d check box and \u201cIf unknown, explain\u201d field.<\/li>\n<li>Added new Question 3: \u201cHas GW investigation been conducted?\u201d<\/li>\n<li>Question 4 (old question 2) removed \u201cUnknown\u201d and \u201cAwaiting Lab Data\u201d checkboxes, and \u201cIf unknown, explain\u201d field.<\/li>\n<li>Question 5 (old question 3) added citation<\/li>\n<li>Added new Question 6: Identify GW classification<\/li>\n<li>Question 7 (old question 4) moved the checkboxes to question 9 (old 6)<\/li>\n<li>Question 8 (old question 5) added a note about excluding redacted wells<\/li>\n<li>Question 9 (old question 6) Added citation to door to door survey, removed \u201cif survey not complete explain\u201d, added checkboxes from old question 4<\/li>\n<li>Question 10 (old question 7) changed \u201cIf No proceed to Section E\u201d to \u201cproceed to question 12\u201d<\/li>\n<li>Removed old Question 8<\/li>\n<li>Question 11 (old question 9) added \u201cnot attributed to background conditions\u201d; changed \u201cFederal Drinking Water Standards\u201d to \u201cState Safe Drinking Water levels, N.J.A.C 7:1E, whichever is applicable\u201d; removed \u201cawaiting lab data\u201d reworded note about IEC guidance<\/li>\n<li>Question 12; added \u201cnot attributed to background conditions\u201d; removed \u201cawaiting lab data\u201d<\/li>\n<li>Question 13 added citation<\/li>\n<li>Section E Combined question 1 and 2, added conditions that trigger a VI investigation that were not included, changed the single checkboxes to Yes\/No checkboxes, and added a date field for each condition.<\/li>\n<li>Removed \u201cawaiting lab data\u201d from instructions between old questions 2 and 3, made instructions bold<\/li>\n<li>Question 2 changed \u201cGround Water Vapor Screening Level\u201d to \u201cVapor Intrusion Ground<\/li>\n<li>Water Screening Levels\u201d and added citation<\/li>\n<li>Question 4 changed \u201ccontamination\u201d to \u201ccontaminant\u201d changed \u201cthreats\u201d to \u201ctriggers noted in question 1 above\u201d, added \u201c(e.g. chlorinated hydrocarbons)\u201d to second checkbox; added new checkbox for \u201cOther specific triggers\u201d; added \u201cOther specific triggers\u201d checkbox, changed all single checkboxes to Yes\/No checkboxes<\/li>\n<li>Question 5 changed wording from a statement to a question<\/li>\n<li>Question 6 removed NA checkbox, added \u201cHas lab data been received\u201d and \u201cdid constituents exceed SG Screening Levels\u201d<\/li>\n<li>Question 7 added \u201cHas lab data been received\u201d and \u201cdid constituents exceed SG Screening Levels\u201d<\/li>\n<li>Question 8 changed \u201csite\u201d to \u201cdischarge\u201d<\/li>\n<li>Question 9 changed wording from statement to question; removed \u201cawaiting lab data\u201d, reworded bullets<\/li>\n<li>Question 10 reworded question, removed \u201cawaiting lab data\u201d<\/li>\n<li>Added new question 11 \u201cDo one or more buildings have an Indeterminate VI Pathway status\u201d<\/li>\n<li>Section F Vapor Intrusion Section was extensively changed, some questions were removed, others were added, and the order of questions was changed.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.3 \u2013 12\/12\/2016<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Changed instructions at top of form from \u201cif not submitted through the RIR Online Service\u201d to \u201cif not submitted through a Remedial Phase Online Service\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.2 \u2013 10\/7\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section F: Question 9 refers to a section that no longer exists. Question was rewritten.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.1 \u2013 8\/11\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section E:<br \/>\n\u2013 Corrected error on questions 7 and 8. Changed from \u201cproceed to 10\u201d to \u201cproceed to 12\u201d.<br \/>\n\u2013 Question 10 removed \u201cand confirmed contamination above the Rapid Action Levels\u201d from second sentence.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.0 \u2013 4\/1\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Split into 2 forms. Site location information in section A and certifications were moved into a new cover form called the Cover\/Certification Form.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.9 \u2013 4\/21\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section E: Fixed mistake in question 10 and 11 in the \u201cIf Yes to #\u2026\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.8 \u2013 1\/27\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section F:<br \/>\nChanged question 4 to collect information about nearby surface waters and Trout production\/maintenance.<br \/>\nAdded new questions 5, 6, and 7 about regulated land use features and LURP approvals.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.7 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed Non-LSRP and Subsurface Evaluator certification pages.<\/li>\n<li>Section A: Added paragraph explaining purpose of form.<\/li>\n<li>Section E: Removed \u201cother existing conditions\u201d from question<br \/>\n4 and made it a new question 2, Changed language in old question<br \/>\n4: added \u201cpetroleum free product\u201d to 30 ft check box and \u201cnon-petroleum<br \/>\nfree product to 100 ft check box.<\/li>\n<li>Question 7: changed \u201cvapor intrusion sampling\u201d to \u201csoil gas<br \/>\nsampling\u201d.<\/li>\n<li>Changed \u201cNJDEP\u2019s Vapor Intrusion Rapid Action Levels\u201d to \u201cNJDEP\u2019s<br \/>\nRapid Action Levels\u201d throughout section.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.6 \u2013 3\/8\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section A: Removed \u201cNo Change\u201d check box and added checkboxes<br \/>\nto capture reason for submitting form<\/li>\n<li>Section C: Inserted new question 2. For Soil Migration Pathway<\/li>\n<li>Section D: Inserted new question 3. \u2013 \u201cHas GW been delineated<br \/>\nto Applicable Remediation Standard?\u201d<\/li>\n<li>Added new question 11. \u2013 \u201cHas GW receptor investigation<br \/>\nbeen completed?\u201d<\/li>\n<li>Section E: Inserted new question 2. \u2013 \u201cHas GW contamination<br \/>\nbeen delineated to the vapor trigger?\u201d<br \/>\nDivided last question into two parts.<\/li>\n<li>Section F: Expanded question 6. To indicate types of media<br \/>\nimpacted.<\/li>\n<li>INSTRUCTIONS<br \/>\nRevised instructions for Updates in General Instructions, and<br \/>\nadded instructions for new questions in sections C, D, and E.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.5 \u2013 10\/20\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Fixed broken hyperlink in form to EPA DNAPL Overview<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 2\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 1\/12\/1<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>General Instructions. Timeframes: As detailed in the<br \/>\nCompliance Advisory Update, the proposed Mandatory timeframe<br \/>\nfor submission of the initial RE form is 2 years. If remediation<br \/>\nwas initiated prior to November 4, 2009 the initial RE Mandatory<br \/>\ntimeframe is March 1, 2012; As detailed in the Compliance Advisory<br \/>\nUpdate, the proposed regulatory date has been extended to March<br \/>\n1, 2011 or one year after the initiation of remediation;<\/li>\n<li>Section A: Added if there were no changes to the form the<br \/>\nLSRP shall skip to Section G; Checkboxes for Initial Submission,<br \/>\nInterim Submission, or No Change added to Sections B, C, D,<br \/>\nE, &amp; F,<\/li>\n<li>Section B: Questions 2 and 3 have been revised to follow formats<br \/>\nof other forms;<\/li>\n<li>Section C: Clarification in the instructions for high concentration<br \/>\nsource materials has been added;<\/li>\n<li>Section D: The direction for action on an IEC has been removed<br \/>\nfrom the form and guides the LSRP to the website instead;<\/li>\n<li>Section E: The LSRP is now required to identify any structures\/<br \/>\nsensitive populations on a scaled map. An option has been added<br \/>\nto indicate that no structures exist within the specified distances.<br \/>\nThe direction for action on an IEC has been removed from the<br \/>\nform and guides the LSRP to the website instead. Several questions<br \/>\nhave been changed to include the proposed vapor intrusion rapid<br \/>\naction levels and the indoor air results that fall between the<br \/>\nindoor air screening levels and the vapor intrusion rapid action<br \/>\nlevels and the actions that need to be taken;<\/li>\n<li>Section F: The LSRP is now required to answer Yes or No to<br \/>\nthe site conditions;<\/li>\n<li>Section G: Developer Certification removed<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormNameIndented\" rowspan=\"2\" valign=\"top\"><a id=\"receptor_eval_well_search\" name=\"receptor_eval_well_search\"><\/a><a href=\"..\/#receptor_eval_well_search\">Well Search Spreadsheet<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 2\/18\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Table format changed to match new dataminer query<\/li>\n<li>Additional fields added under case information tab<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 1\/12\/11<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Headers &amp; footers and \u2018DRAFT\u2019 watermark removed<br \/>\nto prevent errors when extracting data<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"12\" valign=\"top\"><a id=\"rar\" name=\"rar\"><\/a><a href=\"..\/#rar\">Remedial Action Report form<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">Online<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Paper RAR forms are no longer accepted. The RAR must be submitted via the RAR Online Service.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.2 \u2013 5\/27\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B: Added question 5 \u201cDoes this RAR address a discharge\/release from a federally regulated UST?\u201d and added Applicability Table to instructions<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.1 \u2013 4\/1\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Split into 2 forms. Common sections and certifications in the key document forms were moved into a new cover form called the Cover\/Certification Form.<br \/>\nThe following sections were moved: A \u2013 Site Information; B \u2013 Submission Status; C \u2013 Site Use; D \u2013 Case Type; E \u2013 Public Funds; and certifications for the Person Responsible<br \/>\nand LSRP.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.0 \u2013 6\/9\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B Submission:<br \/>\n\u2013 Changed title from \u201cSubmittal\u201d to \u201cSubmission\u201d<br \/>\n\u2013 Question 1: Added \u201cNot Applicable \u2013 No EDD\u201d checkbox.<br \/>\n\u2013 Question 2: sorted list alphabetically, split RI\/RAW into two lines, and added new column \u201cDate of Previous NJDEP Approval\u201d<\/li>\n<li>Section C Site Use: Added \u201cOther\u201d to Intended Future Site Use<\/li>\n<li>Section D Case type:<br \/>\n\u2013 Removed \u201cTSCA\u201d and \u201cOther\u201d from Federal Case types<br \/>\n\u2013 Added Question 1 \u201cIs the party conducting remediation a government entity?\u201d<\/li>\n<li>Section E Public Funds: Added \u201cEnvironmental Infrastructure Trust\u201d<\/li>\n<li>Sections G:<br \/>\n\u2013 Question 1: added a place to list permit type and location in report<br \/>\n\u2013 Question 4 moved here from old Section I.<br \/>\n\u2013 Old questions 4, 5, 6, 7, 11, 12, 13 moved to Section H.<br \/>\n\u2013 Question 14 removed.<\/li>\n<li>Section H:<br \/>\n\u2013 Questions 2 and 3 removed<br \/>\n\u2013 Question 4 moved to section G<\/li>\n<li>Section I (old): Removed<\/li>\n<li>Section I (new):<br \/>\n\u2013 Question 2: changed \u201cInhalation Pathway\u201d to \u201cSoil Remediation Standards\u201d<br \/>\n\u2013 Added new question 4: \u201cWas an interim standard used\u2026\u201d<br \/>\n\u2013 Question 7: removed \u201cImmobile Chemicals List\u201d and \u201cSoil and Ground Water Analytical Data Evaluation\u201d<\/li>\n<li>Section J Alternative and Clean Fill Use:<br \/>\n\u2013 Question 4: changed from question about blending pesticides to \u201cWill material be sent off-site for use as<br \/>\nalternative and\/or clean fill at a non-SRP site\u201d<\/li>\n<li>Section K Remedial Action Report Info:<br \/>\n\u2013 Added question 1: Did the remedy include a remedial action for soils?<br \/>\n\u2013 Added question 5: Did the remedy include a remedial action for ground water?<br \/>\n\u2013 Question 6: (old 4) changed from \u201cIs an unrestricted use being proposed\u201d to \u201cIs a restricted use required?\u201d<br \/>\n\u2013 Added question 9: Did the remedy include a remedial action for ESNRs?<br \/>\n\u2013 Removed NRD question<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.9 \u2013 5\/8\/2013<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section G: Question 14 \u2013 corrected mistake changed \u201c11 or 12\u201d to \u201c12 or 13\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.8 \u2013 3\/25\/2013<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Sec B Submittal Status:<br \/>\n\u2013 Added question for method of EDD submittal;<br \/>\n\u2013 Added technical Impracticability Determination to the list<\/li>\n<li>Section D Case Type: Added new Section D: Case Type;<\/li>\n<li>Section G General:<br \/>\n\u2013 Made Question 2b into Question 3.<br \/>\n\u2013 Added Pesticides to question 7.<br \/>\n\u2013 Added N\/A box to Question 8.<br \/>\n\u2013 Moved table from Question 11 to new item 14.<br \/>\n\u2013 Added new Question 13 \u201cAre ground water contaminants from the site discharging to an ESNR\u201d.<\/li>\n<li>Section H Site Cond:<br \/>\n\u2013 Added new Question 1: \u201cHas dioxin been detected in any site media\u201d.<br \/>\n\u2013 Removed dioxin from table in Question 2.<br \/>\n\u2013 Changed \u201ccompound\/element\u201d to \u201ccontaminant\u201d in Question 3.<br \/>\n\u2013 Added \u201cscreening level\u201d to questions 3 and 4.<br \/>\n\u2013 Added ESNRs to GW and Soil columns in Question 5.<\/li>\n<li>Section I Alt STDs: Added \u201cecological site specific goal\u201d;<\/li>\n<li>Section J Applicable STDs:<br \/>\n\u2013 Changed \u201ccompounds\u201d to \u201ccontaminants\u201d in Question 1;<br \/>\n\u2013 Added table of compliance averaging methods to Question 2;<\/li>\n<li>Section K Soil\/Sed Reuse section renamed \u201cAlternative and Clean Fill Use\u201d, section rewritten;<\/li>\n<li>Section L RAR Info: Made question 1 from Section M a new question 12<\/li>\n<li>Section M Misc: Removed section<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.7 \u2013 8\/23\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section L: Miscellaneous, Question #2, Fixed Yes\/No box<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.6 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>General Instructions: Modified instructions for submission<br \/>\nof RE forms and Case Inventory Documents (CID) Removed Non-LSRP<br \/>\nand Subsurface Evaluator certification pages.<\/li>\n<li>Section B: added radionuclide reports list.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.5 \u2013 1\/10\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section A: Changed citation for \u201cDate Remediation Initiated\u201d<\/li>\n<li>Section B: Changed title to \u201cSubmittal Status\u201d, updated Alternate<br \/>\nStandard form name, replaced Annual Fee form with Public Notification<br \/>\nForm, and added withdrawal column<\/li>\n<li>Section E: Turned first 2 questions in General Section moved<br \/>\nto New Section \u201cScope of Remedial Action Workplan\u201d, and added<br \/>\nquestions about total AOCs for the site and total AOCs addressed<br \/>\nin submittal. Removed question 7 about dioxin (dioxin now included<br \/>\nin section G.)<\/li>\n<li>Section G: (old section F) added Surface Water column, dioxin,<br \/>\nand EPH<\/li>\n<li>Section H: (old section G) changed the word \u201cdeviation\u201d to<br \/>\n\u201cvariance\u201d through out section<\/li>\n<li>Section I: (old section H) Check boxes reworded to yes\/no<br \/>\nquestions<\/li>\n<li>Section J: First two questions moved to \u201cApplicable Remediation<br \/>\nStandards\u201d<\/li>\n<li>Section K: (old section J) questions 3 and 4 added to Ecological<br \/>\nsection.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.4 \u2013 9\/7\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">Form<\/p>\n<ul>\n<li>Section A: Removed Mailing Address line<\/li>\n<li>Section B: Added Remedial Action Report<\/li>\n<li>Section E: Question 1 \u2013 added space for total number of<br \/>\ncontaminated AOCs. Added table for question 12. Question 2 \u2013<br \/>\nNumbered two sub-questions, added place to answer second sub-question<\/li>\n<li>Section G: Change yes\/no statement to a question<\/li>\n<li>Section J: Made question 4 part of question 3, renumbered<br \/>\n5 and 6.<\/li>\n<li>Section M: removed first section of subsurface evaluator certification.<\/li>\n<\/ul>\n<p>Instructions<\/p>\n<ul>\n<li>Changed all instances of \u201cDepartment\u201d to \u201cNJDEP\u201d.<\/li>\n<li>Section A: Added examples of NJDEP site ID numbers. Removed<br \/>\nmailing address only instruction<\/li>\n<li>Section E: Removed instruction to attach Section H2 of the<br \/>\nPA\/SI form. Added requirement to identify All AOCs individually.<\/li>\n<li>Section G: Spell out Vapor Intrusion and Johnson &amp; Ettinger.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 3\/4\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 1\/12\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Citation edits, Grammar &amp; punctuation,<\/li>\n<li>Section B: RAO Report changed to RAO letter,<\/li>\n<li>Section E: Renumbered,<\/li>\n<li>Section L: Developer Certification removed<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"6\" valign=\"top\"><a id=\"rar_online\" name=\"rar_online\"><\/a><a href=\"..\/#rar_online\">Remedial Action Report Service \u2013 Online<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.5 \u2013 2\/22\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Under 1. Files you will need (minimum):<br \/>\n\u2013 In a), added sentence to indicate RE not required if an Unrestricted Use RAO is issued within one year.<\/li>\n<li>Under 13. Attachment Upload. Added new a) add a RE<\/li>\n<li>Updated portal comments link<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.4 \u2013 1\/3\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Under Scope removed the following questions:<br \/>\n\u2013 Is the Remedial Action complete for contaminated AOCs addressed in this submission?<br \/>\n\u2013 Is the Remedial Action complete for ALL contaminated AOCs associated with the case?<br \/>\n\u2013 Date Remedial Action complete for all contaminated AOCs associated with this case<\/li>\n<li>Replaced with:<br \/>\n\u2013 Has the Remedial Action remedy been implemented for all contaminated AOCs addressed in this submission?<br \/>\n\u2013 Is this the final Remedial Action Report to be filed for this case?<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 1\/15\/2020<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added 4 questions about emerging contaminants after RAR Details Scope.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 2\/27\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated broken hyperlinks in Sections 12C, D, and F.<\/li>\n<li>Fixed two typos in 12G<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 8\/21\/2017<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated Instructions<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0- 3\/15\/2017<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"4\" valign=\"top\"><a id=\"rao_online\" name=\"rao_online\"><\/a><a href=\"..\/#rao_online\">Response Action Outcome Service \u2013 Online<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 11\/19\/2025<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated program name<\/li>\n<li>Added link to RAO guidance<\/li>\n<li>Added Information about the GIS deliverable required when using Long-Term Vapor Intrusion Monitoring and Indeterminate Vapor Intrusion (VI) Pathway Not Yet Evaluated Notices<\/li>\n<li>A Note was added that Child Care RAOs where the Child Care operation is the only operation on the Site must use the Entire Site Submission Type<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 6\/7\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>replaced \u201cand\u201d with ampersand in title<\/li>\n<li>Added Note in box to indicate that this service cannot be used to submit an amended RAO<\/li>\n<li>Removed the word \u201cpotential\u201d from item 9. Case Inventory Document Upload<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 3\/21\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>GIS Compatible Map Instruction temporarily removed pending GIS guidance<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 1\/25\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormNameIndented\" rowspan=\"5\" valign=\"top\"><a id=\"authorize_online\" name=\"authorize_online\"><\/a><a href=\"..\/#authorize_online\">Authorization To Submit a Report \/ Form through NJDEP Online<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.4 \u2013 9\/17\/2024<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">Form<\/p>\n<ul>\n<li>Changed heading to match current program name.<\/li>\n<li>Section B \u2013 STATEMENT OF AUTHORIZATION TO SUBMIT A REPORT \/ FORM:<br \/>\n\u2013 Added \u201cRE Form\u201d as a checkbox option.<br \/>\n\u2013 Added \u201cLNAPL Form\u201d as a checkbox option.<br \/>\n\u2013 Removed \u201c(check one box only)\u201d<\/li>\n<\/ul>\n<p>Instructions<\/p>\n<ul>\n<li>Changed heading to match current program name.<\/li>\n<li>Section B \u2013 STATEMENT OF AUTHORIZATION TO SUBMIT A REPORT \/ FORM:<br \/>\n\u2013 Removed \u201c(check one box only)\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 1\/3\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added RAO checkbox<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 4\/17\/2020<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Changed the name of the form from \u201cAuthorization to Submit a Remedial Phase Report Through DEP Online\u201d to \u201cAuthorization to Submit a Report \/ Form Through DEP Online\u201d<\/li>\n<li>Section B: Added checkboxes for the types of report and forms that can submitted with this form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 5\/23\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Changed \u201cRemedial Action Outcome\u201d to \u201cResponse Action Outcome\u201d on form and instructions<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 4\/3\/2017<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"9\" valign=\"top\"><a id=\"raw\" name=\"raw\"><\/a><a href=\"..\/#raw\">Remedial Action Workplan form<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">Online<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Paper RAW forms are no longer accepted. The RAW must be submitted via the RAW Online Service.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.1 \u2013 4\/1\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Split into 2 forms. Common sections and certifications in the key document forms were moved into a new cover form called the Cover\/Certification Form.<br \/>\nThe following sections were moved: A \u2013 Site Information; B \u2013 Submission Status; C \u2013 Site Use; D \u2013 Case Type; E \u2013 Public Funds; and certifications for the Person<br \/>\nResponsible and LSRP.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.0 \u2013 6\/9\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B Submission: Changed title from \u201cSubmittal\u201d to \u201cSubmission\u201d<br \/>\nQuestion 2: Added \u201cNot Applicable \u2013 No EDD\u201d checkbox.<br \/>\nQuestion 3: changed from \u201cIs CEA included?\u201d to \u201cIs a PBR required?\u201d<br \/>\nQuestion 4: sorted list alphabetically, split RI\/RAW into two lines, and added new column \u201cDate of Previous NJDEP Approval\u201d<\/li>\n<li>Section C Site Use: Added \u201cOther\u201d to Intended Future Site Use<\/li>\n<li>Section D Case type: Removed \u201cTSCA\u201d and \u201cOther\u201d from Federal Case types<br \/>\nAdded Question 1 \u201cIs the party conducting remediation a government entity?\u201d<\/li>\n<li>Sec E Public Funds: Added \u201cEnvironmental Infrastructure Trust\u201d<\/li>\n<li>Sections G, H, I(old): Questions in Sections F, G, and I were reorganized into Sections G and H; many questions were removed.<\/li>\n<li>Section J(old) Applicable Stds: Removed<\/li>\n<li>Section I Alternative and Clean Fill Use:<br \/>\nQuestion 3: added \u201cat an SRP site\u201d<br \/>\nQuestion 4: changed from question about blending pesticides to \u201cWill material be sent off-site for use as alternative and\/or clean fill at a non-SRP site\u201d<\/li>\n<li>Sec J Remedial Action Workplan Info:<br \/>\nChanged Subtitle from \u201cGeneral\u201d to \u201cPermit Information\u201d<br \/>\nQuestion 1: changed from \u201cAre NJDEP-approved permits required?\u201d to \u201cDoes the site contain any land use features that have been impacted by remedial activities\u201d<br \/>\nAdded question 3 about federal, state, or local permits<br \/>\nAdded question 4: Is a soil remedial action required?<br \/>\nRemoved question7: Is the proposed remedial action a presumptive remedy?<br \/>\nAdded question 9: Is a ground water remedial action required?<br \/>\nAdded question 11 about NAPL<br \/>\nChanged subtitle from Ecological to ENSR<br \/>\nAdded question 12: Is a remedial action required for an ESNR?<br \/>\nAdded question 14: Was a soil gas investigation required?<br \/>\nRemoved NRD question<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.6 \u2013 3\/25\/2013<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B Submittal Status:<br \/>\n\u2013 Added question for excess alternative fill;<br \/>\n\u2013 Added question for method of EDD submittal;<br \/>\n\u2013 Added question to ask if a CEA proposal included.<br \/>\n\u2013 Added technical Impracticability Determination to the list<\/li>\n<li>Section D Case Type: Added new Section D: Case Type.<\/li>\n<li>Section G General:<br \/>\n\u2013 Added Pesticides to question 7; Added new Question 11: \u201cAre ground water contaminants<br \/>\nfrom the site discharging to an ESNR\u201d.<br \/>\n\u2013 Added N\/A box to Question 8.<br \/>\n\u2013 Moved table in Question 10 to new item 12.<br \/>\n\u2013 Added new Question 11: are contaminants discharging to surface water?<\/li>\n<li>Section H Site Cond:<br \/>\nAdded new Question 1: \u201cHas dioxin been detected in any site media\u201d; Removed dioxin<br \/>\nfrom table in Question 2; Changed \u201ccompound\/element\u201d to \u201ccontaminant\u201d in Question 3;<br \/>\nAdded \u201cscreening level\u201d to questions 3 and 4; Added ESNRs to GW and Soil columns in<br \/>\nQuestion 5, added ESNR to migration pathway and exposure in Question 6<\/li>\n<li>Section I Alt Stds: Added \u201cecological site specific goal\u201d.<\/li>\n<li>Section J Applicable Stds: Changed \u201ccompounds\u201d to \u201ccontaminants\u201d in Question 1.<br \/>\nAdded table of compliance averaging methods to question 2.<\/li>\n<li>Section K Soil\/Sed Reuse section renamed \u201cAlternative and Clean Fill Use\u201d, section rewritten.<\/li>\n<li>Section L RAW Info:<br \/>\n\u2013 Added new Question 2 \u201cAre land use permits required\u2026\u201d<br \/>\n\u2013 Made question 1 from Section M a new question 12.<\/li>\n<li>Section M Misc: Removed section.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.5 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>General Instructions: Modified instructions for submission<br \/>\nof RE forms and Case Inventory Documents (CID) Removed Non-LSRP<br \/>\nand Subsurface Evaluator certification pages.<\/li>\n<li>Section B: added radionuclide reports list.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.4 \u2013 1\/10\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section A: Changed citation for \u201cDate Remediation Initiated\u201d<\/li>\n<li>Section B: Changed title to \u201cSubmittal Status\u201d, updated Alternate<br \/>\nStandard form name, replaced Annual Fee form with Public Notification<br \/>\nForm, and added withdrawal column<\/li>\n<li>Section E: Turned first 2 questions in General Section moved<br \/>\nto New Section \u201cScope of Remedial Action Workplan\u201d, and added<br \/>\nquestions about total AOCs for the site and total AOCs addressed<br \/>\nin submittal. Removed question 7 about dioxin (dioxin now included<br \/>\nin section G.)<\/li>\n<li>Section G: (old section F) added Surface Water column, dioxin,<br \/>\nand EPH<\/li>\n<li>Section H: (old section G) changed the word \u201cdeviation\u201d to<br \/>\n\u201cvariance\u201d through out section<\/li>\n<li>Section I: (old section H) Check boxes reworded to yes\/no<br \/>\nquestions<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 9\/7\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">Form<\/p>\n<ul>\n<li>Section A: Removed Mailing Address line<\/li>\n<li>Section B: Added Remedial Action Report<\/li>\n<li>Section E: Question 1 \u2013 Added space for total number of<br \/>\ncontaminated AOCs. Added table for question 11.<\/li>\n<li>Section G: Spell out vapor intrusion.<\/li>\n<li>Section M: Removed first section of subsurface evaluator certification.<\/li>\n<\/ul>\n<p>Instructions<\/p>\n<ul>\n<li>Changed all instances of \u201cDepartment\u201d to \u201cNJDEP\u201d.<\/li>\n<li>Section A: Added examples of NJDEP site ID numbers. Removed<br \/>\nmailing address only instruction<\/li>\n<li>Section E: Removed instruction to attach Section H2 of the<br \/>\nPA\/SI form. Added requirement to identify All AOCs individually.<\/li>\n<li>Section G: Spell out Vapor Intrusion and Johnson &amp; Ettinger.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 3\/4\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 1\/12\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Grammar &amp; punctuation, Citation edits, Grammar &amp; punctuation,<\/li>\n<li>Section E: Renumbered,<\/li>\n<li>Section F: Removed SW column,<\/li>\n<li>Section L: Developer Certification removed,<\/li>\n<li>Section M: 3 signature pages added<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"5\" valign=\"top\"><a id=\"raw_online\" name=\"raw_online\"><\/a><a href=\"..\/#raw_online\">Remedial Action Workplan Service \u2013 Online<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.4 \u2013 2\/22\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated Logo<\/li>\n<li>Updated compatibility information for Internet browsers<\/li>\n<li>Under 1. Files you will need (minimum):<br \/>\n\u2013 In a), changed \u201cversion 1.2 or later only\u201d to \u201cuse the latest version available\u201d<\/li>\n<li>Updated the instructions for certification<\/li>\n<li>Updated portal comments link<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 1\/15\/2020<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added 4 questions about emerging contaminants after RAW Details Scope.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 3\/13\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Under f) RAW Miscellaneous Details, Permit Information, added new \u201cif Yes\u201d and \u201cif No\u201d details below \u201cIf \u201cYes\u201d, indicate if the authorization<br \/>\nrequest is attached to this submission.\u201d<\/li>\n<li>Added new first paragraph under \u201c13. Attachment Upload (Not the RAW Report yet)\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 8\/21\/2017<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated Instructions<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0- 3\/15\/2017<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"2\" valign=\"top\"><a id=\"rap_admin_changes\" name=\"rap_admin_changes\"><\/a><a href=\"..\/#rap_admin_changes\">RAP Administrative Changes Application<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 3\/3\/2026<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li><a href=\"https:\/\/deptest.nj.gov\/srp\/wp-content\/uploads\/sites\/39\/rap_admin_changes_changelog_1_1.pdf\">Change log<\/a> <span class=\"text-12\">[pdf]<\/span><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 2\/17\/2026<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"15\" valign=\"top\"><a id=\"gw_ra_permit\" name=\"gw_ra_permit\"><\/a><a href=\"..\/#gw_ra_permit\">Remedial Action Permit Application Form for Ground Water<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.5 \u2013 9\/17\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.4 \u2013 6\/18\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B. updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.3 \u2013 6\/19\/2017<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B. updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.2 \u2013 8\/29\/2016<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B: Added check box for: All outstanding Remedial Action Permit annual fees are paid in full.<\/li>\n<li>Section F: removed questions 3 (Does the ground water plume extend offsite) and 4 (What is the expected expiration date of the CEA).<\/li>\n<li>Section G: Question 4 Added: \u201c(horizontally and vertically)\u201d and \u201cand ground water flow direction\u201d to question.<\/li>\n<li>Section H: Question 1 added \u201cground water or vapor intrusion\u201d to question.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.1 \u2013 7\/1\/2016<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B. updated fees<\/li>\n<li>Section G. question 4 added place to provide the location of delineation maps<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.0 \u2013 6\/15\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees for FY 2016<\/li>\n<li>Updated email addresses to new format<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.9 \u2013 9\/23\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added note to instructions Section N concerning certification by owner.<\/li>\n<li>Removed fees before 6\/30\/14.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.8 \u2013 6\/16\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added new fees effective July 1, 2014<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.7 \u2013 6\/9\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated following instructions:<br \/>\nAdded link in first line of instructions for the Monitored Natural Attenuation Technical Guidance.<br \/>\nSection F, instruction 5: reworded and added GIS instructions.<br \/>\nSection G, instruction 3: added Table 4 from MNA guidance<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.6 \u2013 1\/27\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added LSRP and Subsurface Evaluator boxes to top of form<\/li>\n<li>Section A: Added Blocks and lots and Federal Case Type.<\/li>\n<li>Section B: Changed the title of the section;<br \/>\nMoved Fee Billing Contact to its own section (C). Renumbered following sections.<\/li>\n<li>Section C: Now fee billing contact<\/li>\n<li>Section F: (CEA Info) Section completely rewritten.<\/li>\n<li>Section G:<br \/>\n(Monitoring Maint..) Question 1.a. added new questions 1) and 2); added N\/A boxes to 3) and 4);<br \/>\nQuestion 1.b. added fifth question about expected duration of active remediation;<br \/>\nAdded new question 2: has a Technical Impracticability Proposal been submitted;<br \/>\nReworded old question 2 into new questions 3 and 4.<\/li>\n<li>Section H:<br \/>\n(Financial Assurance) Dropped \u201cEngineering Control\u201d from title;<br \/>\nQuestion 5 replaced with question about converting RFS to FA;<br \/>\nOrder of questions 6 and 7 reversed;<br \/>\nAdded \u201cLoan or Grant\u201d to list of FA Mechanisms in question 7;<br \/>\nAdded Name of Financial institution to contact information in question 8;<br \/>\nChanged question 9 from a question to a statement.<\/li>\n<li>Section I:<br \/>\n(Land Use) Changed Name from \u201cProperty Use\u201d to \u201cLand Use\u201d;<br \/>\nAdded more choices to question one to match choices in question 2<\/li>\n<li>Section J:<br \/>\n(RE Eval) Added \u201cEcological Receptor\u201d to list in question 1;<br \/>\nAdded new question 3: \u201cHave any vapor mitigation systems been installed\u2026\u201d.<br \/>\nAdded new question 4: \u201cHave any POET systems been installed\u2026\u201d.<br \/>\nAdded new question 5: \u201cAre any potable wells that do not have a POET water system being<br \/>\nsampled regularly \u2026\u201d.<\/li>\n<li>Section K: (Other Permits) Reworded question, changed title from \u201cOther Remediation Permits\u201d to \u201cOther Remedial Action Permits\u201d<\/li>\n<li>Section N: (Current Owner) Changed title from \u201cCurrent Owner of the Site \u2013 Co-Permittee\u201d to \u201cCurrent Owner of the Site Information and Certification\u201d<\/li>\n<li>Section O: Added Subsurface Evaluator Cert<\/li>\n<li>Addendum:<br \/>\nUpdated Addendum to match changes made in main body of the form.<br \/>\nAdded Addendum B for additional property owners<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.5 \u2013 6\/19\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fee amounts<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.4 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed Non-LSRP and Subsurface Evaluator certification pages.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 1\/18\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>GIS Instructions updated<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 3\/4\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 1\/12\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Citation edits,<\/li>\n<li>Section L: Developer Certification removed,<\/li>\n<li>Section M: Removed some Block and Lots on SE signature pg<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"17\" valign=\"top\"><a id=\"soil_rem_permit_app\" name=\"soil_rem_permit_app\"><\/a><a href=\"..\/#soil_rem_permit_app\">Remedial Action Permit Application Form for Soils<\/a><\/td>\n<td valign=\"top\">2.6 \u2013 9\/17\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.5 \u2013 6\/18\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B: updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.4 \u2013 6\/19\/2017<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B: updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.3 \u2013 8\/29\/2016<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B: Added check box for: All outstanding Remedial Action Permit annual fees are paid in full.<\/li>\n<li>Section F: Added new question 6: \u201cInstrument\/Control\/File Number(s)\u201d;<br \/>\nBroke old question 8 about historic fill into 2 questions. (now questions 9 and 10)<\/li>\n<li>Section H: Question 5 added: Please do not attach tables from reports.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.2 \u2013 7\/1\/2016<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B. updated fees<\/li>\n<li>Section F. question 1 added place to provide the location of delineation maps<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.1 \u2013 6\/15\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees for FY 2016<\/li>\n<li>Updated email addresses to new format<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.0 \u2013 9\/23\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added note to instructions Section L concerning certification by owner<\/li>\n<li>Removed fees before 6\/30\/14<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.9 \u2013 6\/16\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added new fees effective July 1, 2014<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.8 \u2013 6\/9\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated instructions in Section F, instruction 9: reworded and added GIS instructions.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.7 \u2013 1\/27\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added LSRP and Subsurface Evaluator boxes to top of form<\/li>\n<li>Section A: Added Blocks and lots and Federal Case Type.<\/li>\n<li>Section F:<br \/>\n(Deed Notice..): Question 1: split first check box into two.<br \/>\nQuestion 2 rewritten and moved to end of section (question 9);<\/li>\n<li>Section G:<br \/>\n(FA): Question 5 replaced with question about converting RFS to FA;<br \/>\nOrder of questions 6 and 7 reversed;<br \/>\nAdded Name of Financial institution to contact information in question 8;<br \/>\nChanged question 9 from a question to a statement;<\/li>\n<li>Section I: (RE Eval): Question 3: removed need to list buildings on form<\/li>\n<li>Section J: (Other Permits): Reworded question, changed title from \u201cOther Remediation Permits\u201d to \u201cOther Remedial Action Permits\u201d<\/li>\n<li>Section L: (Current Owner): Changed title from \u201cCurrent Owner of the Site \u2013 Co-Permittee\u201d to \u201cCurrent Owner of the Site Information and Certification\u201d<\/li>\n<li>Section O: Added Subsurface Evaluator Cert<\/li>\n<li>Addendum:<br \/>\nUpdated Addendum to match changes made in main body of the form.<br \/>\nAdded Addendum B for additional property owners.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.6 \u2013 7\/24\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B. Moved fee billing contact information from Section<br \/>\nB. to New Section C. and renumbered subsequent sections<\/li>\n<li>Section E. Updated question 1 and added question 2 (Was GIS<br \/>\nCompatible map sent..) and 9 (Is Deed Notice for historic fill)<\/li>\n<li>Section G. \u2013 Removed \u201cEngineering Control\u201d from title<br \/>\nof section \u2013 Added \u201cloan or grant\u201d to question 6<\/li>\n<li>Section H. \u2013 Made question 3 part of question 2<br \/>\n\u2013 Added extra space for question 4<\/li>\n<li>Section I. Added new Section I. Receptor Evaluation Summary<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.5 \u2013 6\/19\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fee amounts<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.4 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed Non-LSRP and Subsurface Evaluator certification pages<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.3 \u2013 1\/18\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>GIS Instructions updated<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.2 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 3\/4\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 1\/12\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Grammar &amp; punctuation, Mailing address for form changed,<\/li>\n<li>Section E: Deed Notice \u2013 more information requested,<\/li>\n<li>Section G: Engineering Control \u2013 whole section changed,<\/li>\n<li>Section I: Developer Certification removed<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"1\" valign=\"top\"><a id=\"rap_combine\" name=\"rap_combine\"><\/a><a href=\"..\/#rap_combine\">RAP Application to Administratively Combine RAPs<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 2\/17\/2026<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"4\" valign=\"top\"><a id=\"rap_contact\" name=\"rap_contact\"><\/a><a href=\"..\/#rap_contact\">Remedial Action Permit Contact Information Change<\/a><\/p>\n<p class=\"name_change\">(Name change. Was \u201cRemedial Action Permit Transfer\/Change of Property Ownership Application and Contact Information Changes\u201d)<\/p>\n<\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 2\/17\/2026<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.2 \u2013 1\/27\/2023<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated program name in header and on pager 4.<\/li>\n<li>Section E: Added \u201cin instances of the sale of the property\u201d in note<\/li>\n<li>Section H: Changed \u201cRAP Transfer\/Change of Property Ownership Application\u201d to \u201cRAP Contact Information Change Form\u201d<\/li>\n<li>Addendum B, Addendum to Section E: Added \u201cin instances of the sale of the property\u201d in note<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.1 \u2013 6\/2\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update logo image and replaced \u201cand\u201d with ampersand<\/li>\n<li>Section B: changed \u201cCo-Permittee designated with Primary Responsibility\u201d to \u201cCo-Permittee designated as Primary Contact\u201d<\/li>\n<li>Section F: changed wording of section title and both checkboxes from \u201cdesignated with Primary Responsibility\u201d to \u201cdesignated as Primary Contact\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.0 \u2013 6\/17\/2019<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"24\" valign=\"top\"><a id=\"rem_action_transfer\" name=\"rem_action_transfer\"><\/a><a href=\"..\/#rem_action_transfer\">Remedial Action Permit Transfer\/Change of Property Ownership Application<\/a><\/p>\n<p class=\"name_change\">(Name change. Was \u201cRemedial Action Permit Transfer\/Change of Property Ownership Application and Contact Information Changes\u201d)<\/p>\n<\/td>\n<td valign=\"top\">4.1 \u2013 6\/16\/2025<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated dates and fees<\/li>\n<li>Removed problematic signature field on the PDF<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">4.0 \u2013 11\/18\/2024<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li><a href=\"https:\/\/deptest.nj.gov\/srp\/wp-content\/uploads\/sites\/39\/rem_action_permit_transfer_changelog_v4.pdf\">Change log<\/a> <span class=\"text-12\">[pdf]<\/span><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">3.0 \u2013 6\/3\/2024<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated dates and fees<\/li>\n<li>Added date and signature fields to PDF<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.9 \u2013 6\/5\/2023<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update fees and program name<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.8 \u2013 6\/2\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update logo image and replaced \u201cand\u201d with ampersand<\/li>\n<li>Section B: updated note regarding fees at beginning of section<\/li>\n<li>Section E: updated wording of checkbox at bottom of section regarding the Primary Contact for Permit Compliance<\/li>\n<li>Section F: bolded and underlined \u201cOriginal\u201d<\/li>\n<li>Section G:<br \/>\n\u2013 Question 4 \u2013 added examples of government entities, added charter school to public and private schools<br \/>\n\u2013 Question 7 \u2013 bolded and underlined \u201cOriginal\u201d<\/li>\n<li>Addendum B:<br \/>\n\u2013 updated wording of checkbox below email address<br \/>\n\u2013 Question 4 \u2013 added examples of government entities, added charter school to public and private schools<br \/>\n\u2013 Question 7 \u2013 bolded and underlined \u201cOriginal\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.7 \u2013 5\/2\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.6 \u2013 5\/3\/2021<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.5 \u2013 10\/16\/2020<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section G. question 8 added box for Surety Bond<\/li>\n<li>Addendum B question 8 added box for Surety Bond<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.4 \u2013 7\/1\/2019<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B.<br \/>\nupdated fees,<br \/>\nRemoved \u201cUpdate Fee Billing Contact Information\u201d and \u201cUpdate Person Responsible for Conducting the Remediation\u201d, put on new form<br \/>\nRemoved all checkboxes for \u201c\u2026with a Change in Primary Responsibility for Permit Compliance\u201d<\/li>\n<li>Section C. Was \u201cPRCP Contact Info\u201d now \u201cFee Billing Contact Person\u201d<\/li>\n<li>Section D. Was \u201cProperty Owner Contact Info\u201d, now \u201cFormer Property Owner\u201d<\/li>\n<li>Section E. Was \u201cFee Billing Contact Person\u201d now \u201cNew\/Current Property Owner\u201d<\/li>\n<li>Section F. Was \u201cFormer Property Owner\u201d now \u201cAttached Documents\u201d<\/li>\n<li>Section G.<br \/>\nWas \u201cNew Property Owner\u201d now \u201cFinancial Assurance\u201d<br \/>\nExpanded explanations in questions 5 and 7<\/li>\n<li>Section H. Changed from \u201cOther Remedial Action Permits\u201d to \u201cOther Information Provided\u201d<\/li>\n<li>Section L. New section added, LSRP Certification<\/li>\n<li>Addendum A Added new Addendum A for additional PRCRs<\/li>\n<li>Addendum B Old Addendum A<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.3 \u2013 6\/18\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B: updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.2 \u2013 1\/3\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B. Removed old fees; Updated which sections to complete for the last 2 choices<\/li>\n<li>Section C. Added sentence to note; Changed \u201cName of the Person Responsible for Conducting the Remediation whose contact Information is changing\u201d to \u201cName<br \/>\nof the Organization\/Affiliation for the Person Responsible for Conducting the Remediation whose contact Information is changing\u201d<\/li>\n<li>Section D. New Section for Property Owner Contact Information<\/li>\n<li>Section F. Added question: \u201cIs the former owner the same as the Person\u2026\u201d<\/li>\n<li>Section G. Changed \u201cPROSPECTIVE PERMITTEE\u201d to \u201cPROSPECTIVE CO-PERMITTEE\u201d; Added new question 2: \u201cIs Financial Assurance currently in place for the existing<br \/>\npermit?\u201d; Question 7 removed Loan and Grant checkbox<\/li>\n<li>Addendum: Change title from \u201cAdditional Persons Responsible for Conducting the Remediation and Property Owners\u201d to \u201cAdditional Property Owner (If<br \/>\nApplicable)\u201d; Added new question 2: \u201cIs Financial Assurance currently in place for the existing permit?\u201d; Question 7 removed Loan and Grant checkbox;<br \/>\nRemoved Addendum to Section I. Person Responsible for Conducting the Remediation Information and Certification<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.1 \u2013 6\/19\/2017<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B. updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.0 \u2013 8\/29\/2016<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Changed title of form: Added \u201cAND CONTACT INFORMATION CHANGES\u201d<\/li>\n<li>Section B: Added check box for: All outstanding Remedial Action Permit annual fees are paid in full.<br \/>\nMoved new contact information to new Section C.<\/li>\n<li>New Section C: changed \u201cPermitee\/Co-Permitee\u201d to \u201cPerson Responsible for Conducting the Remediation\u201d<\/li>\n<li>New Section E: removed question: \u201cHave all outstanding Remedial Action Permit fees been paid ?\u201d<\/li>\n<li>Old Section G (Land Use): section deleted<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.9 \u2013 7\/1\/2016<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B. updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.8 \u2013 2\/1\/2016<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated program name<\/li>\n<li>Section B: Added new 3 new fee categories to differentiate between transfers that include a change in Primary Responsibility for Permit Compliance and transfers that don\u2019t.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.7 \u2013 6\/15\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees for FY 2016<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.6 \u2013 4\/1\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added \u201cProperty\u201d to title and \u201cAlso use this form to update Contact Information\u201d to top of form<\/li>\n<li>Section B. Added a box for updating permittee or fee billing contact information.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.5 \u2013 6\/16\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added new fees effective July 1, 2014<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.4 \u2013 1\/27\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section A: Added Blocks and lots and Federal Case Type.<\/li>\n<li>Section B:<br \/>\nChanged the title of the section;<br \/>\nMoved Fee Billing Contact to its own section (C). Renumbered following sections.<\/li>\n<li>Section C: Now fee billing contact<\/li>\n<li>Section D:<br \/>\nChanged title from \u201cCo-Permitee\u201d to \u201cFormer Property Owner\/Co-Permittee\u201d.<br \/>\nAdded 2 questions<\/li>\n<li>Section E:<br \/>\nChanged title from \u201cNew Co-Permitee\u201d to \u201cNew Property Owner\/Co-Permittee\u201d.<br \/>\nRemoved question asking reason for transfer.<br \/>\nAdded 2 new questions<\/li>\n<li>Section F:<br \/>\n(Financial Assurance) Dropped \u201cEngineering Control\u201d from title;<br \/>\nSplit old question 2 into two questions;<br \/>\nQuestion 5 \u201cIs the estimate attached?\u201d removed<br \/>\nOrder of questions 6 and 7 reversed;<br \/>\nAdded \u201cLoan or Grant\u201d to list of FA Mechanisms in question 7;<br \/>\nAdded Name of Financial institution to contact information in question 8;<br \/>\nChanged question 9 from a question to a statement.<\/li>\n<li>Section G:<br \/>\n(Land use) Changed Name from \u201cProperty Use\u201d to \u201cLand Use\u201d;<br \/>\nExpanded this section to match the permit applications.<\/li>\n<li>Section H:<br \/>\n(Other Permits) Reworded question, changed title from \u201cOther Remediation Permits\u201d to \u201cOther Remedial Action Permits\u201d<\/li>\n<li>Section J: Added new section to provide certification for \u201cFormer Owner of the site\u201d.<\/li>\n<li>Section K: Added new section to provide certification for \u201cNew Owner of the site\u201d.<\/li>\n<li>Removed certification page for LSRP<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.3 \u2013 6\/19\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fee amounts<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.2 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed Non-LSRP and Subsurface Evaluator certification pages.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.1 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 3\/4\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Form finalized<\/li>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<li>Corrected Fee Amounts<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">0.0 \u2013 1\/12\/11 <span class=\"infoNote\">Draft<\/span><\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"10\" valign=\"top\"><a id=\"rap_initial_gw\" name=\"rap_initial_gw\"><\/a><a href=\"..\/#rap_initial_gw\">Remedial Action Permit Initial Application \u2013 Ground Water<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.9 \u2013 6\/16\/2025<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated dates and fees<\/li>\n<li>Removed problematic signature fields to PDF<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.8 \u2013 6\/3\/2024<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated dates and fees<\/li>\n<li>Added date and signature fields to PDF<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.7 \u2013 6\/5\/2023<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update fees and program name<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.6 \u2013 1\/27\/2023<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update program name in header and on page 9.<\/li>\n<li>Section B:<br \/>\n\u2013 First checkbox under 1 changed \u201cResponse Action Outcome (RAO)\u201d to \u201cRestricted or Limited Restricted Use Response Action Outcome (RAO).\u201d<br \/>\n\u2013 Added note to 2: \u201cPay the Ground Water Active System RAP Fee \u2013 Initial for a Technical Impracticability (TI) determination.\u201d<\/li>\n<li>Section F: Change \u201cElectronic copy of the Vapor Intrusion Long-Term Monitoring Plan, if applicable.\u201d To \u201cElectronic copy of the Vapor Intrusion (VI) Long-Term<br \/>\nMonitoring (LTM) Plan or the VI Change in Use Evaluation Plan, or both if applicable.\u201d<\/li>\n<li>Section G:<br \/>\n\u2013 Moved question 4 about technical impracticability to question 3 and added \u201ccomplete Section 4.b (Active Remediation) below\u201d in addition to providing the location in<br \/>\nreport.<br \/>\n\u2013 Question 4.a.vii (old question 3.a.vii) \u2013 changed \u201cprovide the location in the RAR (Section #) that justifies the protectiveness of the remedy\u201d to \u201cthen a Ground<br \/>\nWater RAP Application for MNA should not be submitted.\u201d<\/li>\n<li>Section J: changed \u201csoil gas\u201d to \u201csub-slab soil gas\u201d, added \u201cNJDEP\u2019s\u201d, added \u201cor a VI Change in Use Evaluation Plan, or both\u201d. Removed \u201cprovide location in report\u201d<br \/>\nand added 3 checkboxes to clearly indicate the scenario for the sub-slab soil gas contamination remaining beneath any building. Expanded instructions after question 2.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.5 \u2013 6\/2\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update logo image and replaced \u201cand\u201d with ampersand<\/li>\n<li>Section D: updated wording of checkbox at bottom of section regarding the Primary Contact for Permit Compliance<\/li>\n<li>Section E: updated wording of checkbox at bottom of section regarding the Primary Contact for Permit Compliance<\/li>\n<li>Section F: bolded and underlined \u201cOriginal\u201d<\/li>\n<li>Section H:<br \/>\n\u2013 Question 2 \u2013 added examples of government entities, added charter school to public and private schools, removed \u201cowner or operator of a small business\u201d box as<br \/>\na choice for the Person Responsible for Conducting the Remediation \u2013 Co-Permittee since this option is only available for the current property owner, updated<br \/>\nthe language for the \u201cowner or operator of a small business\u201d choice to be \u201cat the location of the site\u201d<br \/>\n\u2013 bolded and underlined \u201cOriginal\u201d in question 6<\/li>\n<li>Addendum A:<br \/>\n\u2013 updated wording of checkbox below email address<br \/>\n\u2013 Question 2 \u2013 added examples of government entities, added charter school to public and private schools, removed \u201cowner or operator of a small business\u201d box<br \/>\nas a choice for the Person Responsible for Conducting the Remediation \u2013 Co-Permittee since this option is only available for the current property owner, updated<br \/>\nthe language for the \u201cowner or operator of a small business\u201d choice to be \u201cat the location of the site\u201d<br \/>\n\u2013 Question 5 \u2013 bolded and underlined \u201cOriginal\u201d<\/li>\n<li>Addendum B:<br \/>\n\u2013 updated wording of checkbox below email address<br \/>\n\u2013 Question 2 \u2013 added examples of government entities, added charter school to public and private schools<br \/>\n\u2013 Question 6 \u2013 bolded and underlined \u201cOriginal\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.4 \u2013 5\/2\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.3 \u2013 5\/3\/2021<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.2 \u2013 10\/16\/2020<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section H: question 7 Added box for Surety Bond<\/li>\n<li>Addendum A: question 6 Added box for Surety Bond<\/li>\n<li>Addendum B: question 7 Added box for Surety Bond<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.1 \u2013 6\/17\/2019<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.0 \u2013 5\/30\/2019<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li style=\"color: green\">New form.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"10\" valign=\"top\"><a id=\"rap_initial_soil\" name=\"rap_initial_soil\"><\/a><a href=\"..\/#rap_initial_soil\">Remedial Action Permit Initial Application \u2013 Soil<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.9 \u2013 6\/16\/2025<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated dates and fees<\/li>\n<li>Removed problematic signature fields to PDF<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.8 \u2013 6\/3\/2024<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated dates and fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.7 \u2013 6\/5\/2023<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update fees and program name<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.6 \u2013 1\/27\/2023<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update program name in header and on page 9.<\/li>\n<li>Section B: First checkbox under 1 changed \u201cResponse Action Outcome (RAO)\u201d to \u201cRestricted or Limited Restricted Use Response Action Outcome (RAO).\u201d<\/li>\n<li>Section J: Question 2 \u2013 changed \u201csoil gas\u201d to \u201csub-slab soil gas\u201d, added \u201cNJDEP\u2019s\u201d, added \u201cor a VI Change in Use Evaluation Plan, or both\u201d. Removed \u201cprovide<br \/>\nlocation in report\u201d and added 3 checkboxes to clearly indicate the scenario for the sub-slab soil gas contamination remaining beneath any building. Expanded<br \/>\ninstructions after question 2.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.5 \u2013 6\/2\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update logo image and replaced \u201cand\u201d with ampersand<\/li>\n<li>Section B: updated note regarding fees at beginning of section<\/li>\n<li>Section D: updated wording of checkbox at bottom of section regarding the Primary Contact for Permit Compliance<\/li>\n<li>Section E: updated wording of checkbox at bottom of section regarding the Primary Contact for Permit Compliance<\/li>\n<li>Section F: bolded and underlined \u201cOriginal\u201d<\/li>\n<li>Section G:<br \/>\n\u2013 added new question 12 to know if the AOC for the Soil RAP Application is limited to historic fill or<br \/>\nhistorically applied pesticides (HAP) only and if so, questions 13 and 14 below may be skipped as the SRS-MGW<br \/>\nexposure pathway does not apply<br \/>\n\u2013 added new question 13 to know how the Soil Remediation Standards for the Migration to Ground Water (SRS-MGW)<br \/>\nexposure pathway was addressed in the unsaturated zone for the AOCs for the Soil RAP Application as applicable<br \/>\n\u2013 Question 14 (old question 13) \u2013 removed unnecessary capitalizations<br \/>\n\u2013 Question 15 \u2013 added \u201cremaining\u201d to the wording of question and renamed column headings and added two more columns<br \/>\nfor inhalation exposure pathway<\/li>\n<li>Section I:<br \/>\n\u2013 Question 2 \u2013 added examples of government entities, added charter school to public and private schools, removed \u201cowner or operator of a small business\u201d box<br \/>\nas a choice for the Person Responsible for Conducting the Remediation \u2013 Co-Permittee since this option is only available for the current property owner, updated<br \/>\nthe language for the \u201cowner or operator of a small business\u201d choice to be \u201cat the location of the site\u201d<br \/>\n\u2013 Question 6 \u2013 bolded and underlined \u201cOriginal\u201d<\/li>\n<li>Addendum A:<br \/>\n\u2013 updated wording of checkbox below email address regarding the Primary Contact for Permit Compliance<br \/>\n\u2013 added examples of government entities, added charter school to public and private schools, removed \u201cowner or operator of a small business\u201d box as a choice<br \/>\nfor the Person Responsible for Conducting the Remediation \u2013 Co-Permittee since this option is only available for the current property owner, updated the<br \/>\nlanguage for the \u201cowner or operator of a small business\u201d choice to be \u201cat the location of the site\u201d<br \/>\n\u2013 bolded and underlined \u201cOriginal\u201d in question 5<\/li>\n<li>Addendum B:<br \/>\n\u2013 updated wording of checkbox below email address regarding the Primary Contact for Permit Compliance<br \/>\n\u2013 added examples of government entities, added charter school to public and private schools<br \/>\n\u2013 bolded and underlined \u201cOriginal\u201d in question 6<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.4 \u2013 5\/2\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.3 \u2013 5\/3\/2021<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.2 \u2013 10\/16\/2020<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section I: question 7 Added box for Surety Bond<\/li>\n<li>Addendum A: question 6 Added box for Surety Bond<\/li>\n<li>Addendum B: question 7 Added box for Surety Bond<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.1 \u2013 6\/17\/2019<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.0 \u2013 5\/30\/2019<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li style=\"color: green\">New form.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormNameIndented\" rowspan=\"4\" valign=\"top\"><a id=\"lsrp_supp_cert_gw_rap\" name=\"lsrp_supp_cert_gw_rap\"><\/a> <a href=\"..\/#lsrp_supp_cert_gw_rap\">LSRP Supplemental Certification For Initial Ground Water Remedial Action Permit (RAP) Application<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 12\/22\/2025<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li><a href=\"https:\/\/deptest.nj.gov\/srp\/wp-content\/uploads\/sites\/39\/lsrp_supplemental_cert_initial_gw_rap_app_changelog_1_3.pdf\" target=\"_blank\" rel=\"noopener\">Change Log<\/a> <span class=\"text-12\">[pdf]<\/span><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.2 \u2013 12\/18\/2024<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li><a href=\"https:\/\/deptest.nj.gov\/srp\/wp-content\/uploads\/sites\/39\/lsrp_supplemental_cert_initial_gw_rap_app_changelog_1_2.pdf\" target=\"_blank\" rel=\"noopener\">Change Log<\/a> <span class=\"text-12\">[pdf]<\/span><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.1 \u2013 6\/17\/2024<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li><a href=\"https:\/\/deptest.nj.gov\/srp\/wp-content\/uploads\/sites\/39\/lsrp_supplemental_cert_initial_gw_rap_app_changelog_1_1.pdf\" target=\"_blank\" rel=\"noopener\">Change Log<\/a> <span class=\"text-12\">[pdf]<\/span><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.0 \u2013 5\/23\/2024<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li style=\"color: green\">New form.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"1\" valign=\"top\"><a id=\"rap_initial_media\" name=\"rap_initial_media\"><\/a><a href=\"..\/#rap_initial_media\">RAP Initial \/ New Media Component Application \u2013 Soil, Ground Water, and Indoor Air<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 2\/17\/2026<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"10\" valign=\"top\"><a id=\"rap_modification_gw\" name=\"rap_modification_gw\"><\/a><a href=\"..\/#rap_modification_gw\">Remedial Action Permit Modification Application \u2013 Ground Water<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.9 \u2013 6\/16\/2025<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated dates and fees<\/li>\n<li>Removed problematic signature fields to PDF<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.8 \u2013 6\/3\/2024<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated dates and fees<\/li>\n<li>Added date and signature fields to PDF<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.7 \u2013 6\/5\/2023<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update fees and program name<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.6 \u2013 1\/27\/2023<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update program name in header and on page 8.<\/li>\n<li>Section B:<br \/>\n\u2013 Question 1, 4th checkbox, changed \u201cChange in the Vapor Intrusion Long-Term Monitoring Plan for the site\u201d to \u201cElectronic copy of the Vapor Intrusion (VI) Long-Term<br \/>\nMonitoring (LTM) Plan or the VI Change in Use Evaluation Plan, or both for the site.\u201d Added \u201cfor the site at the end of the 5th and 6th checkboxes.<br \/>\n\u2013 Question 2, added note: \u201cPay the Ground Water Active System RAP Fee \u2013 Initial for a Technical Impracticability (TI) determination.\u201d<\/li>\n<li>Section F: 11th checkbox, added \u201cor the VI Change in Use Evaluation Plan, or both\u201d, removed \u201cand a scaled site map clearly identifying the building(s).\u201d<\/li>\n<li>Section G:<br \/>\n\u2013 Moved question 4 about technical impracticability to question 3.<br \/>\n\u2013 Question 4.a.vii. (old question 3.a.vii) \u2013 changed \u201cprovide the justification of the protectiveness of the remedy in Section K below\u201d to \u201cthen a Ground Water<br \/>\nRAP Application for MNA should not be submitted.\u201d<\/li>\n<li>Section J: Question 2 \u2013 changed \u201csoil gas\u201d to \u201csub-slab soil gas\u201d, added \u201cNJDEP\u2019s\u201d, added \u201cor a VI Change in Use Evaluation Plan, or both\u201d. Removed \u201cprovide location<br \/>\nin report\u201d and added 3 checkboxes to clearly indicate the scenario for the sub-slab soil gas contamination remaining beneath any building. Expanded instructions after<br \/>\nquestion 2.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.5 \u2013 6\/2\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update logo image and replaced \u201cand\u201d with ampersand<\/li>\n<li>Section B: updated note regarding fees at beginning of section<\/li>\n<li>Section D: updated wording of checkbox at bottom of section regarding the Primary Contact for Permit Compliance<\/li>\n<li>Section E: updated wording of checkbox at bottom of section regarding the Primary Contact for Permit Compliance<\/li>\n<li>Section F:<br \/>\n\u2013 added \u201cwith a summary report of the necessary documentation supporting the modification\u201d to the cover letter check box<br \/>\n\u2013 bolded and underlined \u201cOriginal\u201d<\/li>\n<li>Section H:<br \/>\n\u2013 Question 2 \u2013 added examples of government entities, added charter school to public and private schools, removed \u201cowner or operator of a small business\u201d box<br \/>\nas a choice for the Person Responsible for Conducting the Remediation \u2013 Co-Permittee since this option is only available for the current property owner, updated<br \/>\nthe language for the \u201cowner or operator of a small business\u201d choice to be \u201cat the location of the site\u201d<br \/>\n\u2013 Question 6 \u2013 bolded and underlined \u201cOriginal\u201d<\/li>\n<li>Addendum A:<br \/>\n\u2013 updated wording of checkbox below email address<br \/>\n\u2013 Question 2 \u2013 added examples of government entities, added charter school to public and private schools, removed \u201cowner or operator of a small business\u201d box<br \/>\nas a choice for the Person Responsible for Conducting the Remediation \u2013 Co-Permittee since this option is only available for the current property owner, updated<br \/>\nthe language for the \u201cowner or operator of a small business\u201d choice to be \u201cat the location of the site\u201d<br \/>\n\u2013 Question 5 \u2013 bolded and underlined \u201cOriginal\u201d<\/li>\n<li>Addendum B:<br \/>\n\u2013 updated wording of checkbox below email address<br \/>\n\u2013 Question 2 \u2013 added examples of government entities, added charter school to public and private schools<br \/>\n\u2013 Question 6 \u2013 bolded and underlined \u201cOriginal\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.4 \u2013 5\/2\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.3 \u2013 5\/3\/2021<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.2 \u2013 10\/16\/2020<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section H: question 7 Added box for Surety Bond<\/li>\n<li>Addendum A: question 6 Added box for Surety Bond<\/li>\n<li>Addendum B: question 7 Added box for Surety Bond<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.1 \u2013 6\/17\/2019<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.0 \u2013 5\/30\/2019<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li style=\"color: green\">New form.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"1\" valign=\"top\"><a id=\"rap_modification\" name=\"rap_modification\"><\/a><a href=\"..\/#rap_modification\">RAP Technical Modification Application \u2013 Soil, Ground Water, and Indoor Air<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 2\/17\/2026<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"9\" valign=\"top\"><a id=\"rap_termination_gw\" name=\"rap_termination_gw\"><\/a><a href=\"..\/#rap_termination_gw\">Remedial Action Permit Termination Application \u2013 Ground Water<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.8 \u2013 6\/16\/2025<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated dates and fees<\/li>\n<li>Removed problematic signature fields to PDF<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.7 \u2013 6\/3\/2024<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated dates and fees<\/li>\n<li>Added date and signature fields to PDF<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.6 \u2013 6\/5\/2023<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update fees and program name<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.5 \u2013 1\/27\/2023<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update program name in header and on page 5.<\/li>\n<li>Section E: Added a check box for Vapor Intrusion Change in Use Evaluation Plan for Sub-Slab Soil Gas Contamination &gt; Residential Soil Gas Levels for Non-Residential<br \/>\nStructure.<\/li>\n<li>Section H: Added new question #3 to indicate if soil gas contamination is above the SGSLs beneath any buildings that required a Vapor Intrusion Change in Use<br \/>\nEvaluation Plan (i.e., SSSG &gt; NJDEP Residential SGSL for Non-Residential Structure) and renumbered questions after that.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.4 \u2013 6\/2\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update logo image and replaced \u201cand\u201d with ampersand<\/li>\n<li>Section B: updated note regarding fees at beginning of section<\/li>\n<li>Section C: updated wording of checkbox at bottom of section regarding the Primary Contact for Permit Compliance<\/li>\n<li>Section D: updated wording of checkbox at bottom of section regarding the Primary Contact for Permit Compliance<\/li>\n<li>Section E: added \u201cwith a summary report of the necessary documentation supporting the termination\u201d to the cover letter check box<\/li>\n<li>Addendum A: updated addendum to match changes made in section C<\/li>\n<li>Addendum B: updated addendum to match changes made in section D<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.3 \u2013 5\/2\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.2 \u2013 5\/3\/2021<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.1 \u2013 6\/17\/2019<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.0 \u2013 5\/30\/2019<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li style=\"color: green\">New form.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormNameIndented\" rowspan=\"3\" valign=\"top\"><a id=\"lsrp_supp_cert_soil_rap\" name=\"lsrp_supp_cert_soil_rap\"><\/a> <a href=\"..\/#lsrp_supp_cert_soil_rap\">LSRP Supplemental Certification For Initial Soil Remedial Action Permit (RAP) Application<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 2\/15\/2024<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li><a href=\"https:\/\/deptest.nj.gov\/srp\/wp-content\/uploads\/sites\/39\/lsrp_supplemental_cert_initial_soil_rap_app_changelog_1_2.pdf\" target=\"_blank\" rel=\"noopener\">Change Log<\/a> <span class=\"text-12\">[pdf]<\/span><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.1 \u2013 2\/9\/2024<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li><a href=\"https:\/\/deptest.nj.gov\/srp\/wp-content\/uploads\/sites\/39\/lsrp_supplemental_cert_initial_soil_rap_app_changelog.pdf\" target=\"_blank\" rel=\"noopener\">Change Log<\/a> <span class=\"text-12\">[pdf]<\/span><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.0 \u2013 1\/31\/2024<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li style=\"color: green\">New form.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"10\" valign=\"top\"><a id=\"rap_modification_soil\" name=\"rap_modification_soil\"><\/a><a href=\"..\/#rap_modification_soil\">Remedial Action Permit Modification Application \u2013 Soil<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.9 \u2013 6\/16\/2025<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated dates and fees<\/li>\n<li>Removed problematic signature fields to PDF<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.8 \u2013 6\/3\/2024<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated dates and fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.7 \u2013 6\/5\/2023<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update fees and program name<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.6 \u2013 1\/27\/2023<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update program name in header and on page 9.<\/li>\n<li>Section J: Question 2 \u2013 changed \u201csoil gas\u201d to \u201csub-slab soil gas\u201d, added \u201cNJDEP\u2019s\u201d, added \u201cor a VI Change in Use Evaluation Plan, or both\u201d. Removed \u201cprovide<br \/>\nlocation in report\u201d and added 3 checkboxes to clearly indicate the scenario for the sub-slab soil gas contamination remaining beneath any building. Expanded<br \/>\ninstructions after question 2.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.5 \u2013 6\/2\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update logo image and replaced \u201cand\u201d with ampersand<\/li>\n<li>Section B: updated note regarding fees at beginning of section<\/li>\n<li>Section D: updated wording of checkbox at bottom of section regarding the Primary Contact for Permit Compliance<\/li>\n<li>Section E: updated wording of checkbox at bottom of section regarding the Primary Contact for Permit Compliance<\/li>\n<li>Section F: bolded and underlined \u201cOriginal\u201d<\/li>\n<li>Section G: Question 11 \u2013 added \u201cremaining\u201d to the wording of question and renamed column headings and added two more columns for inhalation exposure pathway<\/li>\n<li>Section I:<br \/>\n\u2013 Question 2 \u2013 added examples of government entities, added charter school to public and private schools, removed \u201cowner or operator of a small business\u201d box as a<br \/>\nchoice for the Person Responsible for Conducting the Remediation \u2013 Co-Permittee since this option is only available for the current property owner, updated the<br \/>\nlanguage for the \u201cowner or operator of a small business\u201d choice to be \u201cat the location of the site\u201d<br \/>\n\u2013 Question 6 \u2013 bolded and underlined \u201cOriginal\u201d<\/li>\n<li>Addendum A: updated addendum to match changes made in sections D and I<\/li>\n<li>Addendum B: updated addendum to match changes made in sections E and I<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.4 \u2013 5\/2\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.3 \u2013 5\/3\/2021<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.2 \u2013 10\/16\/2020<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section I: question 7 Added box for Surety Bond<\/li>\n<li>Addendum A: question 6 Added box for Surety Bond<\/li>\n<li>Addendum B: question 7 Added box for Surety Bond<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.1 \u2013 6\/17\/2019<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.0 \u2013 5\/30\/2019<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li style=\"color: green\">New form.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"8\" valign=\"top\"><a id=\"rap_termination_soil\" name=\"rap_termination_soil\"><\/a><a href=\"..\/#rap_termination_soil\">Remedial Action Permit Termination Application \u2013 Soil<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.7 \u2013 6\/16\/2025<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated dates and fees<\/li>\n<li>Removed problematic signature fields to PDF<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.6 \u2013 6\/3\/2024<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated dates and fees<\/li>\n<li>Added date and signature fields to PDF<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.5 \u2013 6\/5\/2023<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update fees and program name<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.4 \u2013 6\/2\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update logo image and replaced \u201cand\u201d with ampersand<\/li>\n<li>Section B: updated note regarding fees at beginning of section<\/li>\n<li>Section C: updated wording of checkbox at bottom of section regarding the Primary Contact for Permit Compliance<\/li>\n<li>Section D: updated wording of checkbox at bottom of section regarding the Primary Contact for Permit Compliance<\/li>\n<li>Addendum A: updated addendum to match changes made in section C<\/li>\n<li>Addendum B: updated addendum to match changes made in section D<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.3 \u2013 5\/2\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.2 \u2013 5\/3\/2021<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.1 \u2013 6\/17\/2019<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.0 \u2013 5\/30\/2019<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li style=\"color: green\">New form.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormNameIndented\" valign=\"top\"><a id=\"ra_prot_bicert\" name=\"ra_prot_bicert\"><\/a><a href=\"..\/#ra_prot_bicert\">Remedial Action Protectiveness \/ Biennial Certification Form<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 3\/27\/2026<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"16\" valign=\"top\"><a id=\"ra_protcert_gw\" name=\"ra_protcert_gw\"><\/a><a href=\"..\/#ra_protcert_gw\">Remedial Action Protectiveness\/Biennial Certification Form \u2013 Ground Water<\/a><\/p>\n<p class=\"name_change\">(Was \u201cRemedial Action Protectiveness Certification Form \u2013 Ground Water\u201d)<\/p>\n<\/td>\n<td valign=\"top\">2.4 \u2013 6\/16\/2025<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated dates and fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.3 \u2013 6\/3\/2024<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated dates and fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.2 \u2013 6\/5\/2023<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update fees and program name<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.1 \u2013 6\/27\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated program name in header.<\/li>\n<li>Section F: Updated language on the 2 checkboxes that begin with \u201cAny vapor intrusion sampling results as required\u2026\u201d to provide a scaled site map.<\/li>\n<li>Section J:<br \/>\n\u2013 Question 4 \u2013 changed \u201cSub Slab Depressurization System\u201d to \u201cSubsurface Depressurization System\u201d and removed the active\/passive checkboxes. Changed \u201cSub Slab<br \/>\nVentilation System\u201d to \u201cSubsurface Ventilation System\u201d. Added new checkbox for \u201cHVAC Positive Pressure.\u201d<br \/>\n\u2013 Question 5 \u2013 changed \u201csoil gas\u201d to \u201csub-slab soil gas\u201d, added \u201cNJDEP\u2019s\u201d, added \u201cor a VI Change in Use Evaluation Plan, or both\u201d to question. Added 3 checkboxes<br \/>\nto clearly indicate the scenario for the sub-slab soil gas contamination remaining beneath any building and a second question \u201cIf \u201cYes\u201d, have annual inspections been<br \/>\ncompleted to determine if building conditions have changed and\/or there has been a change in the use.\u201d Updated the Note to match edits in the question.<br \/>\n\u2013 Question 6 \u2013 changed \u201cdetermine change in use\u201d to \u201cdetermine if there has been a change in the use.\u201d<\/li>\n<li>Section M:<br \/>\n\u2013 Changed heading of section from \u201cPerson With Primary Responsibility\u201d to \u201cPerson With Primary Contact\u201d<br \/>\n\u2013 Updated program name in address below section.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.0 \u2013 5\/2\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated fees for post NFA cases<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.9 \u2013 5\/27\/2021<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li><a href=\"https:\/\/deptest.nj.gov\/srp\/wp-content\/uploads\/sites\/39\/rem_action_prot_cert_gw_changelog.pdf\" target=\"_blank\" rel=\"noopener\">Change log<\/a> <span class=\"text-12\">[pdf]<\/span><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.8 \u2013 9\/17\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.7 \u2013 6\/5\/2017<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Changed all instances of citation in form and instructions from N.J.A.C. 7:26C-7.8(d)2 to N.J.A.C. 7:26C-7.9(d)2<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.6 \u2013 6\/9\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section A: All questions about CEA moved to Section G.<\/li>\n<li>Section B: Billing contact info made into Section C.<\/li>\n<li>Added \u201cChanged Since Last Submission\u201d and \u201cEffective Date of Change\u201d to Sections C,D, E, and F.<br \/>\nAdded \u201cIf same as Person Responsible\u2026\u201d to Sections D, E, and F.<\/li>\n<li>Old Section F \u201cIEC Conditions\u201d removed.<\/li>\n<li>Section G, H, and M combined into New Section G \u201cRemedial Action and CEA\/WRA Information\u201d, questions from Section A placed here.<\/li>\n<li>Section I. Property Use and Section L. Land Use Disturbances combined into \u201cSection H. Land Use, Changes, And Disturbances\u201d;<br \/>\nSeparated \u201cSchool\u201d and \u201cChild Care Facility\u201d and added \u201cRoad Right of Way\u201d to questions 1,2, and 3.<\/li>\n<li>Section I \u201cCurrent or Planned Water Use\u2026\u201d (Old J): Added Community and Non-Community Supply Well to question 6.<\/li>\n<li>Section J. Vapor Intrusion: Added question 7 about vapor intrusion engineering controls.<\/li>\n<li>Old Section N. \u201cAdditional Remediation and Required Submittals\u201d: Removed.<\/li>\n<li>Two new sections added: Section K. Financial Assurance, and Section M. Subsurface Evaluator Information and Statement.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.5 \u2013 10\/5\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Fixed defect in Section E. Email address entry box.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.4 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed Non-LSRP and Subsurface Evaluator certification pages.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.3 \u2013 3\/8\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Form<br \/>\nRemoved format restrictions for zip codes<\/li>\n<li>Section A: renumbered questions<\/li>\n<li>Section G: Question 2 \u2013 changed If \u201cYes\u201d to If \u201cNo\u201d<\/li>\n<li>Section N: Question 1 \u2013 changed \u201cF,H,I,J,K\u201d to \u201cF,G,I,J,K\u201d<br \/>\nQuestion 3 \u2013 changed \u201cCheck here if the answer to question 2<br \/>\nin<br \/>\nsection G was answered \u201cYes\u201d to<br \/>\n\u201cCheck here if the answer to question 2 in section G<br \/>\nwas answered \u201cNo\u201d<\/li>\n<li>Instructions<br \/>\nChanged all instances of \u201cDepartment\u201d to \u201cNJDEP\u201d<\/li>\n<li>Fixed incorrect section references within instructions<\/li>\n<li>General: Added address for Initial Notice<br \/>\nAdded \u201cGIS compatible maps shall be submitted as per instructions<br \/>\nfound at<br \/>\nhttps:\/\/www.nj.gov\/dep\/srp\/gis to srpgis_cea@deptest.nj.gov.\u201d<br \/>\nto Regulatory Requirements<\/li>\n<li>Section A: Added names of fields to bullet items<br \/>\nRenumbered questions<\/li>\n<li>Section J: Updated GIS links<\/li>\n<li>Section O: Added instruction explaining this section is not<br \/>\nto be signed by the LSRP or lawyer<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.2 \u2013<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added Section B \u2013 Fees<\/li>\n<li>Added certification pages for Non-LSRP and Subsurface Evaluator<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.1 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">0.1 \u2013 3\/4\/2011 <span class=\"infoNote\">Draft<\/span><\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">0.0 \u2013 1\/12\/2011 <span class=\"infoNote\">Draft<\/span><\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"13\" valign=\"top\"><a id=\"ra_protcert_soils\" name=\"ra_protcert_soils\"><\/a><a href=\"..\/#ra_protcert_soils\">Remedial Action Protectiveness\/Biennial Certification Form \u2013 Soil<\/a><\/p>\n<p class=\"name_change\">(Was \u201cRemedial Action Protectiveness Certification Form \u2013 Soils\u201d)<\/p>\n<\/td>\n<td valign=\"top\">2.4 \u2013 6\/16\/2025<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated dates and fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.3 \u2013 6\/3\/2024<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated dates and fees<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.2 \u2013 6\/5\/2023<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update fees and program name<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.1 \u2013 6\/27\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated program name in header.<\/li>\n<li>Section I:<br \/>\n\u2013 Question 4 \u2013 changed \u201cSub Slab Depressurization System\u201d to \u201cSubsurface Depressurization System\u201d and removed the active\/passive checkboxes. Changed \u201cSub Slab<br \/>\nVentilation System\u201d to \u201cSubsurface Ventilation System.\u201d Added new checkbox for \u201cHVAC Positive Pressure.\u201d<br \/>\n\u2013 Question 5 \u2013 changed \u201csoil gas\u201d to \u201csub-slab soil gas\u201d, added \u201cNJDEP\u2019s\u201d, added \u201cor a VI Change in Use Evaluation Plan, or both\u201d to question. Added 3 checkboxes to<br \/>\nclearly indicate the scenario for the sub-slab soil gas contamination remaining beneath any building and a second question \u201cIf \u201cYes\u201d, have annual inspections been<br \/>\ncompleted to determine if building conditions have changed and\/or there has been a change in the use.\u201d Updated the Note to match edits in the question.<br \/>\n\u2013 Question 6 \u2013 changed \u201cdetermine change in use\u201d to \u201cdetermine if there has been a change in the use.\u201d<\/li>\n<li>Section L:<br \/>\n\u2013 Changed heading of section from \u201cPerson With Primary Responsibility\u201d to \u201cPerson With Primary Contact.\u201d<br \/>\n\u2013 Question 5 \u2013 Changed \u201cThis certification shall be signed by the person responsible for submitting the Soil Remedial Action Protectiveness\/Biennial Certification<br \/>\nForm\u201d to \u201cThis certification shall be signed by the person with primary contact for permit compliance\/person responsible for monitoring the protectiveness of the<br \/>\nremedial action.\u201d<br \/>\n\u2013 Updated program name in address below section.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.0 \u2013 5\/2\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update fee for post NFA cases<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.9 \u2013 5\/27\/2021<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li><a href=\"https:\/\/deptest.nj.gov\/srp\/wp-content\/uploads\/sites\/39\/rem_action_prot_cert_soil_changelog.pdf\" target=\"_blank\" rel=\"noopener\">Change log<\/a> <span class=\"text-12\">[pdf]<\/span><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.8 \u2013 9\/17\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.7 \u2013 6\/9\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section A: All questions about deed notice moved to Section G. Deed Notice Info.<\/li>\n<li>Section B: Billing contact info made into Section C.<\/li>\n<li>Added \u201cChanged Since Last Submission\u201d and \u201cEffective Date of Change\u201d to Sections C,D, E, and F.<br \/>\nAdded \u201cIf same as Person Responsible\u2026\u201d to Sections D, E, and F.<\/li>\n<li>Old Section F \u201cIEC Conditions\u201d removed.<\/li>\n<li>Section G changed to \u201cDeed Notice\/ DER Info\u201d, questions from Section A placed here<\/li>\n<li>Section H. Property Use and Section I. Land Use Disturbances combined into \u201cSection H. Land Use, Changes, And Disturbances\u201d,<br \/>\nSeparated \u201cSchool\u201d and \u201cChild Care Facility\u201d and added \u201cRoad Right of Way\u201d to questions 1,2, and 3.<br \/>\nRemoved \u201cFuture Site Use Unknown\u201d from question 2.<br \/>\nAdded \u201cOther\u201d to question 3.<br \/>\nMost of the remaining questions have been rewritten.<\/li>\n<li>Old Section J \u201cAdditional Remediation\u201d removed<\/li>\n<li>Three new sections added: Section I. Vapor Intrusion, Section J. Financial Assurance, and Section L. Subsurface Evaluator Information and Statement.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.6 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed Non-LSRP and Subsurface Evaluator certification pages.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.5 \u2013 3\/8\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated GIS links in Instructions, Sections A.4 and J.1<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.3 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 3\/4\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 1\/12\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Grammar &amp; punctuation, Regulatory requirements noted in<br \/>\nGeneral Instructions #2 and Section I<\/li>\n<li>Section B: Checkbox if Current Owner has changed since last<br \/>\nsubmittal,<\/li>\n<li>Section K: LSRP Signature Page added<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"8\" valign=\"top\"><a id=\"rir\" name=\"rir\"><\/a><a href=\"..\/#rir\">Remedial<br \/>\nInvestigation Report form<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.1 \u2013 4\/1\/15<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Split into 2 forms. Common sections and certifications in the key document forms were moved into a new cover form called the Cover\/Certification Form.<br \/>\nThe following sections were moved: A \u2013 Site Information; B \u2013 Submission Status; C \u2013 Site Use; D \u2013 Case Type; E \u2013 Public Funds; and certifications for the Person<br \/>\nResponsible and LSRP.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.0 \u2013 6\/9\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Sec A: Gave Case Tracking Number a full line and added \u201cfor this submission\u201d.<\/li>\n<li>Sec B Submission Status:<br \/>\nChanged title from \u201cSubmittal\u201d to \u201cSubmission\u201d.<br \/>\nQuestion 4: sorted list alphabetically, split RI\/RAW into two lines, added column named \u201cDate of Previous NJDEP Approval\u201d.<\/li>\n<li>Sec C Site Use: Added \u201cOther\u201d to Intended Future Use.<\/li>\n<li>Sec D Case type:<br \/>\nAdded \u201cOther\u201d<br \/>\nRemoved \u201cTSCA\u201d and \u201cOther\u201d from Federal Case types.<br \/>\nAdded Question 1 \u201cIs the party conducting remediation a government entity?\u201d<\/li>\n<li>Sec E Public Funds: Added \u201cEnvironmental Infrastructure Trust\u201d.<\/li>\n<li>Sec G General (new): Moved questions from old section \u201cAlternative Standard \/ Variances\u201d here.<\/li>\n<li>Sec H Site Conditions: Removed old questions 1, 2, and 3.<br \/>\nOld question 4 moved to new Section G.<br \/>\nNew questions added about radiological, ordinance, free product, sediment, and ENSRs.<\/li>\n<li>Sect H Applicable STDs:<br \/>\nQuestion 2 \u2013 Changed \u201ccompliance with a pathway\u201d to \u201ccompliance with the Soil Remediation Standards\u201d.<br \/>\nAdded new question 4: \u201cWas an interim standard used\u2026\u201d.<br \/>\nQuestion 7 removed \u201cImmobile Chemicals List\u201d and \u201cSoil and Ground Water Analytical Data Evaluation\u201d choices.<\/li>\n<li>Sec J Alt STDs: Section removed (questions moved to section G).<\/li>\n<li>Sec K Historic Fill: Questions 1 and 3 combined and reworded.<\/li>\n<li>Sec O Misc: Question 7 moved to section G.<\/li>\n<li>Sec P Lab Data: Moved to after Section O Miscellaneous.<br \/>\nQuestion 6 changed from comments area to \u201cProvide the page number\u2026\u201d.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.7 \u2013 3\/25\/2013<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B Submittal Status:<br \/>\n\u2013 Added question for method of EDD submittal.<br \/>\n\u2013 Added question to ask if a CEA proposal included.<br \/>\n\u2013 Added technical Impracticability Determination to the list.<\/li>\n<li>Section D Case Type: Added new Section D: Case Type.<\/li>\n<li>Section G Site Conditions:<br \/>\nAdded new Question 1: \u201cHas dioxin been detected in any site media\u201d;<br \/>\nRemoved dioxin from table in Question 2; Changed \u201ccompound\/element\u201d<br \/>\nto \u201ccontaminant\u201d in Question 3; Added \u201cscreening level\u201d to questions 3 and 4,<br \/>\nAdded ESNRs to GW and Soil columns in Question 5;<\/li>\n<li>Section H Applicable STDs:<br \/>\n\u2013 Changed \u201ccompounds\u201d to \u201ccontaminants\u201d in Question 1.<br \/>\n\u2013 Added table of compliance averaging methods to question 2.<\/li>\n<li>Section I Background Conditions: Updated citations.<\/li>\n<li>Section J Alt STD: Added \u201cecological site specific goal\u201d.<\/li>\n<li>Section K Historic Fill: Updated wording of questions 1 and 2, combined questions 3 and 4, and updated instructions.<\/li>\n<li>Section I GW Trigger: Updated citations.<\/li>\n<li>Section M GW RI Info: Question 3.b. changed reference from Tech Regs to Guidance Document.<\/li>\n<li>Section N Eco Receptors: Updated citation in question 4.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.6 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>General Instructions: Modified instructions for submission<br \/>\nof RE forms and Case Inventory Documents (CID) Removed Non-LSRP<br \/>\nand Subsurface Evaluator certification pages.<\/li>\n<li>Section B: added radionuclide reports list.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.5 \u2013 1\/10\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>General: Removed format restrictions for zip codes<\/li>\n<li>Section A: Changed citation for \u201cDate Remediation Initiated\u201d<\/li>\n<li>Section B: Changed title to \u201cSubmittal Status\u201d, updated Alternate<br \/>\nStandard form name, replaced Annual Fee form with Public Notification<br \/>\nForm, and added withdrawal column<\/li>\n<li>Section E: small wording changes, expanded question about<br \/>\nnumber of AOCs to identify total AOCs for the site and total<br \/>\nAOCs addressed in submittal<\/li>\n<li>Section G: Check boxes reworded to yes\/no questions<\/li>\n<li>Section I: changed the word \u201cdeviation\u201d to \u201cvariance\u201d through<br \/>\nout section<\/li>\n<li>Section K: added Question 2 \u201cIs contamination in soils fully<br \/>\ndelineated?\u201d<\/li>\n<li>Section L: added Question 4 \u201cIs contamination in ground water<br \/>\nfully delineated?\u201d<\/li>\n<li>Section M: added new section- Ecological Receptors<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.4 \u2013 9\/7\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">Form<\/p>\n<ul>\n<li>Section A: Removed Mailing Address line<\/li>\n<li>Section B: Added more space for Permit Application List.<\/li>\n<li>Section E: Removed instruction to attach Section H2 of the<br \/>\nPA\/SI form. Added space RI complete date and space for number<br \/>\nof contaminated AOCs.<\/li>\n<li>Section F: Question 1 added \u201cat the time of remedial<br \/>\ninvestigation\u201d Question 4 \u2013 removed \u201cCo-mingled<br \/>\non-site ground water plumes\u201d and \u201cCo-mingled ground<br \/>\nwater plumes from both on-site and off site sources\u201d. Added<br \/>\n\u201cBackground ground water contamination\u201d.<\/li>\n<li>Section G: Added \u201cDAF Modification\u201d, \u201cImmobile<br \/>\nChemicals List\u201d, \u201cSoil and Ground Water Analytical<br \/>\n\u201cData Evaluation\u201d.<\/li>\n<li>Section H: Removed question 1.<\/li>\n<li>Section L: Rewritten, expanded to 3 questions plus 4 sub questions.<\/li>\n<li>Section M: Removed question 6 about clean fill.<\/li>\n<li>Section N: Changed question 2. to 1a. Added new questions:<br \/>\n2. (were additional AOCs ID), 5. (Has clean fill has been brought<br \/>\nonto the site), and 7. (Have past deficiencies\/notice of deficiencies<br \/>\nbeen addressed).<\/li>\n<li>Section P: Removed first section of sub surface evaluator<br \/>\ncertification.<\/li>\n<\/ul>\n<p>Instructions<\/p>\n<ul>\n<li>Changed all instances of \u201cDepartment\u201d to \u201cNJDEP\u201d<br \/>\nChanged mailing address<\/li>\n<li>Section A: Added examples of NJDEP site ID numbers. Removed<br \/>\nmailing address only instruction<\/li>\n<li>Section B: Added Remedial Action Report<\/li>\n<li>Section E: Removed instruction to attach Section H2 of the<br \/>\nPA\/SI form. Added note that PA\/SI is required for \u201centire<br \/>\nsite\u201d option. Added requirement to identify All AOCs individually.<\/li>\n<li>Section H: Removed question 1, renumbered questions 2a and<br \/>\n2b to 1 and 2.<\/li>\n<li>Section I: Spell out Vapor Intrusion and Johnson &amp; Ettinger.<\/li>\n<li>Section L: Rewritten to match new questions.<\/li>\n<li>Section M: Removed question 6 about clean fill.<\/li>\n<li>Section N: Renumbered item 2 to item 1a. added new items 2,<br \/>\n5, and 7. Fixed link for list of regulated USTs<\/li>\n<li>Section P: Removed first 3 bullet items in Subsurface Cert.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 3\/4\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 1\/12\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Grammar &amp; punctuation<\/li>\n<li>Section O: Developer Certification removed<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"7\" valign=\"top\"><a id=\"rir_online\" name=\"rir_online\"><\/a><a href=\"..\/#rir_online\">Remedial Investigation Report Service \u2013 Online<\/a><\/td>\n<td valign=\"top\">1.6 \u2013 2\/22\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated Logo<\/li>\n<li>Updated compatibility information for Internet browsers<\/li>\n<li>Under 1. Files you will need (minimum):<br \/>\n\u2013 In a), added sentence to indicate RE not required if an Unrestricted Use RAO is issued within one year.<br \/>\n\u2013 In b), changed \u201cversion 1.2 or later only\u201d to \u201cuse the latest version available\u201d<\/li>\n<li>Under 13. Attachment Upload. Updated instructions concerning submission of RE<\/li>\n<li>Updated the instructions for certification<\/li>\n<li>Updated portal comments link<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.5 \u2013 1\/15\/2020<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added 4 questions about emerging contaminants after RI Details Scope.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.4 \u2013 2\/27\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated broken hyperlinks in Section 12C of the instructions.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 8\/21\/2017<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated Instructions<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 4\/4\/2016<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added Java instructions to avoid certificate errors<\/li>\n<li>Page 5 item 10:. Expanded CID Upload Confirmation instructions<\/li>\n<li>Changed RIR Details Primary to RIR Submission Scope<\/li>\n<li>Added: Indicate if the remediation used public funds.<\/li>\n<li>Removed: Indicate if historic fill is present<\/li>\n<li>13. Attachment Upload: moved \u2018EDD\u2019 in first sentence, changed 30 days to 14 days<\/li>\n<li>14. Reworded last sentences in c) and e)<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 10\/20\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Last sentence of first paragraph: Added \u201c\u2026used in proposing and establishing a ground water classification exception area (CEA) and\u2026\u201d<\/li>\n<li>Page 2, 1.a.: Added \u201c, and their associated instructions\u201d<\/li>\n<li>Page 2, 1.f.i.: Added Exhibit A, Exhibit B, and List of Names<\/li>\n<li>Page 2, 1.f.: Added \u201cNOTE: Submit Exhibit C (GIS Deliverables \u2013 CEA map) only as indicated in the CEA form instructions.\u201d<\/li>\n<li>Item 12: Completely rewritten<\/li>\n<li>Item 13: Content added<\/li>\n<li>Item 14: Added \u201cRIR\u201d to title, e) Rewrote second sentence<\/li>\n<li>Item 15: numbered list (a,b,c)<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 4\/1\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li style=\"color: green\">New Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"4\" valign=\"top\"><a id=\"timeframe_notification\" name=\"timeframe_notification\"><\/a><a href=\"..\/#timeframe_notification\">Remedial<br \/>\nTimeFrame Notification<\/a><\/td>\n<td valign=\"top\">1.3 \u2013 9\/17\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 10\/23\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added third checkbox at top of form for Contaminated Media Notification<\/li>\n<li>Section A: Gave \u201cCase Tracking Numbers\u201d a full line<\/li>\n<li>Section C:<br \/>\nReduced list of reports and changed Columns headings<br \/>\nAdded note to question 2 under Justification<br \/>\nRemoved question 4 under Justification<\/li>\n<li>Section D: Added new section \u201cContaminated Media Notification\u201d<\/li>\n<li>Section E: Added \u201cComplete this section only if you are lengthening the RI Reg Timeframe\u201d<\/li>\n<li>Instructions updated<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 5\/5\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Fixed broken field in Section D, question 2.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li style=\"color: green\">New Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"4\" valign=\"top\"><a id=\"remcost_review\" name=\"remcost_review\"><\/a><a href=\"..\/#remcost_review\">Remediation<br \/>\nCost Review\/Estimate form<\/a><\/td>\n<td valign=\"top\">1.1 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 3\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Form finalized<\/li>\n<li>Sec. F, item 5 removed<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">0.2 \u2013 3\/4\/2011 <span class=\"infoNote\">Draft<\/span><\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">0.1 \u2013 1\/12\/2011 <span class=\"infoNote\">Draft<\/span><\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>DEP Oversight checkbox added to top of form,<\/li>\n<li>Section C: additional checkbox<\/li>\n<li>Section D: more Mechanisms added<\/li>\n<li>Section I: new signature page for person establishing and<br \/>\nmaintaining a remediation funding source added, 30 calendar<br \/>\ndays after disbursement to submit, &amp; shall not include ineligible<br \/>\nlegal costs\/legal fees on 3 signature pages<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"15\" valign=\"top\"><a id=\"rfs\" name=\"rfs\"><\/a><a href=\"..\/#rfs\">Remediation Cost Review and RFS-FA Form<\/a><\/p>\n<p style=\"font-size: 9px;font-style: italic\">Formerly called: \u201cRemediation Funding Source \u2013 Self Guarantee Form\u201d or \u201cRemediation Funding Source Form\u201d<\/p>\n<\/td>\n<td valign=\"top\">2.2 \u2013 9\/23\/2020<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section D: Added surety bond to both lists<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.1 \u2013 9\/17\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">2.0 \u2013 2\/14\/2017<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">Form<\/p>\n<ul>\n<li>Section B:<br \/>\n\u2013 Removed information and parenthesis following \u201cEnvironmental Opportunity Zone\u201d and \u201cInnovative Remedial Action Technology\u201d check boxes<br \/>\n\u2013 Added additional exemption information to \u201cNOTE\u201d box.<\/li>\n<li>Section E: Added additional supporting information to \u201cSurrogate Cost\u201d<\/li>\n<li>Section K:<br \/>\n-Added \u201cand Waste Management\u201d to Completed forms should be sent to:<br \/>\n-Removed \u201cSubsurface Evaluator Information and Statement\u201d<\/li>\n<\/ul>\n<p>Instructions<\/p>\n<ul>\n<li>Added information supporting RFS Exemption Guidance<\/li>\n<li>Added information to define \u201cSurrogate Cost\u201d<\/li>\n<li>Removed sections referencing \u201cSubsurface Evaluator\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.9 \u2013 4\/21\/2016<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B: added billing contact<\/li>\n<li>Section C: added \u201cInitial Direct Oversight Cost Review\u201d<\/li>\n<li>Section E: removed question 3 \u201cHas a remediation Funding Source been established.\u201d<\/li>\n<li>Section F: question 1.b. and c. removed \u201cor to complete the remedial investigation as applicable\u201d<\/li>\n<li>Section G: question 3. Changed \u201cFor Letters of Credit and Environmental Insurance Policies\u201d to \u201cFor NJDEP authorized reductions\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.8 \u2013 4\/16\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Instructions<br \/>\nSection C: Removed the requirement to complete Section E \u2013 Remediation Cost Estimation for the following categories: Remediation Funding Source Disbursement<br \/>\nNotification pursuant to N.J.A.C. 7:26C-5.12(a); Remediation Funding Source Disbursement Request pursuant to N.J.A.C. 7:26C-5.12(b)-Direct Oversight; Remediation<br \/>\nFunding Source\/Financial Assurance Disbursement Request pursuant to N.J.A.C. 7:26C-5.13(d) \u2013 Department held RFS\/FA<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.7 \u2013 1\/29\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Sect A: Added \u201cor RFS Number(s)\u201d to \u201cProgram Interest (PI)\u201d line<\/li>\n<li>Sect B:<br \/>\nRemoved:<br \/>\n\u2013 \u201cAttach additional sheets to name each person responsible for conducting the remediation\u2026\u201d<br \/>\n\u2013 \u201cI am submitting a General Information Notice (GIN) with this form\u201d<br \/>\n\u2013 \u201cThis site is in Direct Oversight pursuant to\u2026\u201d- Added \u201cand notice of Municipal approval\u201d to first checkbox under exemption<\/li>\n<li>Sect C:<br \/>\n\u2013 Changed Name of Section from \u201cPurpose of Cost Review\/Estimate\u201d to \u201cPurpose of Submission\u201d<br \/>\n\u2013 Added: \u201cInitial Direct Oversight Remediation Trust Fund Agreement\u201d- Split \u201cRemediation Funding Source Disbursement\u201d into 3 choices:<br \/>\n\u2013 RFS Disbursement Notification<br \/>\n\u2013 RFS Disbursement Request \u2013 Direct Oversight only<br \/>\n\u2013 RFS Disbursement Request \u2013 Department held RFS\/FA\u2013 Removed:<br \/>\n\u2013 \u201cEstablishing any type of Remediation Funding Source for the May 2014 Remedial Investigation extension\u201d<br \/>\n\u2013 \u201cEstablishing a Remediation Trust Fund for the May 2014 Remedial Investigation extension pursuant to P.L. 2013, c. 283\u201d\u2013 Added 1% surcharge language to initial RFS and DO RTF.<\/li>\n<li>Sect D:<br \/>\n\u2013 Under \u201cReplacement Mechanism\u201d removed lines to provide name of lender<br \/>\n\u2013 Reworded question 2<br \/>\n\u2013 Added \u201cDisburse\u201d to question 3<\/li>\n<li>Sect E:<br \/>\n\u2013 Under \u201cSurrogate Cost\u201d removed \u201cfrom NJDEP Guidance\u201d, added \u201c(applicable to ISRA Remediation Certifications)\u201d<br \/>\n\u2013 Reworded question 3<\/li>\n<li>Sect G:<br \/>\n\u2013 Split into 2 Sections. Questions 1 to 3 in Section G, questions 4 to 6 in Section H<br \/>\n\u2013 Question 1 changed \u201cdisbursement request\u201d to \u201cnotification\/request\u201d<br \/>\n\u2013 Question 2.a. added \u201c(Attach copy of authorization)\u201d<br \/>\n\u2013 Added question 2.d. \u201cAmount of RFS remaining after disbursement\u201d<br \/>\n\u2013 Removed question 3.c. \u201cProvide the name and address of the party to receive payment from this disbursement\u201d<\/li>\n<li>Sect H: (new)<br \/>\n\u2013 \u201cRequest for NJDEP Authorized Disbursements\u201d<br \/>\n\u2013 Added question 1: \u201cTotal amount of requested disbursement\u201d<br \/>\n\u2013 Expanded explanation in question 3 (old question 5)<\/li>\n<li>Instructions<br \/>\n\u2013 Significant changes; see comparison document<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.6 \u2013 2\/7\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Sect C:<br \/>\n\u2013 Added checkbox for \u201cEstablishing any type of Remediation Funding Source\u201d<br \/>\n\u2013 Added checkbox for \u201cEstablishing a Remediation Trust Fund for the May 2014 Remedial Investigation extension\u201d<br \/>\n\u2013 Removed checkbox for \u201cCost Estimate Guidance which can be found on the Department\u2019s Website\u201d<\/li>\n<li>Sect E: Added new question 3 \u201cIf establishing a RTF \u2026, the estimated cost to complete the remedial investigation\u201d<\/li>\n<li>Sect F:<br \/>\n\u2013 Question 1.b. added \u201cor to complete the remedial investigation as applicable\u201d<br \/>\n\u2013 Question 1.c. added \u201cor to complete the remedial investigation as applicable\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.5 \u2013 5\/6\/2013<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added subsurface and LSRP check boxes on front<\/li>\n<li>Section B:<br \/>\n\u2013 Added question about submitting GIN<br \/>\n\u2013 Added question asking if site is in Direct Oversight<br \/>\n\u2013 Added \u201cFor RFS Only (not FA)\u201d notice for exemption question<br \/>\n\u2013 Added Note at bottom of section<\/li>\n<li>Section C:<br \/>\n\u2013 Added \u201ccheck all that apply\u201d<br \/>\n\u2013 Removed instructions to attach instrument for first two items<br \/>\n\u2013 Added \u201cBiennial Cost Review\u201d and \u201cUsing RFS as FA\u201d to list<\/li>\n<li>Section D: Added question 3 about changing the amount of FA<\/li>\n<li>Section E: Added estimated cost for FA<\/li>\n<li>Section F: Renamed Section, added three questions about FA<\/li>\n<li>Section G: Expanded question 2 into 3 questions and added new question 3<\/li>\n<li>Section J: Added subsurface evaluator Cert<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.4 \u2013 11\/14\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B: Added a list of possible exemptions from the requirement<br \/>\nto post RFS.<\/li>\n<li>Section D: Added boxes to indicate if the mechanism is for<br \/>\na RFS or RA for both initial and replacement mechanisms.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.3 \u2013 7\/23\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed options for Non-LSRP and DEP Oversight certification<\/li>\n<li>Removed \u201cNo Changes Since Last Submittal\u201d on all certifications<\/li>\n<li>Section B: Added instructions to attach additional sheets<br \/>\nif needed<\/li>\n<li>Section C: \u2013 Added box for \u201cChange in Remediation Funding<br \/>\nSource or Financial Assurance Mechanism\u201d \u2013 Removed contact<br \/>\ninformation for person who prepared cost estimate<\/li>\n<li>Section D: \u2013 Renamed \u201cCurrent Mechanism\u201d to \u201cInitial<br \/>\nor Existing Mechanism\u201d \u2013 Added spaces in Replacement Mechanism<br \/>\nto indicate provider (lender) for each choice \u2013 Removed<br \/>\nquestions 2 through 5 \u2013 Added new question 2 for \u201cAmount<br \/>\nof remediation funding source or financial assurance posted\u201d<\/li>\n<li>Section E: \u2013 Provided link for cost estimate guidance<br \/>\n\u2013 Added \u201cEstimated cost to complete remediation\u201d and \u201cFull legal<br \/>\nname of person who prepared the cost estimate\u201d<\/li>\n<li>Section G: Removed \u201cEstimated remaining costs to complete<br \/>\nthe remediation\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.2 \u2013 9\/7\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Changed name from: \u201cRemediation Cost Review Estimate<br \/>\nVer 1.1\u201d to \u201cRemediation Cost Review and RFS-FA Form<br \/>\nVer 1.2\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.1 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 3\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Form finalized<\/li>\n<li>Sec. B, item 3 added: Name of entity that entered into the<br \/>\noversight document<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">0.1 \u2013 3\/4\/2011 <span class=\"infoNote\">Draft<\/span><\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">0.0 \u2013 1\/12\/2011 <span class=\"infoNote\">Draft<\/span><\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormNameIndented\" rowspan=\"2\" valign=\"top\" height=\"126\"><a id=\"rfs_self_guarantee\" name=\"rfs_self_guarantee\"><\/a><a href=\"..\/#rfs_self_guarantee\"><br \/>\nSelf Guarantee Application<\/a><\/td>\n<td valign=\"top\">1.3 \u2013 6\/12\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated definition of \u201cGross Payment\u201d in instructions to include impairment charges.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 5\/22\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B: Removed RP contact information, added separate<br \/>\ndate and name for each document\/authority choice<\/li>\n<li>Section C: Added Special Purpose entity<br \/>\nRemoved \u201cDirect\u201d from \u201cDirect Parent Company\u201d<br \/>\nthroughout form and instructions<\/li>\n<li>Section F: Added \u201cIntangible Assets\u201d and \u201cTangible<br \/>\nNet Worth\u201d to question 1<br \/>\nReworded \u201cnet income\u201d in question 2<\/li>\n<li>Updated NJDEP address<br \/>\nUpdated instructions for all Sections<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"15\" valign=\"top\"><a id=\"rao\" name=\"rao\"><\/a><a href=\"..\/#rao\">Response Action Outcome form<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">11\/18\/2025<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Replaced by RAO Online Service and RAO Guidance Document<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">3.4 \u2013 11\/15\/2019<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">Form<\/p>\n<ul>\n<li>Added note at top of form to remind users a CID must be submitted with the form.<\/li>\n<\/ul>\n<p>Instructions<\/p>\n<ul>\n<li>Reworded sentence about submitting CID under General Instructions #7.<\/li>\n<li>Fixed broken links to CID in Section B.2<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">3.3 \u2013 5\/27\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">Form<\/p>\n<ul>\n<li>Section A: Bolded and underlined the \u201cAll fees Paid in Full\u201d<\/li>\n<li>Section B: Added question 6 \u201cDoes this RAO address a discharge\/release from a federally regulated UST?\u201d<\/li>\n<\/ul>\n<p>Instructions<\/p>\n<ul>\n<li>Added \u201cAn RAO shall not be filed unless all oversight invoices and annual remediation fees have been paid\u201d to Applicability and to instructions for checkbox in section A.<\/li>\n<li>Moved Note in Section B from end of section to under question 2;<\/li>\n<li>Added instructions with Applicability Table for new question 6.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">3.2 \u2013 4\/1\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Split into 2 forms. Common sections and certifications in the key document forms were moved into a new cover form called the Cover\/Certification Form.The following sections were moved: A \u2013 Site Information; B \u2013 Submission Status; C \u2013 Site Use; D \u2013 Case Type; E \u2013 Public Funds; and certifications for the<br \/>\nPerson Responsible and LSRP.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">3.1 \u2013 6\/26\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section G: Added \u201cNaturally Occurring Levels of Constituents in Ground Water\u201d and \u201cHistorically Applied Pesticides not Addressed\u201d to list of notices.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">3.0 \u2013 6\/9\/2014<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Sec A Site Name: Removed \u201cDate Rem Initiated\u201d and \u201cState Plane Coord\u201d<\/li>\n<li>Sec B Submission:<br \/>\nChanged title from \u201cSubmittal\u201d to \u201cSubmission\u201d<br \/>\nAdded checkbox for Fees are Paid in Full<br \/>\nSorted list alphabetically, split RI\/RAW into two lines, and added new column \u201cDate of Previous NJDEP Approval\u201d<\/li>\n<li>Sec C Site Use: Added \u201cOther\u201d to Intended Future Site Use<\/li>\n<li>Sec D Case type:<br \/>\nAdded \u201cOther\u201d to list<br \/>\nRemoved \u201cTSCA\u201d and \u201cOther\u201d from Federal Case types<br \/>\nAdded Question 1 \u201cIs the party conducting remediation a government entity?\u201d<\/li>\n<li>Sec E Public Funds (old): Removed<\/li>\n<li>Sec E Scope of Rem: Added extent of rem (old Sec H)<br \/>\nRemoved two checkboxes for Child Care RAOs<\/li>\n<li>Sec G Fees (old): Moved into Sec B<\/li>\n<li>Sec H Extent of Rem (old): Moved into Sec E Scope of Rem<\/li>\n<li>Sec F RAO Prep Checks: Removed question 5 \u201chave all fees been paid?\u201d<\/li>\n<li>Sec J App Rem STDs: Removed<\/li>\n<li>Sec K Media impacted: Removed<\/li>\n<li>Sec L Alt STDs Removed<\/li>\n<li>Sec G(new) RAO Notices:<br \/>\nAdded \u201cBuilding Interiors Addressed\u201d<br \/>\nRemoved childcare notices<br \/>\nAdded \u201cAdditions to Model Document\u201d with 4 notices<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">2.0 \u2013 3\/25\/2013<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B Submittal Status: Added Technical Impracticability Determination to the list.<\/li>\n<li>Section D Case Type: Added new Section D: Case Type.<\/li>\n<li>Section J Applicable STDs:<br \/>\nChanged \u201ccompounds\u201d to \u201ccontaminants\u201d in Question 1.<br \/>\nAdded table of compliance averaging methods to Question 2.<\/li>\n<li>Section K Media Impacted: Question 4 \u2013 added \u201csite specific\u201d.<\/li>\n<li>Section L Alt STDs: Added \u201cecological site specific goal\u201d.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.9 \u2013 8\/23\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Fixed page numbering error<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.8 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">Form<\/p>\n<ul>\n<li>General Instructions: Modified instructions for submission<br \/>\nof RE forms and Case Inventory Documents (CID).<\/li>\n<li>Section B: added radionuclide reports list.<\/li>\n<li>Section F: changed child care fee from $225 to $450.<\/li>\n<li>Section E: added checkbox for \u201cLease Hold Portion Only \u2013<br \/>\nChild Care Center Facility\u201d to question 1.<\/li>\n<li>Added question 4 \u201cAre there AOCs where an ROA has not been<br \/>\nfiled\u201d.<\/li>\n<\/ul>\n<p>Instructions<\/p>\n<ul>\n<li>General instructions: Added item 4 indicating supporting document<br \/>\nmust be submitted with the RAO. Added \u201cCompleted forms should<br \/>\nbe sent to\u2026\u201d<\/li>\n<li>Updated instructions for Sections A, B, E, J, L<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.7 \u2013 1\/10\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">Form<\/p>\n<ul>\n<li>General: Removed formatting for zip code.<\/li>\n<li>Section A: Changed citation for \u201cDate Remediation Initiated.\u201d<\/li>\n<li>Section B: Changed title to \u201cSubmittal Status\u201d, updated Alternate<br \/>\nStandard form name, replaced Annual Fee form with Public Notification<br \/>\nForm, and added withdrawal column.<\/li>\n<li>Section C: Added \u201cGovernment\u201d to current and future uses,<br \/>\nand deleted \u201cAgriculture\u201d from future use.<\/li>\n<li>Section E: Added 2 questions identifying total number of AOCs<br \/>\nfor the site and total AOCs addressed in this submittal.<\/li>\n<li>Section I: New section \u201cApplicable remediation Standards\u201d<br \/>\ncreated out question 1.<\/li>\n<li>Section J: Changed the word \u201cdeviation\u201d to \u201cvariance\u201d and<br \/>\nadded \u201cor alternate vapor intrusion screening level\u201d, and added<br \/>\nquestion: \u201cA site-specific screening level was developed for<br \/>\nthe evaluation of the VI pathway.\u201d<\/li>\n<li>Section K: (old section J) changed the word \u201cdeviation\u201d to<br \/>\n\u201cvariance\u201d through out section.<\/li>\n<li>Section L: (old section K) question 3. changed \u201cground water<br \/>\ncontamination not yet remediated\u201d to \u201cground water contamination<br \/>\nnot yet investigated.\u201d<\/li>\n<\/ul>\n<p>Instructions<\/p>\n<ul>\n<li>General instructions: Added item 4 indicating supporting document<br \/>\nmust be submitted with the RAO. Added \u201cCompleted forms should<br \/>\nbe sent to\u2026\u201d<\/li>\n<li>Updated instructions for Sections A, B, E, J, L<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.6 \u2013 9\/7\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Intro: Deleted introduction paragraph and note.<\/li>\n<li>Section A: Removed \u201cmailing adddress if different than<br \/>\nstreet address\u201d Changed \u201cDate trigger compliance with<br \/>\nSection 30 of Site Remediation Reform Act P.L.\u201d to \u201cDate<br \/>\nRemediation Initiated Pursuant to N.J.A.C. 7:26C-2.2 or 2.3(b):\u201d<\/li>\n<li>Section B: Expanded list of required submittals to match other<br \/>\nforms.<\/li>\n<li>Section F: Added Section F for child care fee<\/li>\n<li>Instructions: Updated version and date to match form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.5 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<li>11 New check boxes added under Section J. 3. to reflect the<br \/>\naddition of the new \u201cGroundwater Contamination due to<br \/>\nRegional Historic Fill\u201d notice and \u201cChild Care Center<br \/>\nNotices.\u201d The \u201cChild Care Center Notices\u201d<br \/>\ncheck box consolidates\/replaces three Child Care notices\/check<br \/>\nboxes that have been deleted. Same notice changes made to the<br \/>\nRAO Shell Document.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.4 \u2013 3\/4\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 2\/9\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>The Response Action Outcome (RAO) Form and Instructions have<br \/>\nbeen modified to solicit information regarding the existence<br \/>\nof a Remediation Funding Source (RFS) for the remediation for<br \/>\nwhich the RAO is being issued.<\/li>\n<li>Section K of the RAO Form will now identify in accordance<br \/>\nwith N.J.A.C. 7:26C-5 whether a RFS has been posted and, if<br \/>\nposted, serve as notice (if applicable) to the Department that<br \/>\nall or part of the RFS needs to be returned. The RAO Form and<br \/>\nInstructions further provides a reminder that the \u201cRemediation<br \/>\nCost Review Form\u201d must be included with the submission<br \/>\nif either a return or decrease in the RFS is being requested.<br \/>\nBy completing this information, the Department will be able<br \/>\nto identify those cases where RFS needs to be returned or reduced<br \/>\nin a more efficient manner allowing for prompt return of the<br \/>\nRFS. The labeling of the sections of the RAO form following<br \/>\nthe new Section K have also been adjusted.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 1\/12\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Grammar &amp; punctuation,<\/li>\n<li>Section E: ISRA leasehold properties clarification;<\/li>\n<li>Section K: Developer Certification removed<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormNameIndented\" valign=\"top\"><a id=\"model_action_response\" name=\"model_action_response\"><\/a><a href=\"..\/#model_action_response\">Model Response Action Outcome (Appendix D for the ARRCS Rule)<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\"><\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed due to duplication within the RAO Guidance Document<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormNameIndented\" valign=\"top\"><a id=\"response_notice\" name=\"response_notice\"><\/a><a href=\"..\/#response_notice\">Response Action Outcome Notices<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\"><\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed due to duplication within the RAO Guidance Document<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"5\" valign=\"top\"><a id=\"sc_info_update\" name=\"sc_info_update\"><\/a><a href=\"..\/#sc_info_update\">Site and Contact Information Update Form<\/a><\/p>\n<p class=\"name_change\">(Was \u201cName and Address Change Reporting\u201d form)<\/p>\n<\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.4 \u2013 11\/6\/2025<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li><a href=\"https:\/\/deptest.nj.gov\/srp\/wp-content\/uploads\/sites\/39\/site_and_contact_info_update_changelog.pdf\" target=\"_blank\" rel=\"noopener\">Change log<\/a> <span class=\"text-12\">[pdf]<\/span><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.3 \u2013 10\/18\/2017<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section A: Added \u201cTax Lot Address (if different)\u201d<\/li>\n<li>Section B: reorganized the list of items to changed<\/li>\n<li>Section C:<br \/>\n\u2013 Added check boxes to indicate if changes are for address or block and info<br \/>\n\u2013 Added \u201cTax Lot Address (if different)\u201d<\/li>\n<li>Sections D, E, F, and G eliminated<\/li>\n<li>Added \u201cRelationship to Site\u201d checkboxes in both \u201cRP Information and Certification\u201d and \u201cPRCR Information and Certification\u201d<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.2 \u2013 4\/1\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Name changed to \u201cSite and Contact Information Update Form\u201d.<\/li>\n<li>Form completely redesigned<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.1 \u2013 3\/13\/2013<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Form completely reformatted.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.0 \u2013 9\/7\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New document.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"3\" valign=\"top\"><a id=\"sir_online\" name=\"sir_online\"><\/a><a href=\"..\/#sir_online\">Site Investigation Report Service \u2013 Online<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 1\/15\/2020<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Added 4 questions about emerging contaminants after SI Submission Scope.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 8\/21\/2017<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated Instructions<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 3\/15\/2017<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"4\" valign=\"top\"><a id=\"tag\" name=\"tag\"><\/a><a href=\"..\/#tag\">Technical Assistance Grant form<\/a><\/td>\n<td valign=\"top\">1.4 \u2013 9\/17\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.3 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 3\/4\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.1 \u2013 1\/12\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Grammar &amp; punctuation<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"3\" valign=\"top\"><a id=\"termination_notice\" name=\"termination_notice\"><\/a><a href=\"..\/#termination_notice\">Termination of Deed Notice Form<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.2 \u2013 6\/2\/2022<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Update logo image and replaced \u201cand\u201d with ampersand<\/li>\n<li>Section B: updated note regarding fees at beginning of section<\/li>\n<li>Section C: updated wording of checkbox at the bottom of the section regarding Primary Contact for Permit Compliance<\/li>\n<li>Section D: updated wording of checkbox at the bottom of the section regarding Primary Contact for Permit Compliance<\/li>\n<li>Addendum A: added a checkbox to indicate if the Person Responsible for Conducting the Remediation is the Primary Contact for Permit Compliance<\/li>\n<li>Addendum B: added a checkbox to indicate if the owner is the Primary Contact for Permit Compliance<\/li>\n<li>Addendum C: Addendum for Section F moved from Addendum B to Addendum C<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.1 \u2013 6\/15\/2020<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section B: Added note at end of section providing instructions for having the document sent to someone else instead of the LSRP.<\/li>\n<li>Section E: removed the section<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.0 \u2013 5\/30\/2019<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li style=\"color: green\">New document.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"2\" valign=\"top\"><a id=\"ust_noi_online\" name=\"ust_noi_online\"><\/a> <a href=\"..\/#ust_noi_online\">Underground Storage Tank Notice of Intent to Close<\/a><\/td>\n<td valign=\"top\">1.1 \u2013 10\/15\/2024<\/td>\n<td class=\"override cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated header to reflect the name change from Site Remediation to Contaminated Site Remediation &amp; Redevelopment.<\/li>\n<li>Updated old and outdated links, where applicable, with new ones.<\/li>\n<li>Updated #6. Tank Selection: text<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.0 \u2013 10\/03\/2016<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li style=\"color: green\">New Instructions<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormNameIndented\" valign=\"top\"><a id=\"unoc_bldg_cert\" name=\"unoc_bldg_cert\"><\/a><a href=\"..\/#unoc_bldg_cert\">Unoccupied Building to be Demolished \u2013 Certification Form<\/a><\/td>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">1.0 \u2013 11\/17\/2025<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"8\" valign=\"top\"><a id=\"vc_response_action\" name=\"vc_response_action\"><\/a><a href=\"..\/#vc_response_action\">Vapor Concern (VC) Response Action Form<\/a><\/td>\n<td valign=\"top\">1.5 \u2013 1\/6\/2023<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Header: Updated logo and program name, added check boxes for LSRP and Subsurface Eval<\/li>\n<li>Section C: bolded \u201csource\u201d, underline \u201cmust\u201d<\/li>\n<li>Section D: Removed \u201cIEC and\u201d from note<\/li>\n<li>Section E:<br \/>\n\u2013 updated language under question 3 in 14-Day Notification<br \/>\n\u2013 Added note requiring submission of data and maps<\/li>\n<li>Section G:<br \/>\n\u2013 Added a subsurface evaluator certification<br \/>\n\u2013 Updated program name in address<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.4 \u2013 9\/17\/2018<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Updated LSRP Certification language<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.3 \u2013 3\/26\/2015<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section A: Changed Incident Numbers to Case Tracking Numbers<\/li>\n<li>Section B: Removed question \u201cDo you have an assigned case manager?\u201d<\/li>\n<li>Section C: New section added \u201cOff Site Source Claim\u201d<\/li>\n<li>Section D: Under Fee Billing Contact added space for phone number and email address, and a note.<\/li>\n<li>Section E:<br \/>\n\u2013 Under 14 Day Notification fixed Contact Name\/Agency<br \/>\n\u2013 Removed question under 180 Day Reporting<\/li>\n<li>Removed old sections E (Contaminant Source) and F (Vapor Intrusion Pathway Evaluation)<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.2 \u2013 5\/7\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Removed Non-LSRP and Subsurface Evaluator certification pages.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.1 \u2013 1\/19\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Section A: Removed \u201cmailing Address if different than street<br \/>\naddress\u201d<\/li>\n<li>Section E: changed all questions from check boxes to yes\/no<br \/>\nquestions.<\/li>\n<li>Section F: Changed \u201cwithin 100\u2019 of free product (any<br \/>\ntype)\u201d to \u201cwithin 100\u2019 of free product (excluding diesel)\u201d<br \/>\nIncorporated \u201cfree product type\u201d question into other questions<br \/>\nChanged \u201cground water\u201d to-indoor air pathway\u201d to \u201cvapor intrusion pathway\u201d.<\/li>\n<li>Updated instructions for sections A, C, F and G<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\">1.0 \u2013 5\/25\/2011<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Address change to reflect the new DEP mail codes.<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">0.2 \u2013 2\/25\/2011 <span class=\"infoNote\">Draft<\/span><\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>Allows the Yes\/ No Check boxes to be checked &amp; unchecked<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellVerInfo\" valign=\"top\" nowrap=\"nowrap\">0.1 \u2013 1\/12\/2011 <span class=\"infoNote\">Draft<\/span><\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li>New version number for splitting the instructions from the<br \/>\nform<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"cellFormName\" rowspan=\"1\" valign=\"top\"><a id=\"variance_identification\" name=\"variance_identification\"><\/a><a href=\"..\/#variance_identification\">Variance Identification Form<\/a><\/td>\n<td valign=\"top\">1.0 \u2013 7\/11\/2012<\/td>\n<td class=\"cellChangesInfo\" valign=\"top\">\n<ul>\n<li style=\"color: green\">New Form<\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row][vc_column][breadcrumb-shortcode][vc_column_text css=&#8221;&#8221;] CSRR Forms Update Log Quick Jumps to the Forms&#8217; Update Log 7.5 Percent Cost of Remediation Summary and Certification Alternative Remedy Application Form Alternative or New Remediation Standard and\/or Screening Level Application form Remediation Standard Notification Spreadsheet Annual Remediation Fee Reporting form Annual Remediation Fee Reporting form (Online) Case Inventory Document Worksheet Case [&hellip;]<\/p>\n","protected":false},"author":131,"featured_media":0,"parent":4269,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"fullwidth.php","meta":{"footnotes":""},"class_list":["post-4285","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/deptest.nj.gov\/srp\/wp-json\/wp\/v2\/pages\/4285","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/deptest.nj.gov\/srp\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/deptest.nj.gov\/srp\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/deptest.nj.gov\/srp\/wp-json\/wp\/v2\/users\/131"}],"replies":[{"embeddable":true,"href":"https:\/\/deptest.nj.gov\/srp\/wp-json\/wp\/v2\/comments?post=4285"}],"version-history":[{"count":38,"href":"https:\/\/deptest.nj.gov\/srp\/wp-json\/wp\/v2\/pages\/4285\/revisions"}],"predecessor-version":[{"id":10399,"href":"https:\/\/deptest.nj.gov\/srp\/wp-json\/wp\/v2\/pages\/4285\/revisions\/10399"}],"up":[{"embeddable":true,"href":"https:\/\/deptest.nj.gov\/srp\/wp-json\/wp\/v2\/pages\/4269"}],"wp:attachment":[{"href":"https:\/\/deptest.nj.gov\/srp\/wp-json\/wp\/v2\/media?parent=4285"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}